A Deck Is Three Drawings Stacked

On paper a deck looks like one rectangle. In the ground it is three separate things: the surface you walk on, the frame that holds the surface up, and the footings the frame stands on. Each is bought differently. Boards and screws go by area, joists by the number that fit across the frame at their spacing, beams and posts by length cut from stock, and the concrete under the posts by volume. A list that treats the deck as one area gets the boards right and everything under them wrong.

The Construction Canvas keeps the three apart by drawing them separately and on the right levels. The surface is a deck outline. The frame is a floor of joists over the same outline, with beams drawn along the lines they run on. The posts and the piers are points, each with its size, placed where the footings go. Once they are on the plan the list reads each in its own way, and moving the outline moves only what depends on it.

The worked example is the raised deck template: 4.8 by 3.6 metres (15 feet 6 inches by 12 feet), 1.2 metres (4 feet) above the garden, fixed to the house along one side. Open it beside this guide and every step below is already drawn there.

Plan of a raised deck attached to a house along one side, with its joists running from the house out to a beam along the outer edge.Plan of a raised deck attached to a house along one side, with its joists running from the house out to a beam along the outer edge.
The raised deck template's deck level: the outline, its joists and the beam. The posts, piers and stair are on the garden level below.

Set Up the Two Levels First

A raised deck needs two levels, because its posts stand on the ground and its boards sit at the door. Add a Garden level at ground height and a Deck level above it at the height from the ground to the top of the boards, measured at the door's threshold rather than guessed. The difference between the two levels is the post height and the stair's rise, so getting it right here saves correcting both later.

Draw the posts and piers on the Garden level and the outline, the joists and the beam on the Deck level. A post drawn on the Garden level takes its height from the gap to the level above unless you type one, and the stair drawn on the Garden level climbing to the Deck level takes its rise from the same gap.

Draw the Outline Against the House

On the Deck level, draw the deck outline with the site tool, starting at a corner on the house side and going round. Where the deck is fixed to the house, answer yes to attached in its properties; that brings the flashing over the ledger, the strip that stops rain getting behind the board fixed to the house. The flashing row asks for the ledger's length, which is the length of the deck's house side, so type it or let the template's figure stand.

In the same properties, answer the railing and stain questions. A deck a step off the ground often has no railing; at 1.2 metres (4 feet) most codes want a guard, and the canvas offers a baluster or a cable railing and counts it from the open edges' length. Stain or sealer is counted over the board area, and composite boards take neither, so answer no if that is what you are laying.

  1. Draw the deck outline on the Deck level, starting on the house side.
  2. Answer yes to attached and give the ledger's length.
  3. Choose the railing, or none, and answer the stain question.
  4. Check that the outline's first side is the one against the house.

Fill it, then add the allowance

Then the Frame: Joists, the Beam, Posts and Piers

Draw a floor outline over the deck outline and give it the joist type. The joists are counted across the frame at their spacing, with the rim joists and the blocking, from the floor joist page; set the joists to span the shorter way, from the ledger out to the beam, which is how most attached decks are framed. The spacing in the type is an example: the board you choose and the load decide the real one, and decking boards often need closer joists on a diagonal pattern.

Along the outer edge draw a beam with the beam tool, from corner to corner. It is listed as a length cut from stock, and its section is the one you type, taken from the drawings or from the deck code's tables; the canvas does not pick it. Under the beam, place a post and a pier at each end and at the middle, or wherever your spacing puts them. Each post is a column of the size you give and each pier a round concrete footing of a diameter and depth you give, so the list adds up the concrete for all of them from the circular pier page.

A free-standing deck has a beam on every side and posts all round; the free-standing deck template shows that layout, with a post wherever the deck footing page would put a footing. Compare the two and you will see why attaching a deck to a sound house halves the footings.

Boards, Gaps and Which Way They Run

The board row is the one most people check first and the one most often wrong by hand, because a deck is rarely an exact number of boards wide. The canvas counts boards over the deck's area at the board width and gap the deck page opens on, and rounds up to whole boards of a stock length. Change either and the count follows; a narrower board or a wider gap moves it more than people expect over a whole deck.

Boards usually run parallel to the house, across the joists, so water runs off along the gaps and the joints between board ends land on a joist. On a deck 4.8 metres (15 feet 6 inches) along the house, that length is longer than many stock boards, so the ends must be joined somewhere; stagger the joints from row to row and plan them on a joist with a second one or a block beside it for the screws. The list counts the boards; the joint pattern is yours to set out.

A diagonal or herringbone pattern looks well and takes more boards for the waste at the edges, and it usually wants the joists closer together because each board spans further between them on the angle. Neither is drawn by the canvas as such: allow for the extra boards and talk to whoever is building it about the joist spacing before the frame goes in, not after.

Composite boards change three rows at once. They take hidden clips instead of face screws, need no stain, and often a closer joist spacing than timber. Answer the stain question no, and note the clip system for the supplier.

A Stair Down to the Garden

Draw the stair on the Garden level, from where its foot lands on the lawn to the deck's outer edge, and set it to climb to the Deck level. Give it its width. The list gives the stringer length for that rise from the stair page; the treads and the risers are cut to suit the stringers you buy, and a handrail follows the stair's slope.

The landing at the foot matters more than people expect. A stair that lands on soft lawn sinks at one side within a season, so plan a small pad or a paver at the bottom; the paver patio template counts that kind of surface if you draw it as an outline on the Garden level.

Reading the List, and Trying a Change

The list now has rows in four sections. Foundation holds the pier concrete. Floors holds the joists. Structure holds the beam and the posts as lengths. Site holds the boards, the screws, the stain, the railing and the ledger flashing. The counts underneath say how many posts, piers and beams were drawn, each with its size, which is the cutting list a builder wants.

Then try what the drawing is best at: a change. Drag the outer edge out by half a metre and watch the boards, screws and stain grow while the post count stays the same. Drop the Deck level to 0.6 metres (2 feet) and remove the railing, and the posts shorten and the stair loses steps. Switch the railing to cable and the baluster row gives way to a length of cable. Each of those takes seconds, and each would take a page of arithmetic by hand.

When it is right, send the list to My Project to keep the drawing and the quantities together, or download the drawing as a file to send to whoever is building it.

What Someone Else Signs Off

A deck that someone falls from, or one that pulls off the house, is a serious failure, and the parts that prevent it are design decisions. The ledger's fixings into the house's rim, the joist and beam sizes for the spans, the post sizes and bracing, the pier diameter and depth for your soil and frost line, and the guard height and baluster gap all come from your local code or a designer, and a deck this high usually needs a permit and an inspection. The canvas draws whatever sizes you give it and counts them; it never says they are enough.

Try the calculation

Open the deck's own pages

Each row of the deck's list comes from one of these. Check the boards and footings for your own outline.

  • Decking boards — Boards for the deck's area at your board width and gap.
  • Footings — How many footings an outline needs at a spacing.
  • Pier concrete — Concrete for a round pier of a diameter and depth.
  • Ledger flashing — Flashing for the ledger's length, past both ends.
  • Balusters — Balusters for a railing's length at a gap.
Open this as a workspace →

Opens the calculators above on one screen with the dimensions from this article already filled in. Quantities only — this site publishes no price list, because local prices vary too much to publish honestly.

Drawn from

  • International Residential Code 2021, Section R507, Exterior Decks
  • American Wood Council, DCA 6 — Prescriptive Residential Wood Deck Construction Guide (2015)

Guidance, not a specification. Local codes, the engineer of record and the product manufacturer’s instructions govern where they differ from anything written here.