Quote check
Check a quote
- 74Jobs covered
- 455447Lines checkable
- None, deliberatelyPrices published

Find your job
Search by job, or by a line on your quote
“Backer board”, “rebar”, “mulch” — every check that carries the line is listed below it.
All 74 checks, by trade.
19 jobs
Interiors
Boarding, finishes, floors and trim inside a finished shell.
Boards, dot-and-dab adhesive, screws, tape, filler, bead and skim — most of a real quote's material content.
- Plasterboard / drywall sheets
- Ceiling boards
- Dot-and-dab adhesive (direct bond)
- Drywall screws
- and 4 more
Room fit-out
7 lines- Drywall
- Ceiling Plasterboard (Gypsum Board) Sheet
- Drywall Joint Compound
- Paint
- and 3 more
Stud partition
3 lines- Framing Stud
- Drywall Joint Compound
- Outlet Spacing
Floor tiling
4 lines- Tile Backer Board
- Thinset & Tile Adhesive
- Floor & Wall Tile
- Thinset & Tile Adhesive
Room plastering
3 lines- Plaster Angle and Stop Bead
- Skim Coat Plaster
- Drywall Joint Tape
Drywall ceiling
6 lines- Ceiling Plasterboard (Gypsum Board) Sheet
- Drywall Ceiling Screw Count (Fastening Schedule)
- Drywall Joint Compound
- Drywall Joint Tape
- and 2 more
Room repaint
4 lines- Paint Primer
- Ceiling Paint
- Paint
- Woodwork Paint
Wall tiling
3 lines- Tile Backer Board
- Tile & Grout
- Thinset & Tile Adhesive
- LVP, Laminate & Engineered Floor
- Laminate/Vinyl Plank Floor Underlayment Roll
- Self-Leveling Underlayment (SLU) Volume
Carpet and underlay
3 lines- Carpet Roll Length & Waste
- Carpet Cushion Roll
- Carpet Seam Tape and Sealer
Baseboard and casing
2 lines- Baseboard & Trim
- Door & Window Casing
Suspended ceiling
3 lines- Drop Ceiling Tile
- Suspended Ceiling Wire Hanger Count
- Suspended Ceiling Wall Angle Take-Off
Garage conversion
25 lines- Concrete CMU Block Counter & Grout Infill
- Concrete CMU Block Counter & Grout Infill
- Brick
- Brick
- and 21 more
Basement conversion
13 lines12 lines- Skip & Dumpster Size
- Perimeter Weeping Tile Pipe Segment
- Foam Board Insulation
- Framing Stud
- and 9 more
- Skip & Dumpster Size
- Perimeter Weeping Tile Pipe Segment
- Foam Board Insulation
- Framing Stud
- and 8 more
Staircase replacement
6 lines4 lines- Skim Coat Plaster
- Handrail Length
- Deck Baluster
- Deck Baluster
- and 2 more
- Skim Coat Plaster
- Handrail Length
- Woodwork Paint
- Skip & Dumpster Size
Fitted wardrobe
3 lines- Closet Shelving
- Baseboard & Trim
- Woodwork Paint
Party wall soundproofing
8 lines- Framing Stud
- Mineral Wool Insulation Batt
- Mass-Loaded Vinyl (MLV) Soundproofing Barrier
- Ceiling Plasterboard (Gypsum Board) Sheet
- and 4 more
- Skim Coat Plaster
- Baseboard & Trim
- Paint
- Skip & Dumpster Size
- Floor Sanding and Finish
- Baseboard & Trim
- Floor Transition Strip
- Skip & Dumpster Size
7 jobs
Kitchens and bathrooms
The rooms where waterproofing decides whether the rest of it lasts.
Bathroom
6 linesTiles, adhesive, grout, boards, tanking and ceiling paint, against the room you are standing in.
- Wall and floor tiling
- Tile adhesive
- Grout
- Tanking or waterproof membrane
- and 2 more
Kitchen refit
15 lines- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- Kitchen Unit and Cabinet Run
- and 11 more
Bathroom remodel
4 lines- Tile Backer Board
- Floor & Wall Tile
- Bathroom Extract Fan Rate and Duct Resistance
- Thinset & Tile Adhesive
Shower enclosure
4 lines- Wet Room Tanking and Waterproof Membrane
- Tile Backer Board
- Tile & Grout
- Thinset & Tile Adhesive
Kitchen splashback
3 lines- Countertop Area
- Tile & Grout
- Thinset & Tile Adhesive
Heated bathroom floor
4 lines- Radiant Floor PEX Tubing
- Floor Crack Isolation Membrane Coverage
- Floor & Wall Tile
- Thinset & Tile Adhesive
Wet-room tanking
3 lines- Wet Room Tanking and Waterproof Membrane
- Floor Crack Isolation Membrane Coverage
- Tile Backer Board
19 jobs
Envelope
Framing, sheathing, cladding, roofing and insulation — everything that keeps weather out.
External wall finish
3 lines- House Wrap
- Siding
- Exterior Paint
Floor insulation
3 lines- Foam Board Insulation
- Vapor Barrier
- Laminate/Vinyl Plank Floor Underlayment Roll
Fibre cement siding
4 lines- Fiber-Cement Siding Cutting Waste Factor
- Fiber-Cement Siding Corner Post
- Lap Siding Fastener Schedule
- Fiber-Cement Siding Caulk Joint Volume
Asphalt shingle roof
5 lines- Roofing Shingle
- Roofing Underlayment
- Roof Eave Ice Dam Protection Membrane Footprint
- Roof Ridge Cap
- and 1 more
Standing seam roof
3 lines- Standing Seam Metal Roof Clip Count
- Standing Seam Metal Roof Clip Count
- Roofing Underlayment
Fascia, soffit and gutter
5 lines- Fascia Board
- Soffit Panel
- Gutter
- Gutter Hanger Spacing
- and 1 more
Attic insulation
3 lines- Attic Insulation Upgrade
- Blown-In Insulation Bag Count
- Insulation Batt
Window replacement
2 lines- Window Opening Flashing Membrane
- Door & Window Casing
Framed exterior wall
5 lines- Framing Stud
- Insulation Batt
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- House Wrap
- and 1 more
Flat roof replacement
8 lines- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Roof Perimeter Termination Bar
- Roof Membrane Termination Bar Fastener
- and 4 more
Loft conversion
30 lines29 lines- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Roof Perimeter Termination Bar
- and 26 more
- Plywood and OSB Sheet (Subfloor, Wall and Roof)
- Foam Board Insulation
- EPDM Single-Ply Roofing Roll
- Roof Perimeter Termination Bar
- and 25 more
Pitched roof re-covering
9 lines8 lines- Roof Eave Ice Dam Protection Membrane Footprint
- Roofing Underlayment
- Attic Rafter Baffle/Chute Count
- Roof Squares
- and 5 more
- Roof Eave Ice Dam Protection Membrane Footprint
- Roofing Underlayment
- Attic Rafter Baffle/Chute Count
- Roof Covering Fixing
- and 4 more
New window or door opening
7 lines- Brick
- Window Opening Flashing Membrane
- Plaster Angle and Stop Bead
- Plaster Angle and Stop Bead
- and 3 more
External wall insulation
9 lines- EIFS Foam Board Adhesive Coverage
- Continuous Insulation Fastener Count
- EIFS Reinforcing Mesh Roll Count
- EIFS Impact-Resistant Mesh Reinforcement Zone
- and 5 more
Rainscreen cladding
9 lines10 lines- House Wrap
- Rain-Screen Cladding Furring Strip
- Cavity Barrier Run and Crossing Count
- Exterior Flashing Layout Trim Sheet
- and 5 more
- House Wrap
- Rain-Screen Cladding Furring Strip
- Cavity Barrier Run and Crossing Count
- Rain-Screen Cladding Furring Strip
- and 6 more
External door replacement
5 lines- Window Opening Flashing Membrane
- Door & Window Casing
- Caulk & Sealant
- Woodwork Paint
- and 1 more
Exterior repaint
7 lines- Paint Primer
- Woodwork Paint
- Exterior Paint
- Woodwork Paint
- and 3 more
Repointing
3 lines- Tuckpointing Mortar Repair Volume
- Lime Mortar Mix (NHL and Lime Putty)
- Caulk & Sealant
Cavity wall insulation
1 line- Cavity Wall & Stud Bay Insulation Fill
13 jobs
Structure and site
Concrete, groundworks, decks and hard landscaping.
Concrete slab
3 lines- Concrete
- Rebar
- Concrete Formwork
Timber deck
4 lines- Deck Board
- Deck Footing
- Deck Screws
- Deck Stain
Retaining wall
4 lines- Retaining Wall Block
- Gravel Base Layer Tonnage
- Retaining Wall Drainage Gravel
- Geogrid Reinforcement Layer Count
Masonry wall
4 lines- Cavity Wall Weep Hole Spacing
- Brick
- Brick Veneer Anchor Spacing
- Brick Movement Joint Spacing
Strip footing
3 lines- Continuous Footing / Grade Beam Volume
- Trench Excavation & Backfill Volume
- Rebar
Concrete driveway
2 lines- Concrete Driveway
- Rebar
Paver patio
5 lines- Paver
- Paver Base & Sand
- Paver Edging
- Paver Polymeric Sand
- and 1 more
Fence
3 lines- Fence
- Fence Picket
- Post Hole Concrete
Wall removal
11 lines- Ceiling Plasterboard (Gypsum Board) Sheet
- Ceiling Plasterboard (Gypsum Board) Sheet
- Plaster Angle and Stop Bead
- Float and Set Plaster
- and 7 more
Extension shell
22 lines- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- and 18 more
Chimney breast removal
7 lines6 lines- Ceiling Plasterboard (Gypsum Board) Sheet
- Ceiling Plasterboard (Gypsum Board) Sheet
- Drywall Joint Compound
- Drywall Joint Tape
- and 3 more
- Float and Set Plaster
- Ceiling Plasterboard (Gypsum Board) Sheet
- Skim Coat Plaster
- Paint
- and 2 more
Porch
33 lines31 lines- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- and 29 more
- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
- Continuous Footing / Grade Beam Volume
- Concrete CMU Block Counter & Grout Infill
- and 27 more
Garden room
31 lines30 lines- Trench Excavation & Backfill Volume
- Circular Pier / Cylinder Concrete
- Gravel Base Layer Tonnage
- Foam Board Insulation
- and 27 more
- Trench Excavation & Backfill Volume
- Gravel Base Layer Tonnage
- Foam Board Insulation
- Framing Stud
- and 26 more
12 jobs
Services
Electrical, ventilation and heating quantities, taken off the room they serve.
Electrical rough-in
2 lines- Outlet Spacing
- EMT Conduit Bend Length
Service panel upgrade
3 lines- Electrical Panel Load (NEC Service Sizing)
- Home Electrical Service Panel Amperage Sizing
- Breaker Size
Bathroom extractor fan
4 lines- Bathroom Extract Fan Rate and Duct Resistance
- HVAC Duct Hanger Support Spacing
- Duct Insulation Wrap Area
- Duct Sealing Mastic
Radiant floor heating
3 lines- Radiant Floor PEX Tubing
- Foam Board Insulation
- Pipe Insulation
Mini-split installation
1 line- Air Conditioner Size
Full rewire
5 lines- Outlet Spacing
- Penetration Firestop Caulk Volume
- Skim Coat Plaster
- Paint Primer
- and 1 more
Central heating replacement
3 lines- Pipe Insulation
- Paint
- Skip & Dumpster Size
Air-source heat pump
2 lines- Pipe Insulation
- Skip & Dumpster Size
Underfloor heating retrofit
7 lines- Foam Board Insulation
- Radiant Floor PEX Tubing
- Self-Leveling Underlayment (SLU) Volume
- Floor & Wall Tile
- and 3 more
Whole-house ventilation
5 lines- HVAC Duct Hanger Support Spacing
- Duct Insulation Wrap Area
- Duct Insulation Wrap Area
- Duct Sealing Mastic
- and 1 more
Solar panel and battery
1 line- Skip & Dumpster Size
EV charger installation
2 lines- EMT Conduit Bend Length
- Trench Excavation & Backfill Volume
4 jobs
Outdoor
Planting, irrigation and the surfaces around a building.
Planting bed
4 lines- Topsoil
- Landscape Fabric
- Mulch
- Lawn Edging
Irrigation
3 lines- Sprinkler Head Spacing and Count
- Trench Excavation & Backfill Volume
- Trench Excavation & Backfill Volume
Pool surround
3 lines- Pool Cover & Liner Area
- Paver
- Paver Edging
Garage floor coating
3 lines- Epoxy Floor Coating
- Epoxy Flooring Coating Coverage
- Self-Leveling Underlayment (SLU) Volume
How a check works
Each page asks for the job’s measurements once and runs the calculators this site publishes for every line a quote for that job carries. Where a legitimate choice moves a figure — a cutting allowance, a lay pattern, a product’s coverage — the line shows a range with both ends named. Type the figure your quote states and it is placed inside, above or below it.
What these pages will not tell you
What the work should cost. An installed price varies by a factor of two between markets, moves with the season, and cannot see your access or your specification — so a confident figure nobody can defend leaves you worse placed than none, because it is the number you will repeat.
The part that travels
A quantity is different. If a room is four metres by three and a half, the boards it takes are the boards it takes, in Texas and in Manchester equally. So these pages check the part that travels and stay silent on the part that does not.
What a quote leaves out
Every page also lists what its check does not cover — the preparation, the access, the parts of the job no measurement describes. That list is usually worth more than the numbers: a generous allowance costs a little and is visible before anybody starts; an omission becomes a cost halfway through, when the choice has gone.
Written so you can show it to them
Nothing on these pages characterises anybody. Every line states the assumption behind its own figure and at least one ordinary reason a real quote might differ, and every prompt is a question rather than an instruction. A tradesman who is asked what board size a price assumes answers in a sentence.
If your job is not listed
The calculators these pages run are published individually, with the working shown, and the job takeoffs each check comes from show every quantity for the job. Nothing you type on any of them is uploaded.