Porch addition takeoff

Build a porch onto the front of the house: the footings dug by hand, cavity walls with the door and windows lintelled, a tiled or shingled lean-to with its flashing and gutter, a floor slab, the ceiling, plaster or taped drywall and tiles inside, and the doorway into the house, with every structural member listed and never sized.

Measurements in
16
Trades out
3332
Calculators
25
Going in
3332of 3332
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 4

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Outer leaf
Roof covering
Walls and ceiling inside
Floor finish
Brick, block, tile and flashing sizes
Outer leaf
Roof covering
Walls and ceiling inside
Floor finish
Brick, block, tile and flashing sizes

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 33 rows

33 of 33 going in
ItemQuantityOrderWaste / allowance
Footing trenches, dug by hand3.9 yd³3.9 yd³no pack size recorded25%
Dig out the floor area0.9138 yd³0.9138 yd³no pack size recorded25%
Footing concrete2.34 yd³2.34 yd³no pack size recorded5%
Blocks below the damp course (DPC), both leaves57 blocks57 blocksalready whole5%
Hardcore under the floor0.8341 tons0.8341 tonsno pack size recordednone
Floor insulation boards1 sheet (4x8 ft)1 sheet (4x8 ft)already whole10%
Floor slab concrete0.3299 yd³0.3299 yd³no pack size recorded10%
Inner leaf blocks, full height69 blocks69 blocksalready whole5%
Inner leaf blocks between the heads and the eaves9 blocks9 blocksalready whole5%
Inner leaf blocks under the cills15 blocks15 blocksalready whole5%
Facing bricks, full height595 bricks595 bricksalready whole10%
Facing bricks between the heads and the eaves57 bricks57 bricksalready whole10%
Facing bricks under the cills91 bricks91 bricksalready whole10%
Wall ties across the cavity33 ties33 tiesalready wholenone
Weeps above the damp course8 weep holes8 weep holesalready wholenone
Lean-to rafters (roof timbers)5 trusses5 trussesalready wholenone
Fascia1 x 12 ft board1 x 12 ft boardalready whole10%
Roof deck boards, plywood or OSB2 sheets (4x8 ft)2 sheets (4x8 ft)already whole10%
Roof underlay, breathable1 roll1 rollalready whole10%
Shingles, in squares0.5566 squares0.5566 squaresno pack size recorded10%
Lead or metal flashing where the roof meets the house wall1 sheet1 sheetalready wholenone
Gutter and downpipe (downspout) along the eave1 x 10 ft section1 x 10 ft sectionalready whole0%
Gutter brackets5 hangers5 hangersalready wholenone
Flashing tape round the entrance frame29.7 ft29.7 ftno pack size recorded10%
Flashing tape round each glazing frame39.6 ft39.6 ftno pack size recorded10%
Ceiling board1 sheet1 sheetalready whole10%
Drywall (plasterboard) on the new walls3 sheets3 sheetsalready whole10%
Joint compound (mud) for the walls and ceiling1 x 4.5 gal box1 x 4.5 gal boxalready whole10%
Joint tape for the walls and ceiling97.76 ft97.76 ftno pack size recorded10%
Floor tiles7 tiles7 tilesalready whole10%
Wall paint inside0.48 gal0.48 galno pack size recordednone
Ceiling paint0.1215 gal0.1215 galno pack size recordednone
Skip (dumpster) for the spoil4.81 yd³4.81 yd³no pack size recordednone

Every trade's quantity · 32 rows

32 of 33 going in
ItemQuantityOrderWaste / allowance
Footing trenches, dug by hand2.7 m³ (loose)2.7 m³loose) (no pack size recorded25%
Dig out the floor area0.675 m³ (loose)0.675 m³loose) (no pack size recorded25%
Footing concrete1.81 m³1.81 m³no pack size recorded5%
Blocks below the damp course (DPC), both leaves35 blocks35 blocksalready whole5%
Hardcore under the floor0.7128 metric tons0.7128 metric tonsno pack size recordednone
Floor insulation boards1 sheet (2400x1200 mm)1 sheet (2400x1200 mm)already whole10%
Floor slab concrete0.2376 m³0.2376 m³no pack size recorded10%
Inner leaf blocks, full height55 blocks55 blocksalready whole5%
Inner leaf blocks between the heads and the eaves7 blocks7 blocksalready whole5%
Inner leaf blocks under the cills12 blocks12 blocksalready whole5%
Facing bricks, full height470 bricks470 bricksalready whole10%
Facing bricks between the heads and the eaves44 bricks44 bricksalready whole10%
Facing bricks under the cills71 bricks71 bricksalready whole10%
Wall ties across the cavity33 ties33 tiesalready wholenone
Weeps above the damp course8 weep holes8 weep holesalready wholenone
Lean-to rafters (roof timbers)5 trusses5 trussesalready wholenone
Fascia1 x 3.6 m board1 x 3.6 m boardalready whole10%
Roof underlay, breathable1 roll1 rollalready whole10%
Batten rows up the slope7 rows7 rowsalready wholenone
Tile fixings (nails and clips), with the tile count111 fixings111 fixingsalready whole5%
Lead or metal flashing where the roof meets the house wall2 sheets2 sheetsalready wholenone
Gutter and downpipe (downspout) along the eave1 x 4 m section1 x 4 m sectionalready whole0%
Gutter brackets5 hangers5 hangersalready wholenone
Flashing tape round the entrance frame8.8 m8.8 mno pack size recorded10%
Flashing tape round each glazing frame11.88 m11.88 mno pack size recorded10%
Ceiling board1 sheet1 sheetalready whole10%
Plaster on the inside of the new walls89.12 kg89.12 kgno pack size recorded15%
Skim coat on the ceiling board6.21 kg6.21 kgno pack size recorded15%
Floor tiles7 tiles7 tilesalready whole10%
Wall paint inside1.75 L1.75 Lno pack size recordednone
Ceiling paint0.432 L0.432 Lno pack size recordednone
Skip (dumpster) for the spoil3.38 m³3.38 m³no pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

3332 of 33 trades32 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A porch is a small building with a large share of joins. Its walls stand on footings of their own but meet the house at each end, where they are tied into the house wall with a vertical damp course between old and new; its roof leans on the house, so a cavity tray is cut into the house wall above the roof line and a flashing is dressed over the roof's top edge; and it is built round the front door, whose frame, step and threshold may all be disturbed. In England and Wales a small ground-floor porch is exempt from the building regulations while it keeps the front door between it and the house and the house's heating is not run into it; across North America an enclosed porch is an addition that needs a permit.

The walls on this page are cavity walls to full height, an inner leaf of block and an outer leaf of facing brick or of rendered (stucco) block, with the outer door in the front and windows where you put them. On walls this short, a run measured round the outside face is about a fifth longer than the inner leaf, so each leaf is measured along its own centre line, in three rows: clear of the openings at full height, over the heads of the door and windows, and under the windows' cills (sills). A lintel (a header) goes over every opening, bedded with its cavity tray, and the cavity is closed round each opening. The units a reader sees pick the bricks and blocks too: a British porch in 215 × 65 mm (about 8 1/2 × 2 1/2 in) brick on 440 × 215 mm (about 17 3/8 × 8 1/2 in) block when metric is showing, a North American one in US modular units when imperial is, with the other market's sizes one choice away.

The roof is a lean-to: rafters from a plate on the front wall up to the house, a fascia and gutter along the eave, and either tiles on battens or asphalt shingles on a boarded deck (sheathing). The units pick the covering, tiles when metric is showing and shingles when imperial is, each one choice away in the other. The tile's size follows the units too, a 300 mm (about 11 3/4 in) cover tile in metric and a 12 in (305 mm) one in imperial, and the fixing row's working gives the tile count. The two sides are verges, finished with dry verge units or mortar under tiles and a drip edge (rake trim) under shingles. A flat porch roof is not built here.

Inside, the ground is dug out, filled with hardcore, sealed with a membrane, insulated and cast as a slab, then screeded and, if chosen, tiled; the ceiling is boarded, the new walls finished and the whole porch painted. The units pick the finish as well: plaster in two coats on the walls and a skimmed ceiling, the British finish, when metric is showing, and drywall (plasterboard) on the walls as well as the ceiling, taped and finished with joint compound, the North American one, when imperial is. The front door into the house can stay as it is. Where it is widened or taken out to join the porch to the hall, the wall above is propped and carried on a lintel or a beam, which this page lists and never sizes, and in England and Wales taking that door out, or heating the porch from the house, can take the porch outside its exemption.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Settle the size against the planning rules and the building regulations' exemption, or take out the permit; have the footings, the lintels and any beam into the house chosen by the designer; and trace the drains, cables, pipes and any meter under the footprint.
  2. Take away any old canopy, porch or step, peg the three walls out square off the house wall by their diagonals, dig the trenches by hand, and have them seen before the concrete goes in.
  3. Pour the footings, build both leaves to the damp-proof course, dig out the floor, and lay the hardcore, the membrane lapped up to the damp course, the insulation and the slab.
  4. Raise both leaves together, tying each wall into the house with a vertical damp course where it meets it, closing the cavity round every opening and bedding a lintel and its tray over the door and each window.
  5. Fix the wall plate and the rafters, cut the cavity tray into the house wall above the roof line, and fix the fascia and the underlay; batten and tile, or deck and shingle, the slope, dress the flashing over its top edge, and hang the gutter with its downpipe run to a drain.
  6. Fit the outer door, its threshold and the windows. If the doorway into the house is to be widened, do it now, while the porch is still bare: prop the wall above, cut the opening and set its lintel or beam on its bearings. Then board the ceiling, plaster the walls or board them and tape and finish every joint, making good round the new opening, and screed the floor.
  7. Tile the floor once the screed has dried, paint, connect any light or socket and have it tested, and clear the spoil and the waste.

What this takeoff does not cover

  • What any member must be to carry its load: the porch's footings and slab, the lintels over its door and windows, its rafters, and the lintel or beam, padstones and props at a widened doorway into the house. They appear as work to be done, or as a count at the design's spacing, never with a size.
  • Planning permission, whether the porch is within the size that needs none, and whether it falls inside the building regulations' exemption, which the council decides; in North America, the permit office.
  • A gas or electricity meter, or its box, inside the porch's footprint, which the supplier or utility moves.
  • Heating the porch from the house, which in England and Wales can take it outside the exemption, and any radiator or circuit that would do it.
  • The floor's damp-proof membrane (a vapor barrier, in North America) as a quantity: one sheet laid on the blinded hardcore and lapped up to the damp course, listed as work, with no seam between widths for the seam tape page to count.
  • Drainage under the footprint beyond connecting the downpipe to a drain or soakaway, and a build-over agreement where a public sewer runs beneath.
  • The masonry above the eaves in each side wall where it is built up to the roof's slope: each is a triangle, half the porch's depth times the roof's rise.
  • A flat porch roof, whose deck, insulation, covering and trims are the flat roof replacement page's rows over this footprint; and a gabled or hipped porch roof's second slope, ridge and hips.
  • Roof tiles as a row of their own: on the tiled lean-to, the row that ends "with the tile count" gives it as its working's units in total, before any cut at a verge or broken in handling.
  • A glazed porch of frames on dwarf walls, whose masonry stops at the cill and whose frames, and what carries the roof on them, are the glazier's and the designer's.
  • The outer (front) door and windows themselves, a step or ramp up to the outer door, and the reveals round the openings inside, a narrow strip at each that the plaster row does not count.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Width along the house 2.4 m · Projection from the house 1.5 m · Wall height, damp course to eaves 2.4 m and 13 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer18 h (9.4–39)2 days
Mason1 mason + 1 labourer29 h (19–58)2 days
Carpenter1 carpenter + 1 labourer1.9 h (1.0–4.8)under a quarter of a day
Roofer2 roofers6.1 h (2.7–18)half a day
Glazier2 glaziers12 h (3.0–24)1 day
Drywaller1 drywaller + 1 labourer0.3 h (0.2–0.6)under a quarter of a day
Plasterer1 plasterer1.5 h (0.9–3.0)under a quarter of a day
Tiler1 tiler1.3 h (0.8–2.6)under a quarter of a day
Painter1 painter2.0 h (1.1–4.4)under a quarter of a day
Rated rows72 h (38–155)6 days

Imperial opening

Width along the house 8 ft · Projection from the house 5 ft · Wall height, damp course to eaves 8 ft and 13 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer19 h (10–41)2½ days
Mason1 mason + 1 labourer38 h (25–76)2½ days
Carpenter1 carpenter + 1 labourer2.7 h (1.4–6.3)under a quarter of a day
Roofer2 roofers4.0 h (1.7–8.3)half a day
Glazier2 glaziers12 h (3.0–24)1 day
Drywaller1 drywaller + 1 labourer1.3 h (0.7–2.4)under a quarter of a day
Taper1 taper + 1 labourer1.4 h (0.8–2.9)under a quarter of a day
Tiler1 tiler1.4 h (0.8–2.7)under a quarter of a day
Painter1 painter2.0 h (1.1–4.5)half a day
Rated rows81 h (44–168)6½ days

Quote check

Been given a quote for this job?

Paste it into the porch quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the porch takeoff give for a typical job?
Opened at Width along the house 2.4 m · Projection from the house 1.5 m · Wall height, damp course to eaves 2.4 m · Cavity wall thickness 300 mm · Outer door opening width 1 m · Height of the door and window heads 2.1 m · Windows 2 · Window opening width, each 0.6 m · Height of the window cills 0.9 m · Footing width, from the design 450 mm · Footing concrete depth, from the design 0.8 m · Trench depth 1 m · Damp-proof course above the ground 150 mm · Dig over the floor 250 mm · Roof slope factor 1.15 · Eaves overhang 150 mm, it orders: Footing trenches, dug by hand, 2.7 m³ (loose); Dig out the floor area, 0.68 m³ (loose); Footing concrete, 1.81 m³; Blocks below the damp course (DPC), both leaves, 35 blocks; Hardcore under the floor, 0.71 metric tons; Floor insulation boards, 1 sheet (2400x1200 mm); Floor slab concrete, 0.24 m³; Inner leaf blocks, full height, 55 blocks; Inner leaf blocks between the heads and the eaves, 7 blocks; Inner leaf blocks under the cills, 12 blocks; Facing bricks, full height, 470 bricks; Facing bricks between the heads and the eaves, 44 bricks; Facing bricks under the cills, 71 bricks; Wall ties across the cavity, 33 ties; Weeps above the damp course, 8 weep holes; Lean-to rafters (roof timbers), 5 trusses; Fascia, 1 x 3.6 m board; Roof underlay, breathable, 1 roll; Batten rows up the slope, 7 rows; Tile fixings (nails and clips), with the tile count, 111 fixings; Lead or metal flashing where the roof meets the house wall, 2 sheets; Gutter and downpipe (downspout) along the eave, 1 x 4 m section; Gutter brackets, 5 hangers; Flashing tape round the entrance frame, 8.8 m; Flashing tape round each glazing frame, 11.9 m; Ceiling board, 1 sheet; Plaster on the inside of the new walls, 89.1 kg; Skim coat on the ceiling board, 6.21 kg; Floor tiles, 7 tiles; Wall paint inside, 1.75 L; Ceiling paint, 0.43 L; Skip (dumpster) for the spoil, 3.38 m³. Opened at Width along the house 8 ft · Projection from the house 5 ft · Wall height, damp course to eaves 8 ft · Cavity wall thickness 11.8 in · Outer door opening width 3.5 ft · Height of the door and window heads 7 ft · Windows 2 · Window opening width, each 2 ft · Height of the window cills 3 ft · Footing width, from the design 18 in · Footing concrete depth, from the design 2.5 ft · Trench depth 3.5 ft · Damp-proof course above the ground 6 in · Dig over the floor 9.75 in · Roof slope factor 1.15 · Eaves overhang 6 in: Footing trenches, dug by hand, 3.9 yd³; Dig out the floor area, 0.91 yd³; Footing concrete, 2.34 yd³; Blocks below the damp course (DPC), both leaves, 57 blocks; Hardcore under the floor, 0.83 tons; Floor insulation boards, 1 sheet (4x8 ft); Floor slab concrete, 0.33 yd³; Inner leaf blocks, full height, 69 blocks; Inner leaf blocks between the heads and the eaves, 9 blocks; Inner leaf blocks under the cills, 15 blocks; Facing bricks, full height, 595 bricks; Facing bricks between the heads and the eaves, 57 bricks; Facing bricks under the cills, 91 bricks; Wall ties across the cavity, 33 ties; Weeps above the damp course, 8 weep holes; Lean-to rafters (roof timbers), 5 trusses; Fascia, 1 x 12 ft board; Roof deck boards, plywood or OSB, 2 sheets (4x8 ft); Roof underlay, breathable, 1 roll; Shingles, in squares, 0.56 squares; Lead or metal flashing where the roof meets the house wall, 1 sheet; Gutter and downpipe (downspout) along the eave, 1 x 10 ft section; Gutter brackets, 5 hangers; Flashing tape round the entrance frame, 29.7 ft; Flashing tape round each glazing frame, 39.6 ft; Ceiling board, 1 sheet; Drywall (plasterboard) on the new walls, 3 sheets; Joint compound (mud) for the walls and ceiling, 1 x 4.5 gal box; Joint tape for the walls and ceiling, 97.8 ft; Floor tiles, 7 tiles; Wall paint inside, 0.48 gal; Ceiling paint, 0.12 gal; Skip (dumpster) for the spoil, 4.81 yd³. Every figure follows the dimensions you give it.
Which calculators does the porch takeoff run?
25 calculators, for 33 lines: Trench Excavation & Backfill Volume Calculator, Continuous Footing / Grade Beam Volume Calculator, Concrete CMU Block Counter & Grout Infill Calculator, Gravel Base Layer Tonnage Calculator, Foam Board Insulation Calculator, Concrete Calculator, Brick Calculator, Brick Veneer Wall Tie Density Calculator, Cavity Wall Weep Hole Spacing Calculator, Roof Truss Spacing & Count Calculator, Fascia Board Calculator, Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof), Roofing Underlayment Calculator, Roof Squares Calculator, Exterior Flashing Layout Trim Sheet Calculator, Gutter Calculator, Gutter Hanger Spacing Calculator, Window Opening Flashing Membrane Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Floor & Wall Tile Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.25 calculators, for 32 lines: Trench Excavation & Backfill Volume Calculator, Continuous Footing / Grade Beam Volume Calculator, Concrete CMU Block Counter & Grout Infill Calculator, Gravel Base Layer Tonnage Calculator, Foam Board Insulation Calculator, Concrete Calculator, Brick Calculator, Brick Veneer Wall Tie Density Calculator, Cavity Wall Weep Hole Spacing Calculator, Roof Truss Spacing & Count Calculator, Fascia Board Calculator, Roofing Underlayment Calculator, Roof Batten Spacing Calculator (Tile Roofing), Roof Covering Fixing Calculator, Exterior Flashing Layout Trim Sheet Calculator, Gutter Calculator, Gutter Hanger Spacing Calculator, Window Opening Flashing Membrane Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Float and Set Plaster Calculator, Skim Coat Plaster Calculator, Floor & Wall Tile Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the porch takeoff leave out?
11 things, each named on this page: What any member must be to carry its load; Planning permission, whether the porch is within the size that needs none, and whether it falls inside the building regulations' exemption, which the council decides; in North America, the permit office; A gas or electricity meter, or its box, inside the porch's footprint, which the supplier or utility moves; Heating the porch from the house, which in England and Wales can take it outside the exemption, and any radiator or circuit that would do it; The floor's damp-proof membrane (a vapor barrier, in North America) as a quantity; Drainage under the footprint beyond connecting the downpipe to a drain or soakaway, and a build-over agreement where a public sewer runs beneath; The masonry above the eaves in each side wall where it is built up to the roof's slope; A flat porch roof, whose deck, insulation, covering and trims are the flat roof replacement page's rows over this footprint; and a gabled or hipped porch roof's second slope, ridge and hips; Roof tiles as a row of their own; A glazed porch of frames on dwarf walls, whose masonry stops at the cill and whose frames, and what carries the roof on them, are the glazier's and the designer's; The outer (front) door and windows themselves, a step or ramp up to the outer door, and the reveals round the openings inside, a narrow strip at each that the plaster row does not count.
Can I check a quote for this job against the takeoff?
Yes. The porch quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.