Strip footing planner
Plan a strip footing
Start the footing
Give the footing a length and a depth, and it is drawn here with every figure beside it.
The result: everything the footing needs, in the order of the work.
Quantities only; your own rates; not a structural check.
The footing
Nothing here is required. Each figure appears as soon as it has what it needs.
Length and depth. The width is the third figure and sits on the concrete row, with the reinforcement, because all three come from the same design drawing.
Add a strip footing
The footing's length and its depth: concrete, bars and the trench for a footing whose size is already decided. It is never sized here.
Everything the footing needs
In the order the work is done. No row has a figure yet.
Nothing in this footing is everything the footing needs yet. Choose how a surface is finished, or what else is being done, and its rows appear here.
Assumptions assumed
Everything the figures above rest on that you did not give, and what they are still waiting for.
Nothing is assumed yet: give the footing its measurements to begin.
The canvas draws this plan with its own objects and lists its own quantity rows for them (the build-up you choose there), not this planner's list.
A strip footing is a long beam of concrete in the ground. Give its length along the centre line and its depth, set its width on the concrete row, and the concrete comes back with its sub-base, the forms that hold it and the bars your design calls for, beside the trench that has to be dug for it. What size it must be is the design's, and this page never decides it.
How the planner runs
- Take the footing's length along its centre line, and its depth, from the drawing.
- Give its width and the bars the design calls for on the concrete row.
- Say whether the trench is dug as part of the job, and give how deep it goes.
- Add each run of a footing as a run of its own; corners are counted where the runs meet.
- Save it to your project with the walls that stand on it.
Where the figures come from
Reading for the decisions
Questions
- How wide and deep should my footing be?
- That is set by the soil, the load on it and the frost depth under the local code — a decision for the building department or an engineer. The page counts the materials for a footing someone has already sized.
- Why is the trench deeper than the footing?
- Because the footing sits on firm ground below the frost line, and the trench goes down to that ground. The trench row asks its own depth rather than reusing the footing's.
- Are the bars counted?
- Yes, when the concrete row is set to bars: the longitudinal bars, the links at the spacing given and the laps, all to the bar size your design names. The page never chooses the bars.
- How are the corners of a footing handled?
- Each straight run is a run here. Measure along the centre lines, and where two runs meet the shared corner is in one of them, not both, so the concrete is not counted twice.
When the work is a job rather than a room. Plenty of it never starts from a space — a slab, a roof, a deck, a panel upgrade. Each of those is a job takeoff: give it the few figures that job is described by, and every trade in it comes back together, the way the room does here.