SettingsSettings for this calculationUS
Waste is set to 5% by hand. Pick a tier above to replace it, or keep your own figure.
The total length of the wall run.
Measure the full horizontal run of the wall along the floor.
Extra material to allow for cut waste and overlaps.
5% is typical for straight runs; increase it for walls with many corners, offsets, or openings that create more offcuts.
Total track needed
69.3 ft
They open the calculator with your figures already in it
Light-Gauge Steel Track Linear Footage Calculator: 69.3 ft — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- A stud wall requires one continuous track at the top and one at the bottom of the same length: total track length = 2 × wall length × (1 + waste allowance)
Inputs used
- Wall Length
- 33 ft
- Waste Allowance (%)
- 5
What this calculation does not cover
- Track is bought in sticks, not in metres. A 3 m length across a 10 m wall is four pieces per run whatever the total says, every joint has to be lapped or backed by a stud, and where those joints fall is a setting-out decision rather than an arithmetic one. A waste percentage will not turn a linear figure into a delivery schedule.
- Says nothing about how either run is fixed down, which is what actually restrains the wall. Anchor type and spacing at the slab and at the head — commonly around 600 mm centres, and prescribed exactly in any fire-rated, acoustic or seismically braced assembly — are what the head and base have to develop. Track cut to a perfect length and shot down with the wrong fastener at the wrong centres is a wall with no restraint at its ends.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- A stud wall requires one continuous track at the top and one at the bottom of the same length: total track length = 2 × wall length × (1 + waste allowance)