Rebar Calculator

Estimate the total length of rebar — linear feet or metres — and the number of sticks needed for a rectangular grid inside a concrete slab.

Estimated rebar needed: 11 x 20 ft sticks for Slab Length 13 ft and Slab Width 10 ft, the page's opening figures; on the metric page, 4 m and 3 m give 6 x 12 m sticks. Sources are cited below.

Rebar is reinforcement bar in the UK.

  • Answers as you type
  • 3 sources cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The length of the slab being reinforced.

Measure the concrete pour area's length.

Tools needed: Tape measure

The width of the slab being reinforced.

Measure perpendicular to the length.

Tools needed: Tape measure

Closer spacing means more reinforcement strength but more material.

Check your local code or a structural engineer's spec for load-bearing slabs — this is a general guideline, not a structural design.

Extra bar for the overlap where sticks join across a run longer than one stock length.

A lap is measured in bar diameters, so large bars and tension splices lap further than small ones. A small slab whose runs are shorter than a stock length has few splices and can take less; a large slab of heavier bars laps at nearly every bar and needs more.

The bar your drawing calls for: US #3 to #8, or a metric bar in mm.

Its nominal diameter weighs the schedule and sets how thick the bars are drawn. It does not change the grid or the stick count, and nothing here chooses it.

Concrete between the slab's edge and the ends of the bars.

Taken off both sides of each span and both ends of each bar, so the grid and the bar lengths are the clear ones inside it. Your drawing or code sets it; 0 runs the bars edge to edge, as this page always has.

The overlap the schedule adds wherever a bar is longer than one stock length.

Often 40 to 60 bar diameters (about 600 mm, 24 in, for a #4 or 12 mm bar); take it from your drawing. Bars no longer than the stock (20 ft, or 12 m in metric markets) have no lap. The stick count above keeps the flat allowance.

Estimated rebar needed

11 x 20 ft sticks

Medium confidence

General-purpose slab reinforcement guideline, not a structural engineering design — load-bearing or code-required slabs should follow an engineer's specification.

Total bar length (incl. 15% lap splice)
208.15 ft
Bars running lengthwise
7 bars
Bars running widthwise
9 bars
Schedule: each lengthwise bar, as laid with its laps
13 ft
Schedule: each widthwise bar, as laid with its laps
10 ft
Schedule: laps at your lap length
0 laps
Schedule: total bar, laps at your lap length
181 ft
Schedule: steel weight
120.95 lb

Formula with your numbers

  1. Count the bars each way ÷ , rounded down, + 1 = 7 bars; ÷ the same spacing, rounded down, + 1 = 9 bars
  2. Add up the bar, add the laps and divide by the stock length(7 bars × + 9 bars × ) + % for laps, ÷ one 20 ft or 12 m stick, rounded up = 11 x 20 ft sticks
  3. Weigh the steel181 ft × the weight per length of = 120.95 lb
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Rebar is most commonly sold in 20 ft lengths in North America and in 12 m mill lengths in metric markets (6 m being the common short length); grid spacing for residential slabs is commonly 12-18 in (300-450 mm) on-center in both directions
  • A lap-splice allowance, 15% by default, is added to account for the overlap required where rebar sticks join end-to-end across a run longer than one stock length, per common ACI 318 lap-length practice
  • Reinforcing bar mass from its nominal diameter, 7850 kg/m³ x π d² / 4: 10 mm 0.617 kg/m, 12 mm 0.888 kg/m (BS 4449 tables); #3 0.376, #4 0.668, #5 1.043 lb/ft (ASTM A615 Table 1); Canadian 10M 11.3 mm nominal (CSA G30.18)

Inputs used

Slab Length
13 ft
Slab Width
10 ft
Grid Spacing (on-center)
18 in (typical residential)
Lap-Splice Allowance (%)
15
Bar size
#4 (1/2 in)
Edge cover to the bars (0 for none)
0 in
Lap length at each splice, for the schedule
24 in

Intermediate steps

Total bar length (incl. 15% lap splice)
208.15 ft
Bars running lengthwise
7 bars
Bars running widthwise
9 bars
Schedule: each lengthwise bar, as laid with its laps
13 ft
Schedule: each widthwise bar, as laid with its laps
10 ft
Schedule: laps at your lap length
0 laps
Schedule: total bar, laps at your lap length
181 ft
Schedule: steel weight
120.95 lb
Final result11 x 20 ft sticks

Confidence note: General-purpose slab reinforcement guideline, not a structural engineering design — load-bearing or code-required slabs should follow an engineer's specification.

What this calculation does not cover

  • This is a quantity take-off, not a structural design. It does not choose bar size, grade, cover, slab thickness, or the spacing the load actually requires — a slab that carries load, spans between supports, or needs a permit takes an engineer's reinforcement schedule, and this calculator never asks what the slab is for.
  • It lays out one flat mat inside one rectangle. A second (top) mat, perimeter and edge bars, corner and opening trim bars, thickened edges, footing or grade-beam steel, and dowels tying the slab to a footing are all outside the count, as is any L-shaped or non-rectangular pour.
  • Stick count is total bar length divided by stock length, which assumes every offcut is used somewhere. Bars cut to a slab dimension usually leave a remainder too short for the next full-length bar, so the number of sticks you actually have to buy is often higher than the figure shown.
  • The lap allowance is a flat percentage on the whole take-off. Real lap length is set by bar diameter, concrete strength, and whether the splice is in tension or compression — none of which this calculator asks for — so at the 15% default the allowance is short on large bars or high-demand splices and generous on small bars; set it from the bar schedule where there is one.
  • The grid runs edge to edge across the slab dimensions you enter unless you give an edge cover, which is then taken off both sides of each span and both ends of each bar. Chairs, bar supports, and tie wire are not counted at all.
  • The bar schedule and the PDF list straight bars only, with a lap of your lap length wherever a bar is longer than one stock length; its total can differ from the stick count above, which uses the flat allowance. Hooks, bends and shape codes are the detailer's. Bar size, spacing, cover and lap are yours to enter: a structural engineer or the building official decides them.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Plan of the slab, 13′ by 10′, with 7 bar(s) lengthwise and 9 bar(s) widthwise.13′10′

Part of bigger jobs

This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.

Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-10-31 · 20 test vectors · v1.3.0

Regulatory standards & verification citations3
  1. Rebar is most commonly sold in 20 ft lengths in North America and in 12 m mill lengths in metric markets (6 m being the common short length); grid spacing for residential slabs is commonly 12-18 in (300-450 mm) on-center in both directions
  2. A lap-splice allowance, 15% by default, is added to account for the overlap required where rebar sticks join end-to-end across a run longer than one stock length, per common ACI 318 lap-length practice
  3. Reinforcing bar mass from its nominal diameter, 7850 kg/m³ x π d² / 4: 10 mm 0.617 kg/m, 12 mm 0.888 kg/m (BS 4449 tables); #3 0.376, #4 0.668, #5 1.043 lb/ft (ASTM A615 Table 1); Canadian 10M 11.3 mm nominal (CSA G30.18)

Which documents these citations point at

Standards referenced: ACI 318 (American Concrete Institute, United States); ASTM A615 (ASTM International, United States); CSA G30.18 (CSA Group, Canada).

Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To fix reinforcement. Generic types, no brands, no prices.

Protection this work requires

  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
  • Nailing, chiselling and cutting all throw fragments: glasses to EN 166 or ANSI Z87.1, and goggles rather than glasses overhead.
Show the 4 tools this job needs

Essential

  • Tape measure

Recommended

  • Rebar cutter and bender

  • Rebar tying tool

Optional

  • Angle grinder

Also needed as materials: cutting and diamond discs, tie wire.

what each concrete tool is for, and the spec that decides which to buy where one does.

Rebar grid — drawn from your figures

7 bars one way and 9 the other, at 18 in centres, on a 3.96 x 3.05 m slab.

A DXF plan in metres. Opens in AutoCAD, LibreCAD, QCAD and most jobsite viewers.

What this drawing does not show (3)
  • Concrete cover. Bars are drawn to the slab edge because that is how the quantity is counted; on site they stop short of it.
  • Lap splices, which the quantity applies as a factor rather than placing.
  • Bar diameter, chairs, and anything about depth — this is a single plan layer.

It is a setting-out aid drawn from the figures you entered, not a construction drawing, and nobody has checked it against a design.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Called something else where you work? Reinforcement / rebar — the term in each market, how close the equivalence really is, and the standard that governs it.

Still deciding? Rebar vs Fiber Mesh in a Concrete Slab · Post-Tensioned Slab vs Rebar Slab — the factors that actually differ, with no invented prices.

Worked examples: Garden room slab — step 6 of 9 · Concrete driveway replaced — step 6 of 10

Worked for these jobs: A garage slab's grid, in stock lengths of bar · A Canadian garage slab, in metric bar

How to calculate rebar in 3 steps

  1. Count the bars each wayDivide each clear span (the slab less any edge cover) by the bar spacing, round down, and add one bar for the far edge.
  2. Add up the bar, add the laps and divide by the stock lengthMultiply each way's bar count by its bar length, add the two, add the lap-splice allowance, divide by the stock length and round up to whole sticks.
  3. Weigh the steelMultiply the scheduled bar length by the bar's weight per foot or per metre, taken from its nominal diameter.

Rebar for common slab sizes

Page defaults, not your figures above.

Slab (length × width)Estimated rebar needed
10 × 12 ft (3.05 × 3.66 m)11 x 20 ft sticks
14 × 14 ft (4.27 × 4.27 m)17 x 20 ft sticks
20 × 20 ft (6.1 × 6.1 m)33 x 20 ft sticks
22 × 24 ft (6.71 × 7.32 m)43 x 20 ft sticks
30 × 30 ft (9.14 × 9.14 m)73 x 20 ft sticks
3 × 4 m (9.84 × 13.12 ft)6 x 12 m sticks
4.5 × 4.5 m (14.76 × 14.76 ft)9 x 12 m sticks
6 × 7 m (19.69 × 22.97 ft)19 x 12 m sticks

Key facts

  • ASTM A615 Table 1 weighs #3 reinforcing bar at 0.376 lb/ft, #4 at 0.668 lb/ft and #5 at 1.043 lb/ft; BS 4449 gives 10 mm bar 0.617 kg/m and 12 mm 0.888 kg/m. (ASTM A615 Table 1 and BS 4449 (bar weights))
  • Rebar is commonly sold in 20 ft (6.1 m) stock lengths in North America and in 12 m (39.4 ft) mill lengths in metric markets, where 6 m (19.7 ft) is the common short length. (Rebar stock lengths, trade practice)
  • Residential slab reinforcement grids are commonly spaced 12 to 18 in (300 to 450 mm) on centre in both directions. (Residential slab grid practice)
  • The rebar page adds a 15% lap-splice allowance by default for the overlap where bars join across a run longer than one stock length, following common ACI 318 lap-length practice. (ACI 318 lap-length practice)

Frequently asked questions

Is this a structural engineering calculation?
No — this is a general material-quantity guideline for common residential slab reinforcement patterns. Load-bearing slabs, foundations, and anything requiring a permit should follow a structural engineer's rebar specification.
What rebar size (diameter) should I use?
The size your drawing or engineer gives; this page does not choose one. Pick it under Bar size (US #3 to #8, or a metric bar in mm, including Canada's 10M) and the schedule weighs every bar mark from its nominal diameter. The size does not change the grid or the stick count.
Do I need rebar for every concrete slab?
Not always — thin non-structural slabs (some sidewalks) sometimes use wire mesh instead, or no reinforcement. Check local code requirements for your specific project.
How many 20 ft sticks does the opening 13 × 10 ft slab need?
Eleven 20 ft sticks at 18 in (450 mm) centres each way with the 15% lap allowance: 7 bars along the slab's 13 ft and 9 across its 10 ft make 181 ft of bar, and 208 ft with the allowance. The metric opening, 4 × 3 m on the same grid, takes 6 of the 12 m mill lengths. Each way the bars are the span over the spacing, rounded down, plus one.
How much does the rebar for a slab weigh?
About 121 lb for the opening 13 × 10 ft grid of #4 bar, which weighs 0.668 lb per foot (ASTM A615), and about 55 kg for the 4 × 3 m metric grid. The schedule weighs every bar from its nominal diameter at 7,850 kg/m³ of steel, so a heavier bar changes the weight but never the grid or the stick count.
Why does the schedule show no laps when the stick count adds 15%?
Because no bar in the opening slab is longer than one 20 ft (12 m) stock bar, so none is spliced. The schedule counts a lap at your lap length only where a bar is longer than the stock; the stick count above keeps the flat 15% allowance, so on a small slab the two totals differ and the stick count is the more generous.
Why might I need more sticks than the page shows?
Because the count divides the total length by the stock length as if every offcut were used: cut bar by bar, the opening grid takes 12 sticks against the page's 11. Each 13 ft bar uses a whole 20 ft stick and leaves 7 ft, too short for a 10 ft bar, while two 10 ft bars come from one stick. Lay out the cuts before ordering, or order one or two over.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.