The total length of the roof measured along the slope, from eave to ridge.
Along the slope, because battens are gauged down it. The run does not divide evenly either: the eave course is set at a shorter gauge so the first tile sits correctly over the fascia, and the top course has to land under the ridge. So the slope length is a whole number of gauges PLUS two special courses, and the adjustment is made across the field rather than left to the last batten.
The center-to-center spacing between batten rows, set by the tile manufacturer's gauge table.
Batten gauge is determined by the specific tile profile's headlap and exposure requirements — always use the tile manufacturer's specified gauge.
Batten rows needed
17 rows
They open the calculator with your figures already in it
Roof Batten Spacing Calculator (Tile Roofing): 17 rows — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Batten rows = ceil(roof slope length / batten gauge/spacing) + 1, the standard method for laying out tile roof battens
Inputs used
- Roof Slope Length
- 16.5 ft
- Batten Gauge (Spacing)
- 13 in
What this calculation does not cover
- Divides the slope by one fixed gauge, and a roof is not set out that way. The eave course and the top course have their own positions fixed by the tile's headlap at each end, and the courses between are then equalised so the gauge divides the remainder exactly — meaning the working gauge sits at or below the manufacturer's maximum, never at it. Running the maximum straight up from the eave leaves the last course short of headlap at the ridge, which is where the rain gets in.
- Returns rows, not battens to order. The quantity is rows multiplied by the width of the roof, plus the lap at every batten join — and those joins have to be staggered between adjacent courses and land on a rafter, so a stock batten length that does not suit the rafter centres wastes an offcut at every join.
- Says nothing about counter-battens. On a roof drained over the underlay, vertical counter-battens run up the slope beneath these horizontal ones so water can get past them to the eave. Without them each batten is a small dam holding water on the underlay, and the second quantity is roughly one counter-batten per rafter over the full slope length.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of bigger jobs
This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.
also measures10 other trades
also measures19 other trades
also measures24 other trades
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Batten rows = ceil(roof slope length / batten gauge/spacing) + 1, the standard method for laying out tile roof battens
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To batten and tile or slate the roof. Generic types, no brands, no prices.
Protection this work requires
- Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
- Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
- Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
- Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
- Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
Show the 5 tools this job needsHide tools
Essential
Chalk line
Claw hammer
Hand saw
Tape measure
Recommended
Angle grinder
Also needed as materials: chalk refill, cutting and diamond discs.
what each roofing tool is for, and the spec that decides which to buy where one does.