A saucer where the offside wheel sits
Sixty square metres of 200 by 100 blocks, herringbone, laid somewhere around 2008, and exactly one part of the drive has moved. A rough oval about 1.4 m across, under the spot where the offside front wheel comes to rest, sitting the better part of 30 mm below a straightedge laid across it. Rain stands in it for a day. Three or four blocks in the middle rock under a boot heel. The rest of the drive is tight, flat, and looks its age and no worse than its age.
The owner has already collected three answers. A jet-washing outfit said the joints want refilling. A landscaper priced lifting the whole lot and starting again. A neighbour remembered that the soil pipe from the extension runs somewhere under there. All three could be true, they differ by two orders of magnitude in price, and choosing between them is the entire job. Everything after that is barrows and a whacker.
A settled bay is one symptom sitting on top of four candidate faults, each at its own depth: jointing sand that has gone, a perimeter that has stopped holding, a sub-base that was never thick enough or never properly compacted, and water moving underground carrying fines away with it. Those four can be separated in a morning with a straightedge, a screwdriver, a bucket and a dozen blocks lifted out. Not spending that morning is how a drive ends up relaid twice, the second time by somebody else.
Measure the dish before forming an opinion about it
Work from a datum that cannot have moved. The door threshold, the kerb line at the footway, the rim of a chamber cover set in concrete, the edge course butting the house wall. Pull a line between two of them, run a straightedge across the low ground on a grid of roughly half a metre, and write down the offset at every intersection. Then mark on the paving, in crayon, the line where the offsets come back to the plane the rest of the drive sits on. That chalk line is the honest extent of the movement, and it is almost always wider than the eye reports.
Separate design fall from settlement while you are down there. A drive built to shed water reads low at the far edge because that is what it was built to do, and a straightedge laid along the fall will confirm a defect that does not exist. Take one run parallel to the fall and one across it, and judge the dip only against the plane the surrounding paving actually occupies. Minimum crossfall for modular paving is set out in BS 7533 and in Interpave's guidance; a drive that ponds all over rather than in one hollow has lost its fall or never had it.
The shape carries most of the diagnosis. A broad, soft-edged saucer a metre or two across is a layer consolidating over an area, which points at the laying course or the sub-base. A sharp-edged trough with a defined rim and something close to a vertical drop at its edge is a void that collapsed, and voids have causes. Two parallel troughs following the wheel path mean the pavement as built is under-designed for what parks on it, and the dip you were called about is only the first place it showed. A straight-sided step running across the drive is a trench line or a chamber, not a pavement failure at all. And where blocks have rotated out of the pattern, or joints open progressively toward one side, the movement has a horizontal component and belongs to the perimeter rather than to depth.
Photograph it with the straightedge in shot, keep the sketch with its offsets, and note the date and the weather of the preceding week. If the answer turns out to be a drain, that record is what a sewerage undertaker or an insurer will ask for. If the answer turns out to be nothing much, the same sketch repeated in six months is the only way anyone will know whether it is still moving.
Where a sunken bay has gone wrong, layer by layer
- Block paving units — these only report the failure; they dish, rock and open at the joints while the fault sits somewhere below them Paver Calculator
- Laying course — grit sand at one screeded thickness; where the trial hole finds it two or three times deeper under the dip, it has either been used to correct level or has flowed into a space beneath Sand Cubic Yards to Tons Calculator
- Unbound sub-base — the layer that actually carries the car, thinned here by fines washing out; thickness is a design output from subgrade strength and traffic, never a rule of thumb Gravel Base Layer Tonnage Calculator
- Formation and subgrade — prove it with a bar rather than an opinion; where it takes the bar under hand pressure, no thickness of anything above it will hold a level Standard/Modified Proctor Compaction Percentage Calculator
- Service trench and lateral — a cracked or open-jointed pipe exfiltrates and takes sub-base fines with it, and loose trench backfill consolidates on its own schedule Trench Excavation & Backfill Volume Calculator
The crayon line is the first number the job produces: it becomes the area that has to come up, and the same footprint sets the sub-base and laying course the reinstatement will swallow.
SettingsSettings for this calculation
The standard allowance most suppliers and estimating guides assume for ordinary work.
Length of the paved area.
Width of the paved area.
What will use the surface.
Screeded sand layer under the units.
Allowance for cuts and breakage.
Paving area
279 ft²
Sub-base includes a 25% compaction allowance. Depths follow common guidance and should give way to a specific specification where one exists.
- Net paved area
- 253.5 ft²
- Sub-base depth
- 3.94 in
- Sub-base to order (loose)
- 3.85 yd³
- Sub-base weight
- 10,384.18 lb
- Bedding sand
- 0.98 yd³
- Area in ft²
- 278.85 ft²
They open the calculator with your figures already in it
Hardscape Area & Base Calculator: 279 ft² — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- Assumes a competent subgrade. Soft or clay ground needs excavation to a firm formation and usually a geotextile separator, neither of which is calculated here.
- No allowance for edge restraint, which paving needs on every free edge or it spreads.
Joints first, because it is the cheapest thing that might be true
Run a screwdriver down a dozen joints, inside the dip and well outside it, and note how far the sand stands below the block surface. Full joints are the mechanism by which one block hands load to the next; an empty joint leaves each unit to deflect alone, which is why block paving that has lost its jointing chips at the arrises and rocks long before it dips. Kiln-dried sand is expected to need topping up in the first year and after any heavy cleaning, so half-depth joints across a whole drive are usually a maintenance story rather than a fault — most often a decade of close-range pressure washing.
The diagnosis is in the distribution, not the depth. Joints low everywhere and a dip in one place is two separate problems: refill the joints and keep looking, because loose jointing does not produce a 30 mm hollow on its own. Joints empty only inside the dip while the surrounding field is full is the interesting case. Sand does not evaporate, and a joint that has emptied locally has a route down through the laying course into somewhere that will take it. That is the first real evidence of a void, and it moves the drain check up the list.
Refill to match what is already down. Kiln-dried sand stays reworkable, which suits a surface you may open again. Polymeric and resin jointing compounds resist washout and weeds but are unforgiving of process: dry blocks, the correct fill depth below the chamfer, every grain swept off the faces before wetting, and a watering method that activates the binder without flushing the joint out. The temperature and rainfall limits in the manufacturer's instructions are conditions, not advice. Mixing types across one drive shows for the life of the surface, so a bay repointed in a different material reads as a patch from the pavement whether or not the level is right.
Bag count follows joint width, block depth and the area actually being re-jointed, and a joint left half-filled through a winter is the one that starts taking sub-base fines with it.
The total paved surface area to fill with jointing sand.
Check your specific product's coverage rating — this varies with joint width and paver size.
Polymeric sand bags needed
4 x 50 lb bags
Always check your specific product's coverage chart, since it varies significantly by joint width and paver size — this default assumes a common mid-range residential setup.
- Area to fill
- 320 sq ft
They open the calculator with your figures already in it
Paver Polymeric Sand Calculator: 4 x 50 lb bags — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- The bag count is nothing more than your area divided by the coverage rate you enter. Joint width, joint depth and paver size are not inputs — a field of small block pavers with wide joints and a field of large-format slabs with tight joints have wildly different sand demand at the same area, and the coverage figure is the only place that difference can enter.
- No waste allowance is added. The result is the exact number of bags to cover the entered area at the entered rate, rounded up to a whole bag; it does not allow for sand lost while sweeping and blowing off the faces, spillage, or the second fill the joints usually need after they consolidate.
- This is jointing sand only. It does not cover the bedding course under the pavers or the compacted sub-base beneath that, and polymeric sand is not a substitute for either.
- The count assumes the standard bag for your selected unit system — 50 lb in imperial, 20 kg in metric. If your supplier stocks another bag size, or a wide-joint product rated differently, work the total out from the weight rather than reading the bag count straight off.
- Nothing here checks that polymeric sand is right for the joint. Manufacturers set a minimum and maximum joint width, a minimum fill depth below the paver surface, and temperature, dryness and curing conditions for the binder; none of those are inputs, so the calculator will happily return a bag count for a joint the product should not be used in. Permeable paving takes a specified open-graded jointing aggregate instead, not this.
Twelve blocks up
Take the trial opening from the deepest point, not from the comfortable edge, and take enough of it: a dozen blocks gives roughly a quarter of a square metre, which is about the minimum that lets a hand auger and a forearm work. Two block extractors, or a pair of thin bolsters and patience. Number anything cut before it comes out. If the joints are polymeric, expect the first two to break rather than lift, and choose which two.
Measure the laying course at three points across the opening, taking each off a straightedge bridged onto sound paving. BS 7533 sets a nominal consolidated thickness and a tight tolerance on it, and the current part is worth reading rather than working to a remembered figure — but the useful information here is the comparison, not the absolute. Uniform and close to nominal, and the laying course is not the story. Two or three times nominal under the hollow and correct at the edge of the opening, and either sand was used to make up a low sub-base when the drive was built, or it has since flowed into a space below. Those two need separating, and the sub-base measurement separates them.
Read the sand itself. Sharp, angular, dry and still gritty between the fingers has not been disturbed. Grey, rounded, packed hard and washed clean of its fines means water has been moving through the layer for a long time. A slurry, or sand you can squeeze water out of days after rain, means the layer is holding water, which usually means the material below has stopped draining. Soft building sand where a grit sand to the BS 7533 grading should be is a construction fault in its own right and behaves like a sponge under a wheel load.
Then go through to formation with a trowel and a bar. Record what the sub-base actually is as well as how deep it is: an angular crushed material that has locked, a rounded shingle that never will, or two barrow loads of whatever was on site that week. Push a bar in by hand at formation level. If it goes down 300 mm under nothing but body weight, the subgrade is the fault and no amount of blocks or bedding will hold a level over it. Leave the hole open with a bucket over it for an hour; standing water when you come back is an answer on its own.
What governs the numbers you are measuring is worth being clear about before anybody argues over them. Structural design for modular paving is a function of subgrade strength and the traffic the surface carries, set out in BS 7533-101 for pavements built with clay, natural stone or concrete paving units. The unbound material itself is normally an aggregate to BS EN 13242, specified as a Type 1 unbound mixture to Series 800 of the Specification for Highway Works. The blocks are manufactured to BS EN 1338, which sets dimensional tolerances and durability classes but says nothing about how thick your drive should be. Block paving is sold domestically in three nominal thicknesses — 50, 60 and 80 mm — and Interpave's guidance ties them broadly to pedestrian, domestic vehicular and adopted-highway duty; a car parked daily on the thinnest of the three is a common enough finding in an opening on a fifteen-year-old drive.
| Found in the opening | Most likely mechanism | How far the repair goes |
|---|---|---|
| Laying course near nominal and uniform, sub-base sound and angular, bar will not enter formation | Surface-level only: lost jointing, block rock, and a little consolidation of the bedding under wheel loads | Lift the bay, re-screed the laying course to constant thickness, relay and re-joint |
| Laying course two or three times nominal under the hollow, correct at the edge of the opening | Sand used to make up level at construction, or sand that has since migrated into a space beneath | Down to the sub-base at least, and prove its level across the whole bay before deciding |
| Sub-base thin, rounded or ungraded, but formation firm and dry | The pavement was built for foot traffic and is being parked on | Out to formation across the bay, plus an honest conversation about the rest of the drive |
| Bar sinks under hand pressure, or water standing in the hole an hour later | Weak or saturated subgrade, or a drainage path that has stopped working | Formation treatment or a drainage fix; more sub-base alone will keep moving |
| Open space beneath the sub-base, fines gone, jointing sand disappearing from the surface above | Material is being carried away — an exfiltrating drain, a surcharging soakaway, or an old trench | Nothing above ground until the water route is found, repaired and tested |
Whether the edge has let go
Crouch at one corner and sight along each perimeter in turn. On a domestic drive the restraint is usually a soldier course or a kerb bedded and haunched in concrete, and it fails quietly: the haunching cracks below ground where nobody looks, the kerb rotates a degree or two outward, the last course tilts with it, and the field behind gains a few millimetres of room every season. Blocks that were cut tight to fit start to sit loose in their gaps.
The confirmation is horizontal rather than vertical. Joints widening progressively as you work toward one boundary, blocks turned slightly out of the herringbone, a whole field that has walked toward a lawn — all of that is lateral movement. Measure across the paving between two things that genuinely cannot have moved, the house wall and the far kerb, and compare the answer to the block module. A field of 200 mm units that has gained 40 mm across its width has lost the confinement that lets one block share a wheel load with its neighbours, and it will keep settling in the middle without any void being involved at all.
Where a drive meets a lawn with nothing but topsoil behind the edge, or meets the footway at a crossover where the kerb line takes every wheel, the restraint is being asked to do structural work with nothing behind it. A dip within a metre of a perimeter that has moved usually belongs to that perimeter. Relaying the middle and leaving the edge reproduces the same hollow within a couple of years, because the sub-base has to run past the last block and the restraint has to bear on it — not on whatever was shovelled back against the outside of the dig.
Restraint is measured along the run being rebuilt rather than around the whole drive, and every return, radius and stop end is a piece that has to be on the van before the bay is opened.
SettingsSettings for this calculation
The standard allowance most suppliers and estimating guides assume for ordinary work.
The length of the paved area.
The width of the paved area.
The length plastic or metal paver edging is sold in.
Extra edging for cut ends at corners and the offcut left at the end of each run.
Edging sections needed
9 x 8 ft sections
- Perimeter (with waste)
- 71.5 linear ft
They open the calculator with your figures already in it
Paver Edging Calculator: 9 x 8 ft sections — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- The perimeter is 2 x (length + width), so the count assumes a rectangle restrained on all four sides. It does not subtract a side that butts a house wall, an existing kerb or a step, and it does not add the extra run of an L-shape, a bay, a radius or a stop end.
- The cutting allowance is one percentage of the perimeter and does not rise by itself with how much cutting the job involves. Curves, returns and stop ends leave more unusable offcuts than a straight rectangular run, so set it higher for those; a section damaged on site is not in it at any setting.
- Only the edging sections are counted. Spikes, connectors and corner pieces are not, and the menu carries two stock lengths only, so coiled flexible edging sold by the roll, or sections of any other length, will not match this count.
- This is a quantity take-off, not a check that the restraint suits the loading. The count is the same for plastic, metal or any other spiked edging, and it does not judge whether spiked edging is enough for a driveway, a crossover, or any edge where wheels track close to the perimeter, where a concrete-haunched kerb or soldier course is the usual restraint.
- The count assumes there is compacted base past the last course for the spikes to bear on. That extra base sits outside the paved footprint you enter here and is not part of this calculation.
When the fault is water rather than ground
The signature of a drainage cause is loss over time, not depth at a moment. A hollow that is measurably deepening between visits, that keeps swallowing jointing sand, that worsens in the weeks after prolonged rain, and that happens to lie on the straight line between two inspection chambers is describing a pipe. Fines from the sub-base are being carried into a cracked or open-jointed lateral and taken away down the run, leaving a space that the pavement eventually falls into. Nothing floods. There is usually no smell. The only surface sign is that material keeps disappearing.
Open the cheap things first. Lift the nearest chamber covers and look before ordering anything: silt banked in the benching, a step or an open joint at a connection, a visible backfall, roots at a joint. Run a hose into the suspect gully with somebody watching the downstream chamber, and add dye if the run is ambiguous. That alone separates a pipe that is carrying water from one that is carrying it into the ground, and it costs an hour.
When it needs to be evidence rather than an impression, the named methods exist. A CCTV survey coded to BS EN 13508-2 produces a defect record another party can act on, which matters enormously if the pipe turns out not to belong to the homeowner. Tightness testing of a length that can be plugged is covered by BS EN 1610. Neither is expensive against the cost of relaying a drive twice.
Ownership is worth establishing before the excavator is booked. In England and Wales, most private drains and sewers serving more than one property, together with lengths of lateral drain lying outside the property boundary, transferred to the sewerage undertaker under the private sewer transfer that took effect in 2011. A defect on the wrong side of that line may not be the homeowner's to pay for, and finding out afterwards is finding out too late. Work out where the boundary runs and where the connection sits while the paving is still down.
Water that is not in a pipe does the same damage more slowly. A downpipe discharging onto the paving instead of into a gully will scour a laying course for years. A soakaway that was undersized, or that has silted up, surcharges and pushes water back under the pavement — BRE Digest 365 is the reference for how one should have been sized and tested in the first place, and a drive built to throw all its water at a single point tends to fail at that point. There is also a non-water version of the same story worth ruling out: a mature tree taken down before the drive went in, whose root plate has been quietly rotting away underneath ever since.
Deciding how far out to go
Three scopes come out of the morning's work, and they are genuinely different jobs rather than three sizes of the same one: re-joint and leave it; lift and relay a bay onto a repaired sub-base; take the drive back to formation and rebuild it. The trial opening and the drainage check decide which. The sentence to say out loud is that a bay repair over a pavement never built for a car buys time rather than fixing anything, and the owner should hear it before they choose.
Set the opening line wider than the dish. The sub-base fails over a bigger area than the surface admits, so run the line beyond the last block that shows any movement at all rather than to the crayon contour. Then square it up to the pattern: take the opening back to a straight stretcher line so full blocks can be laid back in, instead of following a curve that forces a ring of small cuts round the repair. Where that line would land within about a metre of the edge restraint, go to the restraint instead — a narrow strip of old paving between a new bay and a moving kerb is a hinge.
Reuse is the reason to own block paving in the first place, but count the losses honestly. Old blocks come up with contaminated undersides, some come up in two pieces, and more break where a polymeric joint has bonded them into a slab. Fifteen years of weathering is not matched by anything on a pallet today, so take replacement units out of a concealed area — behind the bin store, under where the car sits — and put the new blocks there rather than in the middle of the repair. And where drainage was the answer, the pipe is repaired and re-tested before any of this happens, because paving reinstated over fresh loose backfill produces a second hollow in the same place inside a year, on a job that is by then unambiguously yours.
Rebuilding from formation upward
A reinstatement bay is a small confined excavation, and the two things that go wrong in one are compaction and edges. A plate compactor cannot work within its own width of the vertical face of existing paving, so the perimeter of a repair is always its least compacted part, and that is exactly where the settlement will reappear if it is allowed to. Thinner lifts than you would use in the open, and a rammer where the plate physically cannot reach, is what closes that gap.
The sub-base goes back as an unbound aggregate placed in layers and brought up to the underside of the laying course, not to the underside of the blocks. Order it by weight, because that is how a merchant sells it, and work the tonnage off the finished thickness at the material's compacted density rather than off a loose bulk figure — a layer swallows noticeably more loose material than its finished volume suggests, and getting that wrong is a second delivery charge on a job with the drive open and the car on the road.
Nobody is running a nuclear density gauge on a domestic drive, but the principle behind BS 1377-4 still applies at this scale: a layer is compacted when further passes stop producing measurable settlement. The way to know is to sit a level on the surface and watch it between passes rather than count passes and hope. Two extra passes on a layer that has stopped moving cost nothing; two too few is the whole failure.
- Trim the excavation to vertical faces on the pattern line, and take out every loose block and all contaminated laying course rather than working around them.
- Prove the formation with a bar and dig out soft material where it moves under hand pressure, instead of bridging it with extra sub-base.
- Repair and re-test any drainage defect first, backfilling the pipe trench in compacted layers up to the underside of the sub-base before the pavement is touched.
- Place the sub-base in lifts thin enough for the machine on site, compacting each one fully out to the vertical faces with a rammer where the plate cannot reach.
- Check the finished sub-base level off a straightedge bridged onto the sound paving, so that the laying course can go down at one constant thickness rather than as a wedge.
- Screed the laying course uncompacted to that thickness, keep off it, and screed only as much as will be laid before the weather or the end of the day gets to it.
Sub-base is ordered against the compacted thickness the design calls for and the compacted density of the material actually going in, which is the point where a bulk bag short stops the job with the drive open.
The total area to be covered with gravel base.
The target compacted thickness of the base layer.
The in-place density of the base once it is compacted.
Gravel base needed
73.8 tons
Actual density varies by material gradation and compaction — confirm with your supplier's specific product density for a precise order quantity.
- Volume
- 39.81 yd³
- Equivalent in US (short) tons
- 73.82 tons
They open the calculator with your figures already in it
Gravel Base Layer Tonnage Calculator: 73.82 tons — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- This is a take-off, not a pavement design. It multiplies out whatever compacted thickness you enter; nothing here derives that depth from traffic loading, subgrade strength, drainage or frost depth, which come from a pavement design or your local road authority's standard.
- Geometry is a flat plan area at one uniform depth. Crown and cross-fall, a formation that steps between thicknesses, a dig that deepens where the subgrade was soft, and edge thickening or haunching at the perimeter all fall outside area x thickness.
- No waste, spillage or subgrade-loss allowance is applied. The figure is the exact in-place mass, so stone lost into a soft or uneven formation, over-excavation, haul and spread losses, and the tail end of a part-load all sit on top of it.
- The density field is an in-place compacted density. A supplier's loose bulk density and a weighbridge ticket carrying free moisture are different quantities, and substituting either moves the tonnage: the wetter the delivered material, the less dry stone a given delivered weight puts on the ground.
- It covers one layer of one material. A base and sub-base of different gradations, a bedding or blinding course, and the geotextile or separation membrane between stone and subgrade are not counted here.
The laying course, the level, and tying the bay in
The laying course is a screeded, uncompacted, constant-thickness layer of grit sand to the grading BS 7533 calls for. It is not a levelling medium, and on a repair the temptation to use it as one is enormous: the sub-base is 15 mm low in one corner and there is a heap of sand right there. Give in and the hollow returns in precisely that corner, because a thicker layer of sand consolidates by more than a thinner one, and does it under the first few wheel loads.
Tie the level in by measurement rather than by memory. The bay finishes proud of the surrounding paving before compaction by the amount your sand actually consolidates, and you can measure that in the trial opening instead of guessing it: screed a known thickness, bed two blocks on it, compact them and take the difference. Finish flush and the repair reads low after a month. Finish too proud and you have built a ridge that the first shovel of the winter will find.
Lay back in off the sound paving, never off the screeded sand. Clean the underside of every reused block, because a skin of old bedding stops a unit seating and rides it high. Run the joint width the surrounding field is running rather than the width that feels tidy — the joints are the load path between units, and a bay laid tight into a drive laid to its spacer bars is both structurally different and visible from the pavement.
Compact through a sole plate or a rubber mat, in overlapping passes across the bay and onto the sound paving around it, with the joints filled before the first pass and topped up after the last. Expect to top them up again after a week of the car going over it. A joint that is still taking sand a month later is not thirsty; it is telling you that something underneath is still moving, and that the diagnosis missed something. It is worth going back for that at week four rather than at month eighteen.
The screed comes out of the take-off as a volume and the merchant prices grit sand by weight in bulk bags, so the conversion is the last thing standing between the bay and a delivery note.
The volume of sand required, in cubic yards.
Approximate weight
13.5 short tons
About 1.35 short tons per cubic yard for dry building sand; damp sand is heavier and bulks up in volume. This is a planning figure, not a specification. Confirm the density with your supplier before ordering by weight.
- Conversion factor applied
- 1.35 short tons per cu yd
They open the calculator with your figures already in it
Sand Cubic Yards to Tons Calculator: 13.5 short tons — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
What this calculation does not cover
- Weight is the honest unit for sand, with one qualification: part of what a weighbridge records is water. Sand kept in the open carries whatever it has taken up, so a tonnage bought after a wet spell is less sand than the same tonnage bought dry, and nothing on the ticket separates the two.
- The density is for loose-tipped sand, not for sand in the ground. Undisturbed sandy ground is usually packed tighter than the heap it makes once it is dug, so a volume measured in the excavation converts to more tons than this returns. Do not borrow the correction from an earthworks take-off — sand loosens far less on digging than clay or mixed soil, and a swell factor lifted off those overstates it.
- A tonnage is what the sand weighs, not a check on what is carrying it. The sand for one small area already runs to tons, which is enough to matter on a trailer, on a scaffold or a suspended floor, and at the edge of an open excavation where the heap surcharges the face. Those limits come from the vehicle's rating, the structure's design or the excavation's support, not from this figure.
Sand is bought by the yard for bedding and screeding and sold by the ton at most aggregate yards, so this conversion sits between the take-off and the order. Sand has a peculiarity the other aggregates do not share: damp sand bulks, occupying noticeably more volume than the same sand dry or fully saturated, because surface water holds the grains apart. That means a volume measured from a damp stockpile overstates what is actually there, while the weight does not lie. Where accuracy matters, buy by weight and convert, rather than trusting a measured heap.
Proving it worked
Go back with the same straightedge, the same datum and the same grid, once after a month and again after a wet winter. A repair that has held reads within a couple of millimetres of where it was left; one that has dropped 5 mm has been resurfaced over a live fault, and the useful moment to learn that is while the cost is another morning rather than a second excavation. Keep the file too — trial hole depths, the photographs with the straightedge in shot, the CCTV coding if there was one, the date the pipe was tested. Block paving is the one hard surface that can be opened, corrected and closed with no trace at all, and that property is worth something only while somebody still knows what is underneath it.
Take-off for a lift-and-relay bay
Quantities follow the opening you decide on, not the size of the hollow — so price the bay after the trial hole and the drainage check, never before them.
- Area of the opening, squared to the block pattern — Taken past the last block that has moved and run out to a straight stretcher line, so full units lay back in without a ring of cuts.
- Sub-base by weight at the compacted thickness measured — An unbound aggregate to BS EN 13242, ordered by weight against the finished thickness at the material's compacted density, not at a loose bulk figure.
- Grit sand for the laying course — To the grading BS 7533 calls for, screeded at one constant thickness across the bay and never used to correct sub-base level.
- Replacement blocks for lifting losses — Count breakages honestly; take matched units from a concealed area and put the unweathered new ones there instead.
- Jointing material matching what is already down — Kiln-dried, polymeric or resin — mixing types across one drive is visible for the life of the surface regardless of the level.
- Edge restraint and haunching where the perimeter moved — Measured along the run being rebuilt including returns and stop ends, with sub-base carried out past the last block beneath it.
- Spoil off site and drainage testing, if the pipe is implicated — Contaminated laying course and failed sub-base do not go back; a CCTV coding or a tightness test is a line item, not an extra.
Opens the calculators above on one screen with the dimensions from this article already filled in. Quantities only — this site publishes no price list, because local prices vary too much to publish honestly.