Plan & takeoffs
Job takeoffs
A takeoff is the trade word for the list a job produces: every material it needs, and how much of each. Pick the job, give its dimensions once, and every trade comes back together, each from its own cited calculator.
- 79Job takeoffs
- 551546Trades between them
- 72With labour hours
- 78With a quote check
Estimating copilot
Describe the job
Write it the way you would say it. The site picks the takeoffs and calculators, shows every measurement it read and every one it assumed, and lists anything it did not understand. Nothing leaves this browser.
You have a space
Plan it
Measure the space and a planner works out every surface, lays the options you have not chosen yet side by side, and keeps what you decide. 25 planners: room, deck, driveway, fence, exterior wall, retaining wall, slab, loft, stair, patio, lawn, raised bed, pergola, garden wall, shed, gutter, partition wall, basement wall, kitchen run, roof, garage floor, closet, strip footing, pond, pool. Every planner
You know the job
Take it off
Fit out a room, tile a bathroom, lay a driveway, frame a wall: 79 named jobs, each returning every trade’s quantity from a few dimensions, ready to price and to put into a project.
Find the job
All 79 takeoffs
Interiors 19 takeoffs
Boarding, finishes, floors and trim inside a finished shell.
Room fit-out
Asks 5 (3 dimensions) · gives 7 trades
Board, fill, paint and floor a rectangular room, walls and ceiling, from one set of dimensions.
Drywall · Ceiling Plasterboard (Gypsum Board Sheets) · Drywall Joint Compound +4
Labour hoursCheck a quoteRoom planner
Stud partition
Asks 3 (2 dimensions) · gives 3 trades
Studs, jointing compound and outlets for a single run of internal partition.
Framing Stud · Drywall Joint Compound · Outlet Spacing
Labour hoursCheck a quoteRoom planner
What it runs (3)
Tile a floor
Asks 2 dimensions · gives 4 trades
Backer board, the thinset it is bedded in, tile and adhesive for a rectangular floor from one measurement.
Tile Backer Board · Thinset & Tile Adhesive · Floor & Wall Tile
Labour hoursCheck a quoteRoom planner
Plaster a room
Asks 5 (3 dimensions) · gives 4 trades
Plaster, beads and protection for a room, with the background choosing between a skim and a float and set.
Plaster Angle and Stop Bead · Masking and Protection Materials · Skim Coat Plaster +1
Labour hoursCheck a quote
Drywall ceiling
Asks 2 dimensions · gives 6 trades
Boards, screws, tape, compound and control joints for a flat plasterboard ceiling from the room's two dimensions.
Ceiling Plasterboard (Gypsum Board Sheets) · Drywall Ceiling Screw Count (Fastening Schedule) · Drywall Joint Compound +2
Labour hoursCheck a quoteRoom planner
Repaint a room
Asks 6 (3 dimensions) · gives 5 trades
Paint for redecorating a room: the walls with the openings taken out, the ceiling, and the doors, frames and skirting, with the primer, the dust sheets and the tape, and the stripping, filling and making good listed as work.
Masking and Protection Materials · Paint Primer · Ceiling Paint +2
Labour hoursCheck a quoteRoom planner
Tile a wall
Asks 2 dimensions · gives 3 trades
Backer board, tile, adhesive and grout for a tiled wall, splashback or hearth surround.
Tile Backer Board · Tile & Grout · Thinset & Tile Adhesive
Labour hoursCheck a quoteRoom planner
What it runs (3)
LVP, laminate or engineered floor
Asks 2 dimensions · gives 3 trades
Packs, underlay and levelling compound for a floating floor over an existing subfloor.
LVP, Laminate & Engineered Floor · Laminate/Vinyl Plank Floor Underlayment Roll · Self-Leveling Underlayment (SLU) Volume
Labour hoursCheck a quoteRoom planner
Carpet and cushion
Asks 4 (3 dimensions) · gives 3 trades
Carpet roll length, cushion and seam tape for a room, from the number of drops its width takes off the roll.
Carpet Roll Length & Waste · Carpet Cushion Roll · Carpet Seam Tape and Sealer
Labour hoursCheck a quoteRoom planner
Baseboard and casing
Asks 5 (2 dimensions) · gives 2 trades
Skirting around a room and casing around its openings, as lengths with a stick count pooled across the room.
Baseboard & Trim · Door & Window Casing
Labour hoursCheck a quoteRoom planner
What it runs (2)
Suspended ceiling grid
Asks 3 dimensions · gives 4 trades
Tiles, hanger wires, wall angle and runner splices for a lay-in grid ceiling.
Drop Ceiling Tile · Suspended Ceiling Wire Hanger Count · Suspended Ceiling Wall Angle Take-Off +1
Garage conversion
Asks 9 (8 dimensions) · gives 25 trades
Turn a garage into a room: the new wall and window across the door opening, the floor raised and insulated over a damp-proof membrane, the old walls lined and insulated, the ceiling, the boarding and the finishes, with the footing and any lintel listed and never sized.
Concrete CMU Block Counter & Grout Infill · Brick · Brick Veneer Wall Tie Density +16
Labour hoursCheck a quoteRoom planner
What it runs (25)
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Brick
- Brick
- Brick Veneer Wall Tie Density
- Cavity Wall Weep Hole Spacing
- Foam Board Insulation
- Window Opening Flashing Membrane
- Foam Board Insulation
- Framing Stud
- Insulation Batt
- Insulation Batt
- Outlet Spacing
- Drywall
- Ceiling Plasterboard (Gypsum Board Sheets)
- Drywall Joint Compound
- Paint
- Ceiling Paint
- Paint
- Ceiling Paint
- Laminate/Vinyl Plank Floor Underlayment Roll
- LVP, Laminate & Engineered Floor
- Floor Transition Strip
- Baseboard & Trim
- Skip & Dumpster Size
Basement or cellar conversion
Asks 6 (4 dimensions) · gives 13 trades12 trades
Turn a cellar or basement into a habitable room: strip it out, keep water out with a drained cavity membrane, a barrier coating or both, insulate and line the walls on studs or with boards, board the ceiling as a fire separation, finish and decorate, with any underpinning, lowering, new slab and escape window listed and never sized.
Skip & Dumpster Size · Perimeter Weeping Tile Pipe Segment · Foam Board Insulation +9
Skip & Dumpster Size · Perimeter Weeping Tile Pipe Segment · Foam Board Insulation +8
Labour hoursCheck a quoteRoom planner
What it runs (13)
- Skip & Dumpster Size
- Perimeter Weeping Tile Pipe Segment
- Foam Board Insulation
- Framing Stud
- Mineral Wool Insulation Batt
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Drywall Joint Compound
- Drywall Joint Tape
- Paint
- Ceiling Paint
- LVP, Laminate & Engineered Floor
- Baseboard & Trim
What it runs (12)
Staircase replacement
Asks 10 (9 dimensions) · gives 8 trades6 trades
Replace a house's staircase with a new timber flight: dust sheets, the new flight's risers and treads checked against the reader's own rules, the handrail up the pitch and a second one where the flight takes two, spindles (balusters) counted to the IRC's landing gap, the skim on the stairwell's walls, gloss on the strings and the landing's apron, and the skip, with the temporary way up, the strip-out, any trimming of the stairwell, the floor at the landing and the foot, the boards under the flight and the floor finishes listed, never sized and never certified.
Masking and Protection Materials · Stair Rise & Run · Skim Coat Plaster +4
Masking and Protection Materials · Stair Rise & Run · Skim Coat Plaster +3
Labour hoursCheck a quoteStair planner
What it runs (8)
New staircase by type
Asks 4 (3 dimensions) · gives 2 trades
Count a new staircase by its shape and its material: a straight flight, an L on a quarter landing or a U on a half landing, in timber (treads, risers, stringers and landing framing), cast concrete (concrete, formwork and the drawing's bars) or steel (stringers cut to length, tread plates, brackets and weight), with the handrail up the pitch, from the rise, the going and the width, the structure and the stairwell's trimming listed and never sized.
L-Shaped and U-Shaped Stair (Landings, Winders, Stringers, Treads and Risers) · Handrail Length
Labour hoursCheck a quote
Fitted wardrobe
Asks 7 (6 dimensions) · gives 4 trades
Fit a wardrobe (a built-in closet) along a bedroom wall: dust sheets and a masking line round its front, the shelf board for its hanging from the run's width, the woodwork paint where the doors and trims are painted on site and the skirting (baseboard) refitted round it, with the carcasses, scribes, plinth, cornice and doors listed as the joinery they are, and the moved socket and any lighting listed as the electrician's and never certified.
Masking and Protection Materials · Closet Shelving · Baseboard & Trim +1
Labour hoursCheck a quoteRoom planner
Party wall soundproofing
Asks 3 dimensions · gives 9 trades
Line a party wall (a demising or shared wall) against a neighbour's noise: an independent stud frame clear of it, or resilient bars or sound clips on it, mineral wool in the void, mass-loaded vinyl where the specification has it, two layers of dense plasterboard (drywall) sealed at every edge, a skim in metric or taped joints in imperial, skirting (baseboard) and paint, with the sockets brought forward, their putty pads and a radiator rehung listed, no sound rating claimed and nothing certified.
Masking and Protection Materials · Framing Stud · Mineral Wool Insulation Batt +6
Masking and Protection Materials · Framing Stud · Mineral Wool Insulation Batt +6
Labour hoursCheck a quoteRoom planner
What it runs (9)
Damp remediation and replastering
Asks 8 (6 dimensions) · gives 5 trades
Carry out the remedy a damp specification names on the walls it names: dust sheets and a taped doorway, the plaster hacked off a band to the height the specification sets, a tanking slurry where that is the remedy, the band skimmed over its backing coat, the skirting (baseboard) refitted along it, the room repainted wall to wall once the wall has dried, and the skip, with the survey, an injected damp-proof course (damp course) or a membrane, the backing coat, the radiator and the sockets listed, and nothing prescribed or promised.
Masking and Protection Materials · Skim Coat Plaster · Baseboard & Trim +2
Labour hoursCheck a quoteRoom planner
Floor sanding and refinishing
Asks 5 (4 dimensions) · gives 5 trades
Sand a wood floor back to bare timber and finish it again: dust sheets outside the doors and tape along the skirting (baseboard), the sealer and finish coat by coat with the abrasives for every grit in its working, the beading (quarter round or shoe molding) refitted, a threshold strip at each doorway and a skip for a carpet lifted first, with the lead test, the board preparation, the sanding, the gap filling and the doors off and rehung listed, and nothing certified.
Masking and Protection Materials · Floor Sanding and Finish · Baseboard & Trim +2
Labour hoursCheck a quoteRoom planner
Kitchens and bathrooms 6 takeoffs
The rooms where waterproofing decides whether the rest of it lasts.
Kitchen refit
Asks 17 (13 dimensions) · gives 16 trades
Strip out a kitchen and fit a new one: base and wall units by standard width, the worktop (countertop) in stock lengths or as a template area, plinth (toe kick) and cornice, a tiled splashback, the new floor and the decoration, with the plumbing, electrical and gas work listed and never certified.
Masking and Protection Materials · Kitchen Unit and Cabinet Run · Floor & Wall Tile +9
Labour hoursCheck a quoteRoom planner
What it runs (16)
- Masking and Protection Materials
- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- Floor & Wall Tile
- Thinset & Tile Adhesive
- Grout
- Tile Edge Profile (Trim Strip) Linear Footage
- Paint
- Ceiling Paint
- Laminate/Vinyl Plank Floor Underlayment Roll
- LVP, Laminate & Engineered Floor
- Floor Transition Strip
- Kitchen Unit and Cabinet Run
- Skip & Dumpster Size
Bathroom remodel
Asks 4 dimensions · gives 4 trades
Floor tiling, backer board, adhesive and the extract fan's airflow for a full bathroom strip-out and refit, with the bath or tray, the tanking, the wall tiling, the sanitaryware and the services listed as work and never certified.
Tile Backer Board · Floor & Wall Tile · Bathroom Extract Fan Rate and Duct Resistance +1
Labour hoursCheck a quoteRoom planner
Shower enclosure
Asks 8 (6 dimensions) · gives 4 trades
Tanking, backer board, tile and adhesive for the walls and tray area of a shower.
Wet Room Tanking and Waterproof Membrane · Tile Backer Board · Tile & Grout +1
Labour hoursCheck a quoteRoom planner
Kitchen splashback
Asks 3 dimensions · gives 3 trades
Worktop area, tile and adhesive for the run between a counter and the wall units.
Countertop Area · Tile & Grout · Thinset & Tile Adhesive
Labour hoursCheck a quoteKitchen run planner
What it runs (3)
Heated bathroom floor
Asks 4 dimensions · gives 5 trades
Hydronic loop or electric mat, crack isolation, tile and adhesive for a warm tiled floor.
Radiant Floor PEX Tubing · Electric Underfloor Heating Mat Area · Floor Crack Isolation Membrane Coverage +2
Labour hoursCheck a quoteRoom planner
Wet-room tanking
Asks 7 (5 dimensions) · gives 3 trades
Liquid membrane, isolation layer and backer board for a room with no tray and no threshold.
Wet Room Tanking and Waterproof Membrane · Floor Crack Isolation Membrane Coverage · Tile Backer Board
Labour hoursCheck a quoteRoom planner
Envelope 21 takeoffs
Framing, sheathing, cladding, roofing and insulation — everything that keeps weather out.
External wall finish
Asks 2 dimensions · gives 3 trades
Wrap, cladding and finish over a measured wall area.
House Wrap · Siding · Exterior Paint
Labour hoursCheck a quoteExterior wall planner
What it runs (3)
Insulate a floor
Asks 2 dimensions · gives 3 trades
Insulation, vapour control and underlayment over a floor area.
Foam Board Insulation · Vapor Barrier · Laminate/Vinyl Plank Floor Underlayment Roll
Labour hoursCheck a quoteRoom planner
Fibre cement siding
Asks 4 (3 dimensions) · gives 5 trades
Courses, cutting waste, corner posts, fasteners and caulk for a lap-sided elevation.
Fiber-Cement Siding Plank Reveal & Course · Fiber-Cement Siding Cutting Waste Factor · Fiber-Cement Siding Corner Post +2
Labour hoursCheck a quote
Asphalt shingle roof
Asks 11 (8 dimensions) · gives 7 trades
Shingles, underlayment, ice-dam membrane, ridge cap and ridge vent from the roof's footprint.
Roofing Shingle · Roofing Underlayment · Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining) +3
Labour hoursCheck a quoteRoof planner
Standing seam metal roof
Asks 3 (2 dimensions) · gives 6 trades
Panels, clips, thermal movement and underlayment for a lean-to or a plain gable of a concealed-fix metal roof.
Metal Roof Panel · Standing Seam Metal Roof Clip Count · Standing Seam Roof Thermal Movement +1
Labour hoursCheck a quoteRoof planner
Eaves and rainwater
Asks 3 (2 dimensions) · gives 5 trades
Fascia, soffit, gutter, hangers and guard — five trades off one total eave length.
Fascia Board · Soffit Panel · Gutter +2
Labour hoursCheck a quoteGutter planner
What it runs (5)
Attic insulation upgrade
Asks 5 (3 dimensions) · gives 3 trades
How much more depth an attic needs, and the bags or batts to reach it.
Attic Insulation Upgrade · Blown-In Insulation Bag Count · Insulation Batt
Labour hoursCheck a quoteLoft planner
Window replacement
Asks 4 (3 dimensions) · gives 4 trades
Rough opening, flashing membrane, casing and the heat-loss change for a window swap.
Fenestration Rough Opening · Window Opening Flashing Membrane · Door & Window Casing +1
Labour hoursCheck a quote
Framed exterior wall
Asks 8 (4 dimensions) · gives 6 trades
Studs, insulation, sheathing, wrap and cladding for a new timber-framed wall — every build-up of it on one page.
Framing Stud · Insulation Batt · Wall Plates, Headers and Cripples (Sole Plate, Head Binder, Lintel and Corner Studs) +3
Labour hoursCheck a quoteExterior wall planner
Flat roof replacement (warm roof)
Asks 7 dimensions · gives 10 trades
Strip an old flat roof and rebuild it warm: deck, insulation on top of it, the waterproofing you choose, upstands, flashings, gutter and the skip.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Foam Board Insulation +7
Labour hoursCheck a quoteGutter planner
Loft conversion with a dormer
Asks 17 (14 dimensions) · gives 32 trades31 trades
Turn a loft into a room under a rear box dormer: the dormer's deck, warm-roof insulation and waterproofing, the cheeks' membrane and flashings, the knee wall and partitions, insulation, boards and finishes, and an optional shower room, with the floor, the steels, the dormer's frame and the stair listed and never sized.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Plywood and OSB Sheet (Subfloor, Wall and Roof) +22
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Plywood and OSB Sheet (Subfloor, Wall and Roof) +21
Labour hoursCheck a quoteRoom planner
What it runs (32)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Roof Perimeter Termination Bar
- Roof Membrane Termination Bar Fastener
- Fascia Board
- Roofing Underlayment
- Exterior Flashing Layout Trim Sheet
- Gutter
- Window Opening Flashing Membrane
- Framing Stud
- Foam Board Insulation
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Multi-Layer Fire-Rated (Type X) Gypsum Sheet
- Drywall Joint Compound
- Drywall Joint Tape
- Cold-Applied Liquid Waterproofing Membrane Volume
- Floor & Wall Tile
- Thinset & Tile Adhesive
- Grout
- Ceiling Paint
- Ceiling Paint
- Baseboard & Trim
- Ceiling Paint
- Ceiling Paint
- Skip & Dumpster Size
What it runs (31)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Roof Perimeter Termination Bar
- Roof Membrane Termination Bar Fastener
- Fascia Board
- Roofing Underlayment
- Exterior Flashing Layout Trim Sheet
- Gutter
- Window Opening Flashing Membrane
- Framing Stud
- Foam Board Insulation
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Multi-Layer Fire-Rated (Type X) Gypsum Sheet
- Skim Coat Plaster
- Cold-Applied Liquid Waterproofing Membrane Volume
- Floor & Wall Tile
- Thinset & Tile Adhesive
- Grout
- Ceiling Paint
- Ceiling Paint
- Baseboard & Trim
- Ceiling Paint
- Ceiling Paint
- Skip & Dumpster Size
Loft room with rooflights
Asks 11 (8 dimensions) · gives 16 trades15 trades
Turn a loft into a room under its own roof, lit by rooflights (roof windows) and with no dormer: insulation in the slopes, knee walls and over the flat ceiling, sound insulation in the new floor, studs for the knee walls, boards on the ceilings, slopes, reveals and walls, skimmed or taped, paint, skirting and the skip, with the floor, any beam, the trimming and the stair listed and never sized.
Masking and Protection Materials · Framing Stud · Foam Board Insulation +7
Masking and Protection Materials · Framing Stud · Foam Board Insulation +6
Labour hoursCheck a quoteRoom planner
What it runs (16)
- Masking and Protection Materials
- Framing Stud
- Foam Board Insulation
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Drywall Joint Compound
- Drywall Joint Tape
- Ceiling Paint
- Ceiling Paint
- Baseboard & Trim
- Ceiling Paint
- Ceiling Paint
- Skip & Dumpster Size
What it runs (15)
- Masking and Protection Materials
- Framing Stud
- Foam Board Insulation
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Mineral Wool Insulation Batt
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Skim Coat Plaster
- Ceiling Paint
- Ceiling Paint
- Baseboard & Trim
- Ceiling Paint
- Ceiling Paint
- Skip & Dumpster Size
Pitched roof re-covering
Asks 10 (6 dimensions) · gives 12 trades
Strip a pitched roof to its rafters and cover it again: the scaffold, the underlay, battens and tiles or slates (or shingles on a deck), the eaves and ridge ventilation, the flashings and pipe flashings, the fascia and gutters if they are renewed, and the skip, with the rafters flagged and never sized.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining) +8
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining) +8
Labour hoursCheck a quoteRoof planner
What it runs (12)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- Scaffold Face Area and Hire Quantity
- Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)
- Roofing Underlayment
- Attic Rafter Baffle/Chute Count
- Roof Squares
- Ridge Vent Linear Footage
- Roof Ridge Cap
- Roof Vent Pipe Boot Count
- Exterior Flashing Layout Trim Sheet
- Skip & Dumpster Size
What it runs (12)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- Scaffold Face Area and Hire Quantity
- Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)
- Roofing Underlayment
- Attic Rafter Baffle/Chute Count
- Roof Batten Spacing (Tile Roofing)
- Roof Covering Fixing
- Ridge Vent Linear Footage
- Roof Vent Pipe Boot Count
- Exterior Flashing Layout Trim Sheet
- Skip & Dumpster Size
New window or door opening in an outside wall
Asks 10 (8 dimensions) · gives 8 trades
Cut a new window or door into an existing brick, block or cavity wall: the props and the lintel listed and never sized, the cavity closed and the tray and DPCs built in, the frame flashed, the brick or render made good outside, the reveals plastered inside, the room redecorated, and the rubble.
Masking and Protection Materials · Brick · Window Opening Flashing Membrane +4
Labour hoursCheck a quote
External wall insulation (EWI, EIFS)
Asks 11 (9 dimensions) · gives 12 trades
Insulate a house from the outside (EWI in the UK, ETICS in Europe, EIFS in North America): scaffold and protection, the walls prepared and their fixtures taken off, insulation boards bonded and anchored from a starter track, a basecoat with glass-fibre mesh, a thin render finish, movement joints, the frames sealed and the fixtures refixed, with the fire classification and the fixings' wind design flagged and never certified.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · EIFS Foam Board Adhesive Coverage +7
Labour hoursCheck a quote
What it runs (12)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- Scaffold Face Area and Hire Quantity
- EIFS Foam Board Adhesive Coverage
- Continuous Insulation Fastener Count
- EIFS Reinforcing Mesh Roll Count
- EIFS Impact-Resistant Mesh Reinforcement Zone
- Stucco/EIFS Expansion Joint Layout
- Stucco/EIFS Expansion Joint Layout
- EIFS Finish and Primer Pail Count
- Caulk & Sealant
- Skip & Dumpster Size
Rainscreen cladding on battens
Asks 8 (4 dimensions) · gives 11 trades12 trades
Clad a wall in timber, fibre-cement or composite boards or panels on battens (furring strips) over a breather membrane, with a drained, ventilated gap behind: scaffold, the membrane, battens and counter-battens, cavity barriers where a fire strategy draws them, the boards or panels and their fixings, trims, vented closers with insect mesh, mastic at the frames and the offcuts, with the barriers and the fixings' design flagged and never certified.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · House Wrap +7
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · House Wrap +7
Labour hoursCheck a quoteExterior wall planner
What it runs (11)
What it runs (12)
- Masking and Protection Materials
- Scaffold Face Area and Hire Quantity
- House Wrap
- Rain-Screen Cladding Furring Strip
- Cavity Barrier Run and Crossing Count
- Rain-Screen Cladding Furring Strip
- Exterior Flashing Layout Trim Sheet
- Exterior Flashing Layout Trim Sheet
- Board and Batten Siding
- Fiber-Cement Siding Caulk Joint Volume
- Exterior Paint
- Skip & Dumpster Size
External door replacement, with its frame
Asks 3 dimensions · gives 6 trades
Take out an outside door and its frame and fit a new one in the same opening: the doorway protected and made secure overnight, the frame packed and fixed, the threshold and weatherbar (the sill or saddle, in North America), the leaf hung with its ironmongery (hardware), the frame sealed outside and in, the reveals made good, the architrave, the paint and the waste.
Masking and Protection Materials · Window Opening Flashing Membrane · Door & Window Casing +3
Labour hoursCheck a quoteRoom planner
Exterior repaint of a house
Asks 16 (11 dimensions) · gives 8 trades10 trades
Repaint the outside of a house, where preparation is most of the work: access (a scaffold, or ladders and a tower), protection, a lead check on old paint, a biocide wash, the walls and joinery prepared, filled, re-puttied and spot-primed, decayed joinery repaired, then masonry paint on the walls, gloss or trim enamel on the doors, windows and fascias, metal paint on any railings, and the clean-up.
Masking and Protection Materials · Paint Primer · Woodwork Paint +3
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Paint Primer +4
Labour hoursCheck a quoteRoom planner
What it runs (8)
Repointing brickwork (tuckpointing)
Asks 9 (7 dimensions) · gives 4 trades
Rake out and repoint the mortar joints of a brick wall (tuckpointing, as North American quotes call it): the access, the joints worked out from the face and its bricks, the repair mortar in litres gauged as lime and sand or as cement, lime and sand to match the mortar already in the joints, and the frames' mastic (caulk) renewed while the access is up, with the raking out, the spalled bricks, the movement joints and the downpipes taken off and refixed listed, structural cracking flagged and nothing certified.
Scaffold Face Area and Hire Quantity · Tuckpointing Mortar Repair Volume · Lime Mortar Mix (NHL and Lime Putty) +1
Labour hoursCheck a quote
Cavity wall insulation (retrofit fill)
Asks 5 (4 dimensions) · gives 2 trades
Fill a closed wall from outside: a masonry cavity blown with mineral wool or bead, or the stud bays of a framed wall dense-packed with cellulose (drill and fill), with the ground sheeted and the frames masked, and the bags or bales of fill with the wall area, mass and holes in their working, the survey, the vent sleeves, the drilling, the making good and the spillage test listed, the wall's suitability flagged and nothing certified.
Masking and Protection Materials · Cavity Wall & Stud Bay Insulation Fill
Labour hoursCheck a quote
SIP wall (structural insulated panels)
Asks 8 (6 dimensions) · gives 4 trades
Structural insulated panels, splines and plates, then the wrap, the cladding and the interior board for a new SIP wall, from its run, height and openings.
SIP Wall Panel (Structural Insulated Panels, Splines and Plates) · House Wrap · Siding +1
Labour hoursCheck a quoteExterior wall planner
Structure and site 16 takeoffs
Concrete, groundworks, decks and hard landscaping.
Concrete slab
Asks 3 dimensions · gives 3 trades
Concrete, reinforcement and formwork for a ground slab from one set of dimensions.
Concrete · Rebar · Concrete Formwork
Labour hoursCheck a quoteSlab planner
What it runs (3)
Timber deck
Asks 2 dimensions · gives 4 trades
Boards, footings, fixings and finish for a rectangular deck.
Deck Board · Deck Footing · Deck Screws +1
Labour hoursCheck a quoteDeck planner
What it runs (4)
Segmental retaining wall
Asks 3 dimensions · gives 4 trades
Blocks, levelling pad, drainage stone and reinforcement layers for a block retaining wall.
Retaining Wall Block · Gravel Base Layer Tonnage · Retaining Wall Drainage Gravel +1
Labour hoursCheck a quoteRetaining wall planner
Build a masonry wall
Asks 2 dimensions · gives 4 trades
Units, weeps and what holds the wall — anchors for brick veneer, bond beams and rebar for block — plus the movement joints each needs, with the unit choosing which order you get.
Cavity Wall Weep Hole Spacing · Brick · Brick Veneer Anchor Spacing +1
Labour hoursCheck a quoteExterior wall planner
Strip footing
Asks 5 dimensions · gives 3 trades
Concrete, backfill and reinforcement for a continuous footing under a wall.
Continuous Footing / Grade Beam Volume · Trench Excavation & Backfill Volume · Rebar
Labour hoursCheck a quoteStrip footing planner
Concrete driveway
Asks 3 dimensions · gives 3 trades
Concrete, sub-base, mesh and the joints' spacing for a driveway slab, with the dig, the forms, the isolation joints, the cure, a membrane where the slab runs into a garage and a drain where the water cannot soak away listed as work.
Concrete Driveway · Concrete Control Joint Spacing · Rebar
Labour hoursCheck a quote
What it runs (3)
Basement or foundation wall (poured concrete)
Asks 4 dimensions · gives 5 trades
Concrete, a reinforcement grid, the outside waterproofing, its protection board and the footing drain for a new poured basement or foundation wall, from its length, height and thickness.
Concrete · Rebar · Wall Formwork and Shuttering (Form Area, Ties, Wales and Studs for a Poured Wall) +2
Labour hoursCheck a quoteSlab planner
New-build service connections (water and sewer)
Asks 9 dimensions · gives 4 trades
The trenches, bedding, backfill and pipe for a new house's water service and sewer lateral, from each run's length and depth, with the sewer's fall.
Trench Excavation & Backfill Volume · Pipe, Conduit and Cable Run (Length, Fittings and Supports from a Measured Route)
Labour hoursCheck a quote
Paver patio
Asks 2 dimensions · gives 5 trades
Pavers, base, bedding sand, edging, jointing sand and sealer for a laid patio.
Paver · Paver Base & Sand · Paver Edging +2
Labour hoursCheck a quoteDriveway planner
Fence run
Asks 2 dimensions · gives 3 trades
Posts, rails, pickets and the concrete for the post holes along a run of fence.
Fence · Fence Picket · Post Hole Concrete
Labour hoursCheck a quoteFence planner
What it runs (3)
Internal wall removal
Asks 9 (7 dimensions) · gives 13 trades
Take out an internal wall, load-bearing or not: the protection, the rubble and the skip (dumpster), the beam casing, and making good the ceiling, the wall ends and the floor along the old wall line.
Masking and Protection Materials · Demolition Bulk Volume Swell · Ceiling Plasterboard (Gypsum Board Sheets) +8
Labour hoursCheck a quoteRoom planner
What it runs (13)
- Masking and Protection Materials
- Demolition Bulk Volume Swell
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Plaster Angle and Stop Bead
- Float and Set Plaster
- Skim Coat Plaster
- Skim Coat Plaster
- Self-Leveling Underlayment (SLU) Volume
- Paint
- Ceiling Paint
- Baseboard & Trim
- Skip & Dumpster Size
Extension shell, one or two storeys
Asks 14 (12 dimensions) · gives 25 trades
Build a masonry extension to weathertight: pegging out, footings and the walls below the damp course, the ground floor, cavity walls with ties and insulation, a tiled lean-to or pitched roof, gutters and the openings, with the beam into the house and every structural member listed and never sized.
Court Diagonal and Squaring Triangle · Trench Excavation & Backfill Volume · Continuous Footing / Grade Beam Volume +17
Labour hoursCheck a quoteRoof planner
What it runs (25)
- Court Diagonal and Squaring Triangle
- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Concrete
- Scaffold Face Area and Hire Quantity
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Brick
- Brick
- Brick Veneer Wall Tie Density
- Foam Board Insulation
- Cavity Wall Weep Hole Spacing
- Roof Truss Spacing & Count
- Fascia Board
- Roofing Underlayment
- Roof Batten Spacing (Tile Roofing)
- Exterior Flashing Layout Trim Sheet
- Gutter
- Gutter Hanger Spacing
- Window Opening Flashing Membrane
- Skip & Dumpster Size
Chimney breast removal
Asks 11 (9 dimensions) · gives 9 trades8 trades
Take a chimney breast out of one room with the stack above left standing: soot and dust sealed in, the props and the support under what stays listed and never sized, the flue capped and vented, the wall, ceiling and floor where the breast stood made good, the room redecorated, and the rubble.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Ceiling Plasterboard (Gypsum Board Sheets) +5
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Float and Set Plaster +5
Labour hoursCheck a quoteRoom planner
What it runs (9)
Porch addition
Asks 16 (14 dimensions) · gives 33 trades32 trades
Build a porch onto the front of the house: the footings dug by hand, cavity walls with the door and windows lintelled, a tiled or shingled lean-to with its flashing and gutter, a floor slab, the ceiling, plaster or taped drywall and tiles inside, and the doorway into the house, with every structural member listed and never sized.
Trench Excavation & Backfill Volume · Continuous Footing / Grade Beam Volume · Concrete CMU Block Counter & Grout Infill +22
Trench Excavation & Backfill Volume · Continuous Footing / Grade Beam Volume · Concrete CMU Block Counter & Grout Infill +22
Labour hoursCheck a quoteRoom planner
What it runs (33)
- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Concrete
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Brick
- Brick
- Brick
- Brick Veneer Wall Tie Density
- Cavity Wall Weep Hole Spacing
- Roof Truss Spacing & Count
- Fascia Board
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Roofing Underlayment
- Roof Squares
- Exterior Flashing Layout Trim Sheet
- Gutter
- Gutter Hanger Spacing
- Window Opening Flashing Membrane
- Window Opening Flashing Membrane
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Drywall Joint Compound
- Drywall Joint Tape
- Floor & Wall Tile
- Paint
- Ceiling Paint
- Skip & Dumpster Size
What it runs (32)
- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Concrete
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Brick
- Brick
- Brick
- Brick Veneer Wall Tie Density
- Cavity Wall Weep Hole Spacing
- Roof Truss Spacing & Count
- Fascia Board
- Roofing Underlayment
- Roof Batten Spacing (Tile Roofing)
- Roof Covering Fixing
- Exterior Flashing Layout Trim Sheet
- Gutter
- Gutter Hanger Spacing
- Window Opening Flashing Membrane
- Window Opening Flashing Membrane
- Ceiling Plasterboard (Gypsum Board Sheets)
- Float and Set Plaster
- Skim Coat Plaster
- Floor & Wall Tile
- Paint
- Ceiling Paint
- Skip & Dumpster Size
Garden room or backyard office
Asks 15 (14 dimensions) · gives 31 trades30 trades
Build a detached, insulated timber-framed garden room (a backyard office or studio): the base on ground screws, concrete piers or a slab, a framed and sheathed shell under a flat EPDM roof, clad walls, the door and windows, a lined and decorated room and the power supply from the house, with the base and the frame listed and never sized.
Trench Excavation & Backfill Volume · Circular Pier / Cylinder Concrete · Gravel Base Layer Tonnage +22
Trench Excavation & Backfill Volume · Gravel Base Layer Tonnage · Foam Board Insulation +20
Labour hoursCheck a quoteRoom planner
What it runs (31)
- Trench Excavation & Backfill Volume
- Circular Pier / Cylinder Concrete
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Framing Stud
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Gutter
- House Wrap
- Window Opening Flashing Membrane
- Window Opening Flashing Membrane
- Rain-Screen Cladding Furring Strip
- Siding
- Exterior Flashing Layout Trim Sheet
- Fiber-Cement Siding Caulk Joint Volume
- Exterior Paint
- Trench Excavation & Backfill Volume
- Mineral Wool Insulation Batt
- Vapor Barrier
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Drywall Joint Compound
- Drywall Joint Tape
- Paint
- Ceiling Paint
- LVP, Laminate & Engineered Floor
- Baseboard & Trim
- Skip & Dumpster Size
- Skip & Dumpster Size
What it runs (30)
- Trench Excavation & Backfill Volume
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Framing Stud
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Gutter
- House Wrap
- Window Opening Flashing Membrane
- Window Opening Flashing Membrane
- Rain-Screen Cladding Furring Strip
- Rain-Screen Cladding Furring Strip
- Board and Batten Siding
- Exterior Flashing Layout Trim Sheet
- Fiber-Cement Siding Caulk Joint Volume
- Exterior Paint
- Trench Excavation & Backfill Volume
- Mineral Wool Insulation Batt
- Vapor Barrier
- Ceiling Plasterboard (Gypsum Board Sheets)
- Ceiling Plasterboard (Gypsum Board Sheets)
- Skim Coat Plaster
- Paint
- Ceiling Paint
- LVP, Laminate & Engineered Floor
- Baseboard & Trim
- Skip & Dumpster Size
- Skip & Dumpster Size
Detached garage (new build)
Asks 14 (10 dimensions) · gives 18 trades
Build a detached timber-framed garage on a concrete slab: the dig, the slab, studwork sheathed, wrapped and sided, a gable roof on trusses with its deck, underlayment, shingles and ridge cap, fascia, soffit and gutters, from its footprint, wall height, roof pitch and openings, with the slab, trusses and door header listed and never sized.
Trench Excavation & Backfill Volume · Concrete · Framing Stud +12
Labour hoursCheck a quoteRoof planner
What it runs (18)
- Trench Excavation & Backfill Volume
- Concrete
- Framing Stud
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- House Wrap
- Window Opening Flashing Membrane
- Window Opening Flashing Membrane
- Siding
- Roof Truss Spacing & Count
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Roofing Underlayment
- Roofing Shingle
- Roof Ridge Cap
- Fascia Board
- Soffit Panel
- Gutter
- Skip & Dumpster Size
- Skip & Dumpster Size
Services 13 takeoffs
Electrical, ventilation and heating quantities, taken off the room they serve.
Electrical rough-in
Asks 5 (3 dimensions) · gives 3 trades
A starting outlet count by the North American spacing rule, the lighting load and the conduit run for first-fixing a single room.
Outlet Spacing · Lighting Circuit Connected Load · EMT Conduit Bend Length
Service panel upgrade
Asks 2 (1 dimension) · gives 3 trades
Calculated service load by the NEC methods, a simplified floor to read it against, and the main breaker for the service being considered.
Electrical Panel Load (NEC Service Sizing) · Home Electrical Service Panel Amperage Sizing · Breaker Size
Recessed lighting layout
Asks 6 (4 dimensions) · gives 3 trades
Whether the fittings you plan give the room enough light, how many a target level needs and at what spacing, and whether the circuit will carry them.
Lighting Illuminance (Lux) · Lumen Method Lighting (Room Index, Luminaire Count and Spacing) · Lighting Circuit Connected Load
Bathroom ventilation
Asks 7 (6 dimensions) · gives 4 trades
Extract airflow for the room, and the hangers, wrap and mastic for the duct that carries it.
Bathroom Extract Fan Rate and Duct Resistance · HVAC Duct Hanger Support Spacing · Duct Insulation Wrap Area +1
Radiant floor loop
Asks 4 (3 dimensions) · gives 3 trades
Pipe for the heated area, the insulation under it and the lagging on every circuit's flow and return to the manifold, for a hydronic underfloor zone.
Radiant Floor PEX Tubing · Foam Board Insulation · Pipe Insulation
Labour hoursCheck a quote
What it runs (3)
Mini-split installation
Asks 4 dimensions · gives 3 trades
Capacity for the room, the plan area the outdoor unit and a margin round it take up, and the fall its condensate needs.
Air Conditioner Size · HVAC Equipment Pad/Curb Footprint · HVAC Condensate Drain Pipe Slope
Full house rewire
Asks 6 (5 dimensions) · gives 6 trades
Rewire a house from the old wiring out: dust sheets over the floors, the outlet (socket) count by the North American spacing rule, fire-stopping where a cable crosses a fire-separating wall, the skim and mist coat where chased walls are replastered, and the skip, with the chases, the lifted boards, the consumer unit (panel), the bonding, the alarms and the test listed and never certified.
Masking and Protection Materials · Outlet Spacing · Penetration Firestop Caulk Volume +3
Labour hoursCheck a quoteRoom planner
Central heating replacement
Asks 10 (8 dimensions) · gives 5 trades
Replace a wet central heating system: dust sheets, scaffold where the flue needs it, lagging on pipes in cold spaces, the room the old boiler comes off repainted, and the skip, with the drain-down, the power flush before the new boiler, the boiler, flue, gas pipe, radiators, controls, inhibitor and commissioning listed and never certified.
Masking and Protection Materials · Scaffold Face Area and Hire Quantity · Pipe Insulation +2
Labour hoursCheck a quote
Air-source heat pump replacing a boiler
Asks 4 dimensions · gives 3 trades
Replace a boiler with an air-source heat pump (a heat pump, in North America) on the wet system it heated: dust sheets where radiators and pipes change, lagging on the flow and return outside and in cold spaces, and the waste, with the heat-loss design, the base, the unit, the hot-water cylinder (water heater tank), the larger radiators, the flush, the circuit and its isolator (disconnect), the controls and the commissioning listed and never certified.
Masking and Protection Materials · Pipe Insulation · Skip & Dumpster Size
Labour hoursCheck a quote
Wet underfloor heating in an existing floor
Asks 6 (4 dimensions) · gives 8 trades
Lay wet underfloor heating (radiant floor heating) into a floor that is already there: dust sheets on the route and tape at the doorways, the insulation or grooved panels, the pipe loops and their leaders at the designer's centres, a levelling compound, a screed or relaid boards over them, the finish, transition strips at the doorways and the skip, with the manifold, the edge strip, the pressure test before anything covers the pipe, the warm-up and the door trimming listed, and the height it adds flagged.
Masking and Protection Materials · Foam Board Insulation · Radiant Floor PEX Tubing +5
Labour hoursCheck a quoteRoom planner
Whole-house ventilation (MVHR or HRV)
Asks 9 (8 dimensions) · gives 6 trades
Fit whole-house ventilation from one central unit, heat recovery (MVHR; an HRV or ERV in North America) or extract only: dust sheets under the ceilings cut for valves, supports along the ducts, vapour-tight insulation on the ducts to the outside and on any duct through cold space, mastic where the joints take it, and the waste, with the airflow design, the unit, the ducting itself, the valves and terminals, the condensate, the electrics, the door undercuts and the commissioning listed and never certified.
Masking and Protection Materials · HVAC Duct Hanger Support Spacing · Duct Insulation Wrap Area +2
Labour hoursCheck a quote
Solar panels (PV) with battery storage
Asks 5 (4 dimensions) · gives 2 trades
Fit a solar PV array on a pitched roof with a battery: the scaffold face the array is fixed from and a skip or collection for the packaging, with the network operator's (utility's) notice, the roof hooks, the rails and panels, the DC cabling, its isolation and labels, the inverter and its circuit and isolator (disconnect), the battery and any alarm the rules ask for where it stands, and the tests listed and never certified, and the roof's capacity and the array's layout flagged.
Scaffold Face Area and Hire Quantity · Skip & Dumpster Size
Labour hoursCheck a quote
What it runs (2)
EV charger installation
Asks 5 (4 dimensions) · gives 3 trades
Fit a charge point for an electric car (a wallbox; an EVSE or Level 2 charger in North America): dust sheets along the route indoors, the dedicated circuit's run with its bends, in armoured cable or conduit, and a trench where the charger stands away from the house, with the supply check and the network operator's notice, the earthing, the charger, its isolator, the protection, the drive or lawn put back and the tests listed and never certified.
Masking and Protection Materials · EMT Conduit Bend Length · Trench Excavation & Backfill Volume
Labour hoursCheck a quote
Outdoor 4 takeoffs
Planting, irrigation and the surfaces around a building.
Landscape bed
Asks 4 dimensions · gives 4 trades
Topsoil, fabric, mulch and edging for a planted bed, from its length and width.
Topsoil · Landscape Fabric · Mulch +1
What it runs (4)
Irrigation zone
Asks 7 dimensions · gives 4 trades
Head count by spacing, head count by available flow, and the trench to get water there.
Sprinkler Head Spacing and Count · Irrigation Zone · Trench Excavation & Backfill Volume
Labour hoursCheck a quote
Pool surround
Asks 6 dimensions · gives 4 trades
Pool volume, cover or liner area, and the paving and edging for the deck around it.
Pool Volume (Rectangular, Round, Oval or Kidney) · Pool Cover & Liner Area · Paver +1
Labour hoursCheck a quoteDriveway planner
Garage floor coating
Asks 4 (3 dimensions) · gives 3 trades
Epoxy kits and coating volume for a concrete garage floor, with self-levelling compound for a floor that has to be made flat.
Epoxy Floor Coating · Epoxy Flooring Coating Coverage · Self-Leveling Underlayment (SLU) Volume
Labour hoursCheck a quote
How a takeoff works
1
The job’s figures, once
Room fit-out asks for 5: room length, room width, wall height, doors, windows. The boxes follow metric or imperial, whichever you work in.
2
Every trade at once
Drywall, Ceiling Plasterboard (Gypsum Board Sheets), Drywall Joint Compound, Paint, Ceiling Paint, Flooring, Baseboard & Trim: each worked by the calculator that owns it, with its formula, its sources and its waste allowance, and the labour hours its rows carry.
3
Into a project, or a quote check
Send every line to My Project to price at your own rates and export, or hold a builder’s quote against the same lines in the job’s quote check.
What a takeoff never does: publish a price, size a beam or a footing, or certify anything. It counts materials and work; the design and the sign-off stay with the people licensed to give them. Every job here is one somebody actually does: several that were asked for are missing because their quantities would have been invented rather than worked out. For anything else, start from the calculators by trade or the trade guides.
Frequently asked questions
- What is the difference between a takeoff and a calculator?
- A calculator answers one trade: how much drywall, how much paint. A takeoff is a whole job built from those calculators: it asks for the job's dimensions once, hands each one to every calculator that needs it, and returns all the quantities together, so a room fit-out gives the board, the compound, the paint, the flooring and the trim from one set of figures.
- Do the takeoffs work in metric?
- Yes, in metric and imperial alike. Every figure is shown in the system you work in, and some jobs open on a different build-up in each: a metric roof opens on tiles where an imperial one opens on shingles. The finder's "Metric and imperial" filter lists the jobs that do.
- Where do the labour hours come from?
- From published production rates, applied row by row to the quantities the takeoff works out, as a low, likely and high band in person-hours. They are a planning aid, not a programme: curing, deliveries and inspections are not in them. No rate is ever turned into a price; you add your own hourly rates in My Project if you want a cost.
- Can I keep a filtered list, or the takeoffs I use most?
- Yes. The search and filters are kept in the page's address after the # sign, so a filtered list can be bookmarked or sent. Pinning a takeoff (the star on its card) keeps it first on this page and in the site search, and the jobs you opened lately are listed above the cards. Both live in this browser only; nothing is sent anywhere.