Job takeoff

Strip footing takeoff

Concrete, backfill and reinforcement for a continuous footing under a wall.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 5Measurements in
  • 3Trades out

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the strip footing quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

3 of 3 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Continuous Footing / Grade Beam Volume CalculatorThe concrete that goes in — the designed footing, not the hole.
Base
7.11 yd³
Waste factor
+0.3554 yd³ · 5%, trade convention
Adjusted
7.46 yd³
Order
7.46 yd³ (no pack size recorded)
Why this quantity?
  1. Base quantity7.11 yd³calculatorContinuous Footing / Grade Beam Volume Calculator v1.0.1, headline with the waste factor at 0%
  2. Waste factor0.3554 yd³worked outthe adjusted figure less the base, at 5% (the calculator's working figure, a trade convention)
  3. Adjusted quantity7.46 yd³calculatorContinuous Footing / Grade Beam Volume Calculator v1.0.1, headline with the waste factor at 5%
  4. Order quantity7.46 yd³worked out7.46 yd³ (no pack size recorded)

Resting on

  • Footing length98 ftgivenyour footing length
  • Footing width2 ftgivenyour footing width
  • Footing depth11.75 ingivenyour footing depth
  • Waste Factor (%)5%assumedthe Continuous Footing / Grade Beam Volume Calculator's default

The waste factor: the calculator's working figure, a trade convention.

Change any other figure on the Continuous Footing / Grade Beam Volume Calculator

7.46 yd³
Trench Excavation & Backfill Volume CalculatorThe backfill round the wall, above the footing, for a trench dug to the footing's width: the footing length, by the footing width less the wall's, by the trench depth less the footing's, with no pipe deducted. Its excavation line is that fill space, not the dig. A trench-fill footing, poured to the top, has no row.
Base
9.93 yd³
Loose-volume allowance
+1.49 yd³ · 15%, trade convention
Adjusted
11.42 yd³
Order
11.42 yd³ (no pack size recorded)
Why this quantity?
  1. Base quantity9.93 yd³calculatorTrench Excavation & Backfill Volume Calculator v1.1.0, headline with the loose-volume allowance at 0%
  2. Loose-volume allowance1.49 yd³worked outthe adjusted figure less the base, at 15% (the calculator's working figure, a trade convention)
  3. Adjusted quantity11.42 yd³calculatorTrench Excavation & Backfill Volume Calculator v1.1.0, headline with the loose-volume allowance at 15%
  4. Order quantity11.42 yd³worked out11.42 yd³ (no pack size recorded)

Resting on

  • Footing length98 ftgivenyour footing length
  • Footing width2 ftgivenyour footing width
  • Wall thickness below ground7.75 ingivenyour wall thickness below ground
  • Trench depth3 ftgivenyour trench depth
  • Footing depth11.75 ingivenyour footing depth
  • Pipe Diameter0 inassumedset by the Strip footing takeoff
  • Bedding Below the Pipe0 inassumedthe Trench Excavation & Backfill Volume Calculator's default
  • Surround Cover Above the Pipe0 inassumedthe Trench Excavation & Backfill Volume Calculator's default
  • Compaction Loose-Volume Factor (%)15%assumedthe Trench Excavation & Backfill Volume Calculator's default

The loose-volume allowance: the calculator's working figure, a trade convention.

Change any other figure on the Trench Excavation & Backfill Volume Calculator

11.42 yd³
Rebar CalculatorA mesh-equivalent across the footing's plan — not a bar schedule.
Base
17 x 20 ft sticks
Lap-splice allowance
+2 x 20 ft sticks · 15%, trade convention
Adjusted
19 x 20 ft sticks
Order
19 x 20 ft sticks, already whole
Why this quantity?
  1. Base quantity17 x 20 ft stickscalculatorRebar Calculator v1.2.0, headline with the lap-splice allowance at 0%
  2. Lap-splice allowance2 x 20 ft sticksworked outthe adjusted figure less the base, at 15% (the calculator's working figure, a trade convention)
  3. Adjusted quantity19 x 20 ft stickscalculatorRebar Calculator v1.2.0, headline with the lap-splice allowance at 15%
  4. Order quantity19 x 20 ft sticksworked out19 x 20 ft sticks, already whole

Resting on

  • Footing length98 ftgivenyour footing length
  • Footing width2 ftgivenyour footing width
  • Grid Spacing (on-center): 18 in (typical residential)assumedthe Rebar Calculator's default
  • Lap-Splice Allowance (%)15%assumedthe Rebar Calculator's default

The lap-splice allowance: the calculator's working figure, a trade convention.

Change any other figure on the Rebar Calculator

19 x 20 ft sticks
Continuous Footing / Grade Beam Volume CalculatorThe concrete that goes in — the designed footing, not the hole.
Base
5.4 m³
Waste factor
+0.27 m³ · 5%, trade convention
Adjusted
5.67 m³
Order
5.67 m³ (no pack size recorded)
Why this quantity?
5.67 m³
Trench Excavation & Backfill Volume CalculatorThe backfill round the wall, above the footing, for a trench dug to the footing's width: the footing length, by the footing width less the wall's, by the trench depth less the footing's, with no pipe deducted. Its excavation line is that fill space, not the dig. A trench-fill footing, poured to the top, has no row.
Base
7.2 m³ (loose)
Loose-volume allowance
+1.08 m³ (loose) · 15%, trade convention
Adjusted
8.28 m³ (loose)
Order
8.28 m³ (loose) (no pack size recorded)
Why this quantity?
8.28 m³ (loose)
Rebar CalculatorA mesh-equivalent across the footing's plan — not a bar schedule.
Base
9 x 12 m sticks
Lap-splice allowance
+1 x 12 m stick · 15%, trade convention
Adjusted
10 x 12 m sticks
Order
10 x 12 m sticks, already whole
Why this quantity?
10 x 12 m sticks

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Continuous Footing / Grade Beam Volume13 h (6.5–27)

About 13 person-hours in the rows that carry them, between 6.5 and 27.

Trade by trade

  1. Labourer2 labourers + 1 mason + 1 plant operatorhalf a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

2 rows carry no hours of their own
  • Trench Excavation & Backfill Volume: no rate for its work here yet
  • Rebar: Fixing reinforcement is not rated here: the bar schedule, the shapes and laps it sets, and the inspection before the pour change its time several-fold.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Continuous Footing / Grade Beam Volume13 h (6.5–27)

About 13 person-hours in the rows that carry them, between 6.5 and 27.

Trade by trade

  1. Labourer2 labourers + 1 mason + 1 plant operatorhalf a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

2 rows carry no hours of their own
  • Trench Excavation & Backfill Volume: no rate for its work here yet
  • Rebar: Fixing reinforcement is not rated here: the bar schedule, the shapes and laps it sets, and the inspection before the pour change its time several-fold.

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

A strip footing is two volumes that are not the same number, and conflating them is the classic groundworks error. The dig is what comes out and has to go somewhere — the footing's length by its width by the trench depth, a figure no row here totals — priced by the load, bulked up by a quarter or a third from its in-situ state. The concrete volume is what goes back in, which is the designed footing rather than the hole: dig 200 mm (8 in) wider than the footing for working space and you have not created that much more footing, you have created spoil and a formwork problem. The backfill row is the rest of a hole dug to the footing's width: the trench above the footing, less the wall standing in it. Working space dug wider is fill this row does not count.

The depth is not a quantity decision at all. A footing goes below the depth at which the ground moves — frost heave in a cold climate, seasonal shrinkage in a clay one, and deeper again near a tree that is drinking from the same soil. Nothing on this page knows any of that; the depth you type is an input and the ground is the authority.

The reinforcement row uses the slab calculator across the footing's plan, which gives a mesh-equivalent quantity rather than a bar schedule. A real strip footing is usually longitudinal bars with links, and the two are not interchangeable — read this row as an order of magnitude, and take the schedule from the drawing.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Set out the lines and check the diagonals before anything is dug.
  2. Dig to the depth the ground demands, not to the depth the drawing hoped for.
  3. Inspect the bottom: it must be firm, level and free of loose spoil and water.
  4. Place the reinforcement on spacers so it sits where the design put it, not on the ground.
  5. Pour in one continuous run per elevation where you can; a cold joint in a footing is a plane of weakness.
  6. Cure it, and keep it from drying too fast in heat or freezing in cold.
  7. Backfill round the wall in compacted layers once it is built, not against green masonry.

What this takeoff does not cover

  • The depth the ground actually requires — frost, clay shrinkage, trees and made ground all govern it and none of them is in these figures.
  • The reinforcement schedule. The row here is a mesh-equivalent across the plan, not the longitudinal bars and links a footing is really built from.
  • Formwork, which a trench-poured footing may not need and a stepped or above-ground one certainly does.
  • Muck-away. The dig is an in-situ volume — the footing's length by its width by the trench depth, which no row totals — and what leaves the site is bulked up by a quarter or more.
  • Dewatering, and any ground improvement the inspection turns out to require.

Quote check

Been given a quote for this job?

Paste it into the strip footing quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the strip footing takeoff give for a typical job?
Opened at Footing length 30 m · Footing width 0.6 m · Footing depth 0.3 m · Trench depth 0.9 m · Wall thickness below ground 0.2 m, it orders: Continuous Footing / Grade Beam Volume, 5.67 m³; Trench Excavation & Backfill Volume, 8.28 m³ (loose); Rebar, 10 x 12 m sticks. Opened at Footing length 98 ft · Footing width 2 ft · Footing depth 11.8 in · Trench depth 3 ft · Wall thickness below ground 7.75 in: Continuous Footing / Grade Beam Volume, 7.46 yd³; Trench Excavation & Backfill Volume, 11.4 yd³; Rebar, 19 x 20 ft sticks. Every figure follows the dimensions you give it.
Which calculators does the strip footing takeoff run?
3 calculators, one to a line: Continuous Footing / Grade Beam Volume Calculator, Trench Excavation & Backfill Volume Calculator, Rebar Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the strip footing takeoff leave out?
5 things, each named on this page: The depth the ground actually requires; The reinforcement schedule; Formwork, which a trench-poured footing may not need and a stepped or above-ground one certainly does; Muck-away; Dewatering, and any ground improvement the inspection turns out to require.
Can I check a quote for this job against the takeoff?
Yes. The strip footing quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.