Materials & Quantities

Concrete Formwork Calculator

Estimate the edge-form board footage and surface area needed to contain a concrete slab pour.

Form boards needed: 7 x 8 ft boards for Slab Length 13 ft, Slab Width 10 ft and Form Board Height 4 in, the page's opening figures; on the metric page, 4 m, 3 m and 10 cm give 7 x 2.4 m boards. Sources are cited below.

  • Answers as you type
  • 1 source cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Who is doing the work?

The standard allowance most suppliers and estimating guides assume for ordinary work.

The length of the slab or footing being formed.

Use the same dimensions as the Concrete Calculator.

The width of the slab or footing.

Measure perpendicular to the length.

The height of the form boards, matching the slab's edge thickness.

This is the same as the slab thickness in the Concrete Calculator, since the form must fully contain the pour depth.

Extra board length for cut ends, corner laps and stakes ripped from offcuts.

Edge forms are cut at every corner and usually lapped past each other so the corner can be screwed tight, and the offcuts often end up as stakes. A plain rectangle on a clean subgrade sits near ten; a pour with steps, blockouts or boards already split on a previous job wants more.

Form boards needed

7 x 8 ft boards

Medium confidence

This estimates edge-form board footage only — it doesn't include stakes, bracing, or release agent, and assumes a simple rectangular pour with no interior forms or curves.

Formwork surface area
15.33 sq ft
Perimeter (with waste)
50.6 linear ft

Formula with your numbers

  1. Measure the perimeter and add the cutting allowance2 × ( + ) + % = 50.6 linear ft
  2. Divide by one board and round up50.6 linear ft ÷ one 8 ft or 2.4 m board, rounded up = 7 x 8 ft boards
  3. Work out the form face2 × ( + ) × = 15.33 sq ft
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Formwork surface area = perimeter x form height (2 x [length + width] x thickness); board count = perimeter / stock board length, with a waste allowance for stakes and cuts. Form timber is commonly stocked in 8 ft boards in North America, and in the 2.4 m lengths metric timber merchants run, structural timber there stepping by 300 mm

Inputs used

Slab Length
13 ft
Slab Width
10 ft
Form Board Height (Slab Thickness)
4 in
Cutting Allowance (%)
10

Intermediate steps

Formwork surface area
15.33 sq ft
Perimeter (with waste)
50.6 linear ft
Final result7 x 8 ft boards

Confidence note: This estimates edge-form board footage only — it doesn't include stakes, bracing, or release agent, and assumes a simple rectangular pour with no interior forms or curves.

What this calculation does not cover

  • Rectangles only. The perimeter is taken as 2 x (length + width), so L-shapes, curved edges, steps, blockouts and any interior or divider forms are not counted. Break an irregular pour into rectangles and add the runs together.
  • One course of boards. The count divides the perimeter by a single stock length (8 ft, or 2.4 m on the metric setting) and never doubles it, so if the form height is taller than the width of the board stock you actually buy, the second course is on you.
  • Perimeter boards only. Stakes, kickers, braces, walers, ties, screws and form-release agent are not counted, and the cutting allowance covers waste on the run rather than any of that hardware.
  • This is a take-off, not a formwork design. Nothing here checks whether the boards and stakes will hold the lateral pressure of wet concrete, which depends on pour rate, mix, slump and temperature. For anything deeper than a slab edge, bracing and tie spacing are a separate check.
  • Ground-supported edge forms only. There is nothing for the decking, joists, stringers or shoring under a suspended slab, and nothing for excavation, screed rails or subgrade preparation.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

Plan of the slab, 13′ by 10′.13′10′

Part of a bigger job

This trade is one line of a job takeoff. Run the whole job and every other trade comes back with it, off the same measurements.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-17 · 3 test vectors · v1.1.0

Regulatory standards & verification citations1
  1. Formwork surface area = perimeter x form height (2 x [length + width] x thickness); board count = perimeter / stock board length, with a waste allowance for stakes and cuts. Form timber is commonly stocked in 8 ft boards in North America, and in the 2.4 m lengths metric timber merchants run, structural timber there stepping by 300 mm
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To place and finish concrete, erect formwork and saw-cut cured concrete. Generic types, no brands, no prices.

Protection this work requires

  • Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
  • Hardwood dust is a recognised carcinogen: extract at the tool and wear a P2/N95 respirator when cutting or sanding indoors.
  • Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
Show the 17 tools this job needs

Essential

  • Angle grinder

  • Bull float and edger

  • Circular saw

  • Claw hammer

  • Dust extractor or vacuum with a fine filter

  • Screed bar or rail

  • Shovel and spade

  • Spirit level

  • String line and pins

  • Tape measure

  • Wheelbarrow

Recommended

  • Chalk line

  • Cordless drill/driver

  • Floor or cut-off saw

  • Plate compactor

  • SDS rotary hammer

Optional

  • Power float

Also needed as materials: chalk refill, circular saw blades, cutting and diamond discs, diamond blades, drill and driver bits, SDS bits and chisels.

what each concrete tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Called something else where you work? Formwork and shuttering — the term in each market, how close the equivalence really is, and the standard that governs it.

Worked examples: Garden room slab — step 5 of 9 · Concrete driveway replaced — step 5 of 10

The data behind it: Production rates by operation

How to calculate concrete formwork in 3 steps

  1. Measure the perimeter and add the cutting allowanceAdd the slab's length and width, double it for the perimeter, and add the cutting allowance for cut ends and corner laps.
  2. Divide by one board and round upDivide the run by the stock board length, 8 ft in North America or 2.4 m in metric markets, and round up to whole boards.
  3. Work out the form faceMultiply the perimeter, without the allowance, by the form height for the area of form in contact with the concrete.

Form boards needed by slab length

Page defaults, not your figures above.

Slab LengthForm boards needed (x 8 ft boards)
10 ft6
15 ft7
20 ft9
25 ft10

Key facts

  • A slab's edge-form face area is its perimeter times the form height: 2 × (length + width) × slab thickness. (Craft Quantities formwork formula)
  • Form timber is commonly stocked in 8 ft (2.44 m) boards in North America and in 2.4 m (7.9 ft) lengths in metric markets, where structural timber steps by 300 mm (about 12 in). (Form timber stock lengths)
  • Quikrete's Concrete Mix data sheet prepares a slab by staking out the area, removing sod or soil to depth, nailing and staking forms securely in place, and tamping the sub-base until firm. (Quikrete 1101 data sheet)

Frequently asked questions

Why does form board height need to match slab thickness?
The form's job is to hold wet concrete in place until it cures — if the board is shorter than the slab thickness, concrete will spill over the top edge during the pour.
Do I need stakes too?
Yes — forms are held in place with stakes driven into the ground roughly every 2-3 ft (0.6-0.9 m) along the form, a small separate material not included in this board-footage estimate.
Can I reuse formwork boards for future projects?
Yes, especially if you avoid nailing directly through them and coat them with a release agent (like vegetable oil or a commercial form-release product) to prevent concrete from bonding to the wood.
How many 8 ft boards go round the opening slab?
Seven: the 13 × 10 ft slab's 46 ft perimeter plus the 10% cutting allowance is 50.6 ft, and 50.6 ÷ 8 rounds up to 7. The 4 × 3 m metric slab also takes 7 boards, of the 2.4 m length metric merchants stock: 14 m of perimeter plus 10% is 15.4 m. The count is board length only, one course high, with nothing for stakes or braces.
What if the slab is thicker than one board is wide?
Multiply the count by the rows of boards yourself: the page lays one course round the perimeter and never stacks a second, so a pour deeper than the face width of the board stock you buy needs two or more rows. The Concrete Calculator's edge-form rows stack whole boards to the slab's depth if you want that worked for you.
What is the formwork surface area for?
It is the face of form that touches the concrete, the perimeter times the form height: 15.3 sq ft for the opening 13 × 10 ft slab at 4 in, 1.4 m² for the 4 × 3 m slab at 10 cm. Work release agent, or plywood form faces cut from sheets, from it; it carries no cutting allowance.
Does the cutting allowance cover the stakes?
Only the offcuts: the 10% default is extra board length for cut ends and corner laps, and those offcuts often end up as stakes, but stakes, kickers, braces, screws and release agent bought on their own are not counted. Raise the allowance for a pour with steps or blockouts, or for boards already split on a previous job.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.