Timber deck takeoff
Boards, footings, fixings and finish for a rectangular deck.
- Measurements in
- 2
- Trades out
- 4
- Calculators
- 4
- Going in
- 4of 4
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
A deck splits cleanly into what you can measure and what has to be designed. The boards, the fixings and the finish all come off the deck's area and its board direction, and those are the quantities this takeoff returns. The frame under them — joist size, span, spacing and how the whole thing is tied to the building — is a structural question that the deck's outline does not answer.
Footings are the item most often under-counted, because the spacing that governs them is set by the frame rather than by the deck's shape. The figure here uses a standard 8 ft (2.4 m) spacing: a beam that cannot span that far needs more footings, a frost line deeper than you assumed makes every hole deeper, and made or soft ground makes each pad larger rather than adding more of them.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Set out and check the diagonals — a deck that is out of square shows on every board.
- Dig and pour the footings, below the local frost depth.
- Frame: beams, joists and, where the deck meets the house, a properly flashed ledger.
- Lay boards, keeping the gaps consistent and the fixings in line.
- Cut the edges together at the end rather than board by board.
- Finish once the timber is dry enough to take it — usually not on the day it is laid.
What this takeoff does not cover
- The frame. Joist and beam sizing, spans and spacing are a structural matter, and how a ledger is fixed and flashed to a building is the detail most likely to cause damage when it fails.
- Balustrade, handrails, steps and stairs — all counted by length and rise, not by deck area.
- Ground preparation, weed membrane, drainage and any retaining below the deck.
- Joist hangers, post bases, bolts and the frame's own fixings; only the board fixings are counted.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Deck length 6 m · Deck width 4 m
Imperial opening
Deck length 19.5 ft · Deck width 13 ft
Quote check
Been given a quote for this job?
Paste it into the timber deck quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Concrete slab
3 tradesConcrete, reinforcement and formwork for a ground slab from one set of dimensions.
Run this takeoffSegmental retaining wall
4 tradesBlocks, levelling pad, drainage stone and reinforcement layers for a block retaining wall.
Run this takeoffBuild a masonry wall
4 tradesUnits, weeps and what holds the wall — anchors for brick veneer, bond beams and rebar for block — plus the movement joints each needs, with the unit choosing which order you get.
Run this takeoff
Frequently asked questions
- What does the timber deck takeoff give for a typical job?
- Opened at Deck length 6 m · Deck width 4 m, it orders: Deck Board, 62 boards; Deck Footing, 10 footings (minimum); Deck Screws, 4 x 300-count boxes; Deck Stain, 11.4 L. Opened at Deck length 19.5 ft · Deck width 13 ft: Deck Board, 62 boards; Deck Footing, 10 footings (minimum); Deck Screws, 3 x 300-count boxes; Deck Stain, 3 gallons. Every figure follows the dimensions you give it.
- Which calculators does the timber deck takeoff run?
- 4 calculators, one to a line: Deck Board Calculator, Deck Footing Calculator, Deck Screws Calculator, Deck Stain Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the timber deck takeoff leave out?
- 4 things, each named on this page: The frame; Balustrade, handrails, steps and stairs; Ground preparation, weed membrane, drainage and any retaining below the deck; Joist hangers, post bases, bolts and the frame's own fixings; only the board fixings are counted.
- Can I check a quote for this job against the takeoff?
- Yes. The timber deck quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.