Paver patio takeoff
Pavers, base, bedding sand, edging, jointing sand and sealer for a laid patio.
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
- 2Measurements in
- 5Trades out
Give the job once
Every figure on the right follows these, in the units you choose.
Been given a quote for this job?
Paste it into the paver patio quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.
Check the quoteEvery trade, from those dimensions
then change a dimension, and each line shows what moved.
| Trade | Quantity | |
|---|---|---|
Paver CalculatorUnits at the default paver size and waste factor.
Why this quantity?
Resting on
The waste factor: the calculator's working figure, a trade convention. | 236 pavers | |
Paver Base & Sand CalculatorBase gravel and bedding sand at the default depths.
Why this quantity?
Resting on
| 2.65 cubic yards (gravel base) | |
Paver Edging CalculatorRestraint around the perimeter, in stock lengths.
Why this quantity?
Resting on
The cutting allowance: the calculator's working figure, a trade convention. | 9 x 8 ft sections | |
Paver Polymeric Sand CalculatorJointing sand at the default coverage — check the bag for your joint width.
Why this quantity?
Resting on
Change any other figure on the Paver Polymeric Sand Calculator | 3 x 50 lb bags | |
Paver Sealer CalculatorSealer, if you are sealing; many pavers are better left unsealed.
Why this quantity?
Resting on
| 3 gallons | |
Paver CalculatorUnits at the default paver size and waste factor.
Why this quantity? | 237 pavers | |
Paver Base & Sand CalculatorBase gravel and bedding sand at the default depths.
Why this quantity? | 2.03 m³ | |
Paver Edging CalculatorRestraint around the perimeter, in stock lengths.
Why this quantity? | 9 x 2.4 m sections | |
Paver Polymeric Sand CalculatorJointing sand at the default coverage — check the bag for your joint width.
Why this quantity? | 3 x 20 kg bags | |
Paver Sealer CalculatorSealer, if you are sealing; many pavers are better left unsealed.
Why this quantity? | 11.36 L |
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
Labour and programme
Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.
- Paver28 h (16–56)
- Paver Base & Sand2.0 h (0.8–6.1)
- Paver Sealer3.6 h (2.0–8.0)
About 34 person-hours in all, between 19 and 70.
Trade by trade
- Landscaper1 landscaper + 1 labourer1½ days
- Labourer2 labourersunder a quarter of a day
- Painter1 painterhalf a day
About 2½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.
2 rows carry no hours of their own
- Paver Edging: counted with Paver
- Paver Polymeric Sand: counted with Paver
Labour and programme
Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.
- Paver28 h (16–56)
- Paver Base & Sand2.0 h (0.8–6.1)
- Paver Sealer3.6 h (2.0–8.0)
About 34 person-hours in all, between 19 and 70.
Trade by trade
- Landscaper1 landscaper + 1 labourer2 days
- Labourer2 labourersunder a quarter of a day
- Painter1 painterhalf a day
About 2½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.
2 rows carry no hours of their own
- Paver Edging: counted with Paver
- Paver Polymeric Sand: counted with Paver
Setups you have saved
The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.
How far does a budget go?
At your own prices, with this build-up unchanged.
About this job
A paver patio is a structure that happens to look like a surface, and four parts of it decide whether it lasts. The base is the structure. The bedding sand is a levelling course and not a base — 25 mm (1 in) of it, screeded, and never more to make up for a base that is out. The pavers are the wearing surface. The edging is what stops the whole thing spreading sideways, which is the failure mode: without restraint, the perimeter units creep outward, the joints open, and the patio grows a ragged edge within two seasons.
Jointing sand is where the modern product changed the job. Polymeric sand binds when it is wetted, locking the joints against weed growth and ant excavation, and it is unforgiving about being installed on a damp surface or watered wrongly. It is a bagged product with a coverage rate, which is why it has its own row rather than being folded into the pavers.
The base depth in the rows below is a default, not a specification. A pedestrian patio and a surface a vehicle crosses want materially different builds, and the hardscape calculator asks that question directly.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Excavate to the full base depth plus the bedding and the paver, and check the fall away from the building.
- Compact the sub-grade before any base goes in.
- Lay the base in layers no deeper than the compactor can actually reach, compacting each one.
- Set the edge restraint before the field, not after.
- Screed the bedding sand to a constant depth; never fill a dip in the base with more sand.
- Lay the pavers, cut the perimeter, then compact them into the bedding before sanding the joints.
- Sweep in the jointing sand, compact, top up, then wet it exactly as the bag says.
What this takeoff does not cover
- Drainage and the sub-grade's own condition, which decide whether the base stays where you put it.
- Steps, level changes, kerbs and any retaining edge taller than a restraint strip.
- The cutting waste on a complex perimeter, which a rectangle's waste factor understates badly.
- Geotextile between sub-grade and base, which soft ground needs and firm ground does not.
Quote check
Been given a quote for this job?
Paste it into the paver patio quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Concrete slab
3 tradesConcrete, reinforcement and formwork for a ground slab from one set of dimensions.
Run this takeoffTimber deck
4 tradesBoards, footings, fixings and finish for a rectangular deck.
Run this takeoffSegmental retaining wall
4 tradesBlocks, levelling pad, drainage stone and reinforcement layers for a block retaining wall.
Run this takeoff
Frequently asked questions
- What does the paver patio takeoff give for a typical job?
- Opened at Patio length 5 m · Patio width 4 m, it orders: Paver, 237 pavers; Paver Base & Sand, 2.03 m³; Paver Edging, 9 x 2.4 m sections; Paver Polymeric Sand, 3 x 20 kg bags; Paver Sealer, 11.4 L. Opened at Patio length 16.5 ft · Patio width 13 ft: Paver, 236 pavers; Paver Base & Sand, 2.65 cubic yards (gravel base); Paver Edging, 9 x 8 ft sections; Paver Polymeric Sand, 3 x 50 lb bags; Paver Sealer, 3 gallons. Every figure follows the dimensions you give it.
- Which calculators does the paver patio takeoff run?
- 5 calculators, one to a line: Paver Calculator, Paver Base & Sand Calculator, Paver Edging Calculator, Paver Polymeric Sand Calculator, Paver Sealer Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the paver patio takeoff leave out?
- 4 things, each named on this page: Drainage and the sub-grade's own condition, which decide whether the base stays where you put it; Steps, level changes, kerbs and any retaining edge taller than a restraint strip; The cutting waste on a complex perimeter, which a rectangle's waste factor understates badly; Geotextile between sub-grade and base, which soft ground needs and firm ground does not.
- Can I check a quote for this job against the takeoff?
- Yes. The paver patio quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.