Job takeoff

Concrete slab takeoff

Concrete, reinforcement and formwork for a ground slab from one set of dimensions.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 3Measurements in
  • 3Trades out

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the concrete slab quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

3 of 3 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Concrete CalculatorVolume including a waste allowance.
Base
3.13 cubic yards
Waste factor
+0.313 cubic yards · 10%, trade convention
Adjusted
3.44 cubic yards
Order
3.44 cubic yards (no pack size recorded)
Why this quantity?
  1. Base quantity3.13 cubic yardscalculatorConcrete Calculator v1.0.1, headline with the waste factor at 0%
  2. Waste factor0.313 cubic yardsworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity3.44 cubic yardscalculatorConcrete Calculator v1.0.1, headline with the waste factor at 10%
  4. Order quantity3.44 cubic yardsworked out3.44 cubic yards (no pack size recorded)

Resting on

  • Slab length19.5 ftgivenyour slab length
  • Slab width13 ftgivenyour slab width
  • Slab thickness4 ingivenyour slab thickness
  • Waste Factor (%)10%assumedthe Concrete Calculator's default

The waste factor: the calculator's working figure, a trade convention.

Change any other figure on the Concrete Calculator

3.44 cubic yards
Rebar CalculatorReinforcement on a standard grid, with an allowance for lap splices.
Base
18 x 20 ft sticks
Lap-splice allowance
+3 x 20 ft sticks · 15%, trade convention
Adjusted
21 x 20 ft sticks
Order
21 x 20 ft sticks, already whole
Why this quantity?
  1. Base quantity18 x 20 ft stickscalculatorRebar Calculator v1.2.0, headline with the lap-splice allowance at 0%
  2. Lap-splice allowance3 x 20 ft sticksworked outthe adjusted figure less the base, at 15% (the calculator's working figure, a trade convention)
  3. Adjusted quantity21 x 20 ft stickscalculatorRebar Calculator v1.2.0, headline with the lap-splice allowance at 15%
  4. Order quantity21 x 20 ft sticksworked out21 x 20 ft sticks, already whole

Resting on

  • Slab length19.5 ftgivenyour slab length
  • Slab width13 ftgivenyour slab width
  • Grid Spacing (on-center): 18 in (typical residential)assumedthe Rebar Calculator's default
  • Lap-Splice Allowance (%)15%assumedthe Rebar Calculator's default

The lap-splice allowance: the calculator's working figure, a trade convention.

Change any other figure on the Rebar Calculator

21 x 20 ft sticks
Concrete Formwork CalculatorEdge formwork around the pour, as deep as the slab.
Base
9 x 8 ft boards
Cutting allowance
+0 x 8 ft boards · 10%, trade convention
Adjusted
9 x 8 ft boards
Order
9 x 8 ft boards, already whole
Why this quantity?
  1. Base quantity9 x 8 ft boardscalculatorConcrete Formwork Calculator v1.1.0, headline with the cutting allowance at 0%
  2. Cutting allowance0 x 8 ft boardsworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity9 x 8 ft boardscalculatorConcrete Formwork Calculator v1.1.0, headline with the cutting allowance at 10%
  4. Order quantity9 x 8 ft boardsworked out9 x 8 ft boards, already whole

Resting on

  • Slab length19.5 ftgivenyour slab length
  • Slab width13 ftgivenyour slab width
  • Slab thickness4 ingivenyour slab thickness
  • Cutting Allowance (%)10%assumedthe Concrete Formwork Calculator's default

The cutting allowance: the calculator's working figure, a trade convention.

Change any other figure on the Concrete Formwork Calculator

9 x 8 ft boards
Concrete CalculatorVolume including a waste allowance.
Base
2.4 m³
Waste factor
+0.24 m³ · 10%, trade convention
Adjusted
2.64 m³
Order
2.64 m³ (no pack size recorded)
Why this quantity?
2.64 m³
Rebar CalculatorReinforcement on a standard grid, with an allowance for lap splices.
Base
10 x 12 m sticks
Lap-splice allowance
+1 x 12 m stick · 15%, trade convention
Adjusted
11 x 12 m sticks
Order
11 x 12 m sticks, already whole
Why this quantity?
11 x 12 m sticks
Concrete Formwork CalculatorEdge formwork around the pour, as deep as the slab.
Base
9 x 2.4 m boards
Cutting allowance
+1 x 2.4 m board · 10%, trade convention
Adjusted
10 x 2.4 m boards
Order
10 x 2.4 m boards, already whole
Why this quantity?
10 x 2.4 m boards

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Concrete5.7 h (2.9–12)
  • Concrete Formwork2.0 h (1.2–5.0)

About 7.8 person-hours in the rows that carry them, between 4.1 and 17.

Trade by trade

  1. Labourer2 labourers + 1 mason + 1 plant operatorunder a quarter of a day
  2. Carpenter1 carpenter + 1 labourerunder a quarter of a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

1 row carries no hours of its own
  • Rebar: Fixing reinforcement is not rated here: the bar schedule, the shapes and laps it sets, and the inspection before the pour change its time several-fold.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Concrete5.8 h (2.9–12)
  • Concrete Formwork2.0 h (1.2–5.0)

About 7.8 person-hours in the rows that carry them, between 4.1 and 17.

Trade by trade

  1. Labourer2 labourers + 1 mason + 1 plant operatorunder a quarter of a day
  2. Carpenter1 carpenter + 1 labourerunder a quarter of a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

1 row carries no hours of its own
  • Rebar: Fixing reinforcement is not rated here: the bar schedule, the shapes and laps it sets, and the inspection before the pour change its time several-fold.

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

A ground slab is three separate orders that all come off one set of dimensions: the concrete itself by volume, the reinforcement by area, and the formwork by perimeter. They scale differently — double the length and the volume and the steel double, but the perimeter does not — which is exactly why estimating them together from one measurement is more reliable than estimating them apart.

Thickness is the input that carries the most risk on this page. It is a design decision, not a rule of thumb: a slab carrying a wall, a vehicle or a machine base is sized by an engineer against the ground it sits on, and a figure taken from a similar job is a guess about somebody else's soil.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Excavate to formation and remove the spoil.
  2. Lay and compact the sub-base in layers — a slab is only as good as what it sits on.
  3. Set the formwork to line and level, braced against the pour's pressure.
  4. Damp-proof membrane and any under-slab insulation, lapped and taped.
  5. Reinforcement on chairs, at the cover the design calls for, with laps to the drawing.
  6. Pour, compact, finish and then cure — curing is a step, not an afterthought.

What this takeoff does not cover

  • Any structural design. Thickness, mesh size, bar spacing and cover are an engineer's figures for your ground and your loading; this page takes them as given.
  • Excavation, spoil removal and the sub-base — none of which is derived from the slab's own dimensions.
  • Damp-proof membrane, radon barrier and under-slab insulation.
  • Chairs, tying wire and edge thickenings. Laps are in the rebar row, as a flat allowance on the bar length.
  • The pour itself: pump hire, access, curing compound, and cold or hot weather protection.

Quote check

Been given a quote for this job?

Paste it into the concrete slab quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the concrete slab takeoff give for a typical job?
Opened at Slab length 6 m · Slab width 4 m · Slab thickness 0.1 m, it orders: Concrete, 2.64 m³; Rebar, 11 x 12 m sticks; Concrete Formwork, 10 x 2.4 m boards. Opened at Slab length 19.5 ft · Slab width 13 ft · Slab thickness 4 in: Concrete, 3.44 cubic yards; Rebar, 21 x 20 ft sticks; Concrete Formwork, 9 x 8 ft boards. Every figure follows the dimensions you give it.
Which calculators does the concrete slab takeoff run?
3 calculators, one to a line: Concrete Calculator, Rebar Calculator, Concrete Formwork Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the concrete slab takeoff leave out?
5 things, each named on this page: Any structural design; Excavation, spoil removal and the sub-base; Damp-proof membrane, radon barrier and under-slab insulation; Chairs, tying wire and edge thickenings; The pour itself.
Can I check a quote for this job against the takeoff?
Yes. The concrete slab quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.