Job takeoff

Fence run takeoff

Posts, rails, pickets and the concrete for the post holes along a run of fence.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 2Measurements in
  • 3Trades out

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the fence quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

3 of 3 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Fence CalculatorPosts and rails at the default height and spacing; the boards are the picket row below.
Base
14 posts
Allowance
+0 posts · none added
Adjusted
14 posts
Order
14 posts, already whole
Why this quantity?
  1. Base quantity14 postscalculatorFence Calculator v1.0.1, headline
  2. Allowance0 postsworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity14 postsworked outthe base plus the allowance
  4. Order quantity14 postsworked out14 posts, already whole

Resting on

  • Fence length98 ftgivenyour fence length
  • Post Spacing: 8 ft (standard)assumedthe Fence Calculator's default
  • Fence Height: 5-7 ftassumedthe Fence Calculator's default

Change any other figure on the Fence Calculator

14 posts
Fence Picket CalculatorPickets at the default width and gap — the gap is where the count moves.
Base
205 pickets
Reject and breakage allowance
+10 pickets · 5%, trade convention
Adjusted
215 pickets
Order
215 pickets, already whole
Why this quantity?
  1. Base quantity205 picketscalculatorFence Picket Calculator v1.1.0, headline with the reject and breakage allowance at 0%
  2. Reject and breakage allowance10 picketsworked outthe adjusted figure less the base, at 5% (the calculator's working figure, a trade convention)
  3. Adjusted quantity215 picketscalculatorFence Picket Calculator v1.1.0, headline with the reject and breakage allowance at 5%
  4. Order quantity215 picketsworked out215 pickets, already whole

Resting on

  • Fence length98 ftgivenyour fence length
  • Picket Width5.5 inassumedthe Fence Picket Calculator's default
  • Gap Between Pickets0.25 inassumedthe Fence Picket Calculator's default
  • Reject and Breakage Allowance (%)5%assumedthe Fence Picket Calculator's default

The reject and breakage allowance: the calculator's working figure, a trade convention.

Change any other figure on the Fence Picket Calculator

215 pickets
Post Hole Concrete CalculatorConcrete for a hole at every post the fence row counts, at the default diameter and bag size.
Base
0.6657 yd³
Allowance
+0 yd³ · none added
Adjusted
0.6657 yd³
Order
0.6657 yd³ (no pack size recorded)
Why this quantity?
  1. Base quantity0.6657 yd³calculatorPost Hole Concrete Calculator v1.0.1, headline
  2. Allowance0 yd³worked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity0.6657 yd³worked outthe base plus the allowance
  4. Order quantity0.6657 yd³worked out0.6657 yd³ (no pack size recorded)

Resting on

  • Hole diameter11.75 inassumedthe Post Hole Concrete Calculator's default
  • Post hole depth2 ftgivenyour post hole depth
  • Post width4 inassumedthe Post Hole Concrete Calculator's default
  • Fence length98 ftgivenyour fence length
  • Post Spacing: 8 ft (standard)assumedthe Fence Calculator's default
  • Fence Height: 5-7 ftassumedthe Fence Calculator's default
  • Bag size: 20 kg bag (~0.0094 m³ mixed)assumedthe Post Hole Concrete Calculator's default

Change any other figure on the Post Hole Concrete Calculator

0.6657 yd³
Fence CalculatorPosts and rails at the default height and spacing; the boards are the picket row below.
Base
14 posts
Allowance
+0 posts · none added
Adjusted
14 posts
Order
14 posts, already whole
Why this quantity?
14 posts
Fence Picket CalculatorPickets at the default width and gap — the gap is where the count moves.
Base
206 pickets
Reject and breakage allowance
+10 pickets · 5%, trade convention
Adjusted
216 pickets
Order
216 pickets, already whole
Why this quantity?
216 pickets
Post Hole Concrete CalculatorConcrete for a hole at every post the fence row counts, at the default diameter and bag size.
Base
0.5098 m³
Allowance
+0 m³ · none added
Adjusted
0.5098 m³
Order
0.5098 m³ (no pack size recorded)
Why this quantity?
0.5098 m³

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Fence15 h (8.4–35)
  • Fence Picket10 h (6.0–24)

About 26 person-hours in all, between 14 and 59.

Trade by trade

  1. Landscaper1 landscaper + 1 labourer1½ days

About 1½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

1 row carries no hours of its own
  • Post Hole Concrete: counted with Fence

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Fence15 h (8.4–35)
  • Fence Picket11 h (6.0–24)

About 26 person-hours in all, between 14 and 59.

Trade by trade

  1. Landscaper1 landscaper + 1 labourer1½ days

About 1½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

1 row carries no hours of its own
  • Post Hole Concrete: counted with Fence

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

A fence is a post problem with boards attached. Everything expensive about it — the digging, the concrete, the setting out, the labour — follows the post count, and the post count follows the spacing rather than the length: a 30 m (98 ft) run at 2.4 m (8 ft) centres and the same run at 1.8 m (6 ft) centres differ by four posts, four holes and about sixteen 20 kg bags of concrete (nine 80 lb bags), and by nothing at all in boards. The fence row counts the posts, and the concrete row fills a hole for each post that row counts, so the two move together whatever the length or the spacing.

The concrete row is the one that gets underestimated, because a post hole is deeper and wider than people picture. A 600 mm (24 in) hole at 300 mm (12 in) diameter is 42 litres (1.5 ft³) of concrete before you subtract the post, and there is one of them every couple of metres (7 or 8 ft). With a 100 mm (4 in) post in it that is about four 20 kg bags per hole, or a little over two 80 lb bags, and a tall fence in soft ground wants a wider or deeper hole than that.

The picket row is separate from the fence row for a reason: the two answer different questions. The fence calculator gives the structure at a chosen height and spacing; the picket calculator gives the board count for a given picket width and gap, which is where the appearance is decided and where a 10 mm (3/8 in) change in the gap moves the count across the whole run.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Confirm the boundary before you dig. A fence in the wrong place is a fence built twice.
  2. Check for services along the line — a post hole is exactly deep enough to find a cable.
  3. Set the end posts first, string a line between them, and space the intermediates off the line.
  4. Dig each hole to a depth of at least a third of the post's height above ground, deeper in soft ground or high wind.
  5. Set the posts plumb in concrete, crowned so water sheds away from the timber, and let them go off before loading them.
  6. Hang the rails, then the boards, working to a line rather than to the ground — the ground is never level.

What this takeoff does not cover

  • Gates, their posts, hardware and the extra depth a gate post needs.
  • Ground conditions. Rock, made ground and waterlogged clay all change the hole and some of them change the whole design.
  • Wind exposure, which decides post size and embedment on an exposed or tall fence, and which nothing here evaluates.
  • Preservative treatment, post caps, capping rail and the gravel board at the bottom.
  • Removing the fence that is there now.

Quote check

Been given a quote for this job?

Paste it into the fence quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the fence takeoff give for a typical job?
Opened at Fence length 30 m · Post hole depth 0.6 m, it orders: Fence, 14 posts; Fence Picket, 216 pickets; Post Hole Concrete, 0.51 m³. Opened at Fence length 98 ft · Post hole depth 2 ft: Fence, 14 posts; Fence Picket, 215 pickets; Post Hole Concrete, 0.67 yd³. Every figure follows the dimensions you give it.
Which calculators does the fence takeoff run?
3 calculators, one to a line: Fence Calculator, Fence Picket Calculator, Post Hole Concrete Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the fence takeoff leave out?
5 things, each named on this page: Gates, their posts, hardware and the extra depth a gate post needs; Ground conditions; Wind exposure, which decides post size and embedment on an exposed or tall fence, and which nothing here evaluates; Preservative treatment, post caps, capping rail and the gravel board at the bottom; Removing the fence that is there now.
Can I check a quote for this job against the takeoff?
Yes. The fence quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.