Porch addition takeoff
Build a porch onto the front of the house: the footings dug by hand, cavity walls with the door and windows lintelled, a tiled or shingled lean-to with its flashing and gutter, a floor slab, the ceiling, plaster or taped drywall and tiles inside, and the doorway into the house, with every structural member listed and never sized.
- Measurements in
- 16
- Trades out
- 3332
- Calculators
- 25
- Going in
- 3332of 3332
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Choose the build-up
Each layer changes the materials below; the dimensions stay the same.
Calculators behind the other choices:
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Every trade's quantity · 33 rows
Every trade's quantity · 32 rows
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
A porch is a small building with a large share of joins. Its walls stand on footings of their own but meet the house at each end, where they are tied into the house wall with a vertical damp course between old and new; its roof leans on the house, so a cavity tray is cut into the house wall above the roof line and a flashing is dressed over the roof's top edge; and it is built round the front door, whose frame, step and threshold may all be disturbed. In England and Wales a small ground-floor porch is exempt from the building regulations while it keeps the front door between it and the house and the house's heating is not run into it; across North America an enclosed porch is an addition that needs a permit.
The walls on this page are cavity walls to full height, an inner leaf of block and an outer leaf of facing brick or of rendered (stucco) block, with the outer door in the front and windows where you put them. On walls this short, a run measured round the outside face is about a fifth longer than the inner leaf, so each leaf is measured along its own centre line, in three rows: clear of the openings at full height, over the heads of the door and windows, and under the windows' cills (sills). A lintel (a header) goes over every opening, bedded with its cavity tray, and the cavity is closed round each opening. The units a reader sees pick the bricks and blocks too: a British porch in 215 × 65 mm (about 8 1/2 × 2 1/2 in) brick on 440 × 215 mm (about 17 3/8 × 8 1/2 in) block when metric is showing, a North American one in US modular units when imperial is, with the other market's sizes one choice away.
The roof is a lean-to: rafters from a plate on the front wall up to the house, a fascia and gutter along the eave, and either tiles on battens or asphalt shingles on a boarded deck (sheathing). The units pick the covering, tiles when metric is showing and shingles when imperial is, each one choice away in the other. The tile's size follows the units too, a 300 mm (about 11 3/4 in) cover tile in metric and a 12 in (305 mm) one in imperial, and the fixing row's working gives the tile count. The two sides are verges, finished with dry verge units or mortar under tiles and a drip edge (rake trim) under shingles. A flat porch roof is not built here.
Inside, the ground is dug out, filled with hardcore, sealed with a membrane, insulated and cast as a slab, then screeded and, if chosen, tiled; the ceiling is boarded, the new walls finished and the whole porch painted. The units pick the finish as well: plaster in two coats on the walls and a skimmed ceiling, the British finish, when metric is showing, and drywall (plasterboard) on the walls as well as the ceiling, taped and finished with joint compound, the North American one, when imperial is. The front door into the house can stay as it is. Where it is widened or taken out to join the porch to the hall, the wall above is propped and carried on a lintel or a beam, which this page lists and never sizes, and in England and Wales taking that door out, or heating the porch from the house, can take the porch outside its exemption.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Settle the size against the planning rules and the building regulations' exemption, or take out the permit; have the footings, the lintels and any beam into the house chosen by the designer; and trace the drains, cables, pipes and any meter under the footprint.
- Take away any old canopy, porch or step, peg the three walls out square off the house wall by their diagonals, dig the trenches by hand, and have them seen before the concrete goes in.
- Pour the footings, build both leaves to the damp-proof course, dig out the floor, and lay the hardcore, the membrane lapped up to the damp course, the insulation and the slab.
- Raise both leaves together, tying each wall into the house with a vertical damp course where it meets it, closing the cavity round every opening and bedding a lintel and its tray over the door and each window.
- Fix the wall plate and the rafters, cut the cavity tray into the house wall above the roof line, and fix the fascia and the underlay; batten and tile, or deck and shingle, the slope, dress the flashing over its top edge, and hang the gutter with its downpipe run to a drain.
- Fit the outer door, its threshold and the windows. If the doorway into the house is to be widened, do it now, while the porch is still bare: prop the wall above, cut the opening and set its lintel or beam on its bearings. Then board the ceiling, plaster the walls or board them and tape and finish every joint, making good round the new opening, and screed the floor.
- Tile the floor once the screed has dried, paint, connect any light or socket and have it tested, and clear the spoil and the waste.
What this takeoff does not cover
- What any member must be to carry its load: the porch's footings and slab, the lintels over its door and windows, its rafters, and the lintel or beam, padstones and props at a widened doorway into the house. They appear as work to be done, or as a count at the design's spacing, never with a size.
- Planning permission, whether the porch is within the size that needs none, and whether it falls inside the building regulations' exemption, which the council decides; in North America, the permit office.
- A gas or electricity meter, or its box, inside the porch's footprint, which the supplier or utility moves.
- Heating the porch from the house, which in England and Wales can take it outside the exemption, and any radiator or circuit that would do it.
- The floor's damp-proof membrane (a vapor barrier, in North America) as a quantity: one sheet laid on the blinded hardcore and lapped up to the damp course, listed as work, with no seam between widths for the seam tape page to count.
- Drainage under the footprint beyond connecting the downpipe to a drain or soakaway, and a build-over agreement where a public sewer runs beneath.
- The masonry above the eaves in each side wall where it is built up to the roof's slope: each is a triangle, half the porch's depth times the roof's rise.
- A flat porch roof, whose deck, insulation, covering and trims are the flat roof replacement page's rows over this footprint; and a gabled or hipped porch roof's second slope, ridge and hips.
- Roof tiles as a row of their own: on the tiled lean-to, the row that ends "with the tile count" gives it as its working's units in total, before any cut at a verge or broken in handling.
- A glazed porch of frames on dwarf walls, whose masonry stops at the cill and whose frames, and what carries the roof on them, are the glazier's and the designer's.
- The outer (front) door and windows themselves, a step or ramp up to the outer door, and the reveals round the openings inside, a narrow strip at each that the plaster row does not count.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Width along the house 2.4 m · Projection from the house 1.5 m · Wall height, damp course to eaves 2.4 m and 13 more of the page's opening figures
Imperial opening
Width along the house 8 ft · Projection from the house 5 ft · Wall height, damp course to eaves 8 ft and 13 more of the page's opening figures
Quote check
Been given a quote for this job?
Paste it into the porch quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Concrete slab
3 tradesConcrete, reinforcement and formwork for a ground slab from one set of dimensions.
Run this takeoffTimber deck
4 tradesBoards, footings, fixings and finish for a rectangular deck.
Run this takeoffSegmental retaining wall
4 tradesBlocks, levelling pad, drainage stone and reinforcement layers for a block retaining wall.
Run this takeoff
Frequently asked questions
- What does the porch takeoff give for a typical job?
- Opened at Width along the house 2.4 m · Projection from the house 1.5 m · Wall height, damp course to eaves 2.4 m · Cavity wall thickness 300 mm · Outer door opening width 1 m · Height of the door and window heads 2.1 m · Windows 2 · Window opening width, each 0.6 m · Height of the window cills 0.9 m · Footing width, from the design 450 mm · Footing concrete depth, from the design 0.8 m · Trench depth 1 m · Damp-proof course above the ground 150 mm · Dig over the floor 250 mm · Roof slope factor 1.15 · Eaves overhang 150 mm, it orders: Footing trenches, dug by hand, 2.7 m³ (loose); Dig out the floor area, 0.68 m³ (loose); Footing concrete, 1.81 m³; Blocks below the damp course (DPC), both leaves, 35 blocks; Hardcore under the floor, 0.71 metric tons; Floor insulation boards, 1 sheet (2400x1200 mm); Floor slab concrete, 0.24 m³; Inner leaf blocks, full height, 55 blocks; Inner leaf blocks between the heads and the eaves, 7 blocks; Inner leaf blocks under the cills, 12 blocks; Facing bricks, full height, 470 bricks; Facing bricks between the heads and the eaves, 44 bricks; Facing bricks under the cills, 71 bricks; Wall ties across the cavity, 33 ties; Weeps above the damp course, 8 weep holes; Lean-to rafters (roof timbers), 5 trusses; Fascia, 1 x 3.6 m board; Roof underlay, breathable, 1 roll; Batten rows up the slope, 7 rows; Tile fixings (nails and clips), with the tile count, 111 fixings; Lead or metal flashing where the roof meets the house wall, 2 sheets; Gutter and downpipe (downspout) along the eave, 1 x 4 m section; Gutter brackets, 5 hangers; Flashing tape round the entrance frame, 8.8 m; Flashing tape round each glazing frame, 11.9 m; Ceiling board, 1 sheet; Plaster on the inside of the new walls, 89.1 kg; Skim coat on the ceiling board, 6.21 kg; Floor tiles, 7 tiles; Wall paint inside, 1.75 L; Ceiling paint, 0.43 L; Skip (dumpster) for the spoil, 3.38 m³. Opened at Width along the house 8 ft · Projection from the house 5 ft · Wall height, damp course to eaves 8 ft · Cavity wall thickness 11.8 in · Outer door opening width 3.5 ft · Height of the door and window heads 7 ft · Windows 2 · Window opening width, each 2 ft · Height of the window cills 3 ft · Footing width, from the design 18 in · Footing concrete depth, from the design 2.5 ft · Trench depth 3.5 ft · Damp-proof course above the ground 6 in · Dig over the floor 9.75 in · Roof slope factor 1.15 · Eaves overhang 6 in: Footing trenches, dug by hand, 3.9 yd³; Dig out the floor area, 0.91 yd³; Footing concrete, 2.34 yd³; Blocks below the damp course (DPC), both leaves, 57 blocks; Hardcore under the floor, 0.83 tons; Floor insulation boards, 1 sheet (4x8 ft); Floor slab concrete, 0.33 yd³; Inner leaf blocks, full height, 69 blocks; Inner leaf blocks between the heads and the eaves, 9 blocks; Inner leaf blocks under the cills, 15 blocks; Facing bricks, full height, 595 bricks; Facing bricks between the heads and the eaves, 57 bricks; Facing bricks under the cills, 91 bricks; Wall ties across the cavity, 33 ties; Weeps above the damp course, 8 weep holes; Lean-to rafters (roof timbers), 5 trusses; Fascia, 1 x 12 ft board; Roof deck boards, plywood or OSB, 2 sheets (4x8 ft); Roof underlay, breathable, 1 roll; Shingles, in squares, 0.56 squares; Lead or metal flashing where the roof meets the house wall, 1 sheet; Gutter and downpipe (downspout) along the eave, 1 x 10 ft section; Gutter brackets, 5 hangers; Flashing tape round the entrance frame, 29.7 ft; Flashing tape round each glazing frame, 39.6 ft; Ceiling board, 1 sheet; Drywall (plasterboard) on the new walls, 3 sheets; Joint compound (mud) for the walls and ceiling, 1 x 4.5 gal box; Joint tape for the walls and ceiling, 97.8 ft; Floor tiles, 7 tiles; Wall paint inside, 0.48 gal; Ceiling paint, 0.12 gal; Skip (dumpster) for the spoil, 4.81 yd³. Every figure follows the dimensions you give it.
- Which calculators does the porch takeoff run?
- 25 calculators, for 33 lines: Trench Excavation & Backfill Volume Calculator, Continuous Footing / Grade Beam Volume Calculator, Concrete CMU Block Counter & Grout Infill Calculator, Gravel Base Layer Tonnage Calculator, Foam Board Insulation Calculator, Concrete Calculator, Brick Calculator, Brick Veneer Wall Tie Density Calculator, Cavity Wall Weep Hole Spacing Calculator, Roof Truss Spacing & Count Calculator, Fascia Board Calculator, Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof), Roofing Underlayment Calculator, Roof Squares Calculator, Exterior Flashing Layout Trim Sheet Calculator, Gutter Calculator, Gutter Hanger Spacing Calculator, Window Opening Flashing Membrane Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Floor & Wall Tile Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.25 calculators, for 32 lines: Trench Excavation & Backfill Volume Calculator, Continuous Footing / Grade Beam Volume Calculator, Concrete CMU Block Counter & Grout Infill Calculator, Gravel Base Layer Tonnage Calculator, Foam Board Insulation Calculator, Concrete Calculator, Brick Calculator, Brick Veneer Wall Tie Density Calculator, Cavity Wall Weep Hole Spacing Calculator, Roof Truss Spacing & Count Calculator, Fascia Board Calculator, Roofing Underlayment Calculator, Roof Batten Spacing Calculator (Tile Roofing), Roof Covering Fixing Calculator, Exterior Flashing Layout Trim Sheet Calculator, Gutter Calculator, Gutter Hanger Spacing Calculator, Window Opening Flashing Membrane Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Float and Set Plaster Calculator, Skim Coat Plaster Calculator, Floor & Wall Tile Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the porch takeoff leave out?
- 11 things, each named on this page: What any member must be to carry its load; Planning permission, whether the porch is within the size that needs none, and whether it falls inside the building regulations' exemption, which the council decides; in North America, the permit office; A gas or electricity meter, or its box, inside the porch's footprint, which the supplier or utility moves; Heating the porch from the house, which in England and Wales can take it outside the exemption, and any radiator or circuit that would do it; The floor's damp-proof membrane (a vapor barrier, in North America) as a quantity; Drainage under the footprint beyond connecting the downpipe to a drain or soakaway, and a build-over agreement where a public sewer runs beneath; The masonry above the eaves in each side wall where it is built up to the roof's slope; A flat porch roof, whose deck, insulation, covering and trims are the flat roof replacement page's rows over this footprint; and a gabled or hipped porch roof's second slope, ridge and hips; Roof tiles as a row of their own; A glazed porch of frames on dwarf walls, whose masonry stops at the cill and whose frames, and what carries the roof on them, are the glazier's and the designer's; The outer (front) door and windows themselves, a step or ramp up to the outer door, and the reveals round the openings inside, a narrow strip at each that the plaster row does not count.
- Can I check a quote for this job against the takeoff?
- Yes. The porch quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.