Renovation & Construction

Deck Footing Calculator

Estimate the minimum number of footings needed around a deck's perimeter based on standard spacing.

  • Answers as you type
  • Every formula cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
The length of the deck.

Measure the outer edge of the deck framing.

The width of the deck.

Measure perpendicular to the length.

The maximum spacing between footings along the beam line.

Check your local building code's span tables — beam size, joist species, and snow/live load requirements all affect the maximum allowed spacing.

Minimum footings needed

8 footings (minimum)

Medium confidence

Footing count and placement are structural and code-critical — this is a rough planning estimate only. Always verify final footing count, size, and depth (including frost depth) against your local building code or a structural engineer before digging.

Perimeter beam length
49 linear ft
Footings along each long side
3 footings
Footings along each short side
3 footings
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Footings per side = ceil(side length / spacing) + 1, summed over four sides less the four corners counted twice; 6-8 ft spacing is a commonly used residential deck framing guideline, though actual spacing depends on joist/beam size and species per local span tables

Inputs used

Deck Length
13 ft
Deck Width
11.5 ft
Footing Spacing
8 ft — typical residential

Intermediate steps

Perimeter beam length
49 linear ft
Footings along each long side
3 footings
Footings along each short side
3 footings
Final result8 footings (minimum)

Confidence note: Footing count and placement are structural and code-critical — this is a rough planning estimate only. Always verify final footing count, size, and depth (including frost depth) against your local building code or a structural engineer before digging.

What this calculation does not cover

  • COUNTS FOOTINGS ALONG A PERIMETER, and says nothing about how big each one has to be. Footing SIZE comes from the load each post carries — its tributary area of deck, plus live load — divided by the soil's bearing capacity, and a deck on soft ground needs the same number of much larger pads.
  • Spacing is driven by the BEAM, not by the perimeter: how far a beam can span between posts depends on its size, species and grade and on how much deck it carries, and that span is what should set the spacing entered above rather than a habit.
  • Frost depth governs how deep every one of them goes, and it is a local figure. A footing at the right size and the wrong depth lifts the deck every winter and drops it every spring.
  • Assumes a rectangular deck supported around its perimeter. A deck ledgered to the house carries much of its load on that ledger and needs fewer footings on that side but a correctly flashed and bolted ledger instead — which is the connection that fails most often on a deck.
  • Stairs, cantilevers, hot tubs and any point load need their own footings sized for what they carry, and none of them are in this count.
5 ft1 m13 ft3.96 m11.5 ft3.51 m8 ft2.44 m5 ft1.52 m

Part of bigger jobs

This trade is one line of a job takeoff. Run the whole job and every other trade comes back with it, off the same measurements.

Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1

Regulatory standards & verification citations1
  1. Footings per side = ceil(side length / spacing) + 1, summed over four sides less the four corners counted twice; 6-8 ft spacing is a commonly used residential deck framing guideline, though actual spacing depends on joist/beam size and species per local span tables
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To frame joists and a deck, place and finish concrete, erect formwork, fix reinforcement and excavate by hand. Generic types, no brands, no prices.

Protection this work requires

  • Hardwood dust is a recognised carcinogen: extract at the tool and wear a P2/N95 respirator when cutting or sanding indoors.
  • Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
  • Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
  • Nailing, chiselling and cutting all throw fragments: glasses to EN 166 or ANSI Z87.1, and goggles rather than glasses overhead.
  • Digging blind strikes gas, water and power every day: get the plans, scan with a cable avoidance tool, and hand-dig trial holes over anything you find.
Show the 17 tools this job needs

Essential

  • Bull float and edger

  • Cable and pipe detector

  • Circular saw

  • Claw hammer

  • Cordless drill/driver

  • Screed bar or rail

  • Shovel and spade

  • Spirit level

  • String line and pins

  • Tape measure

  • Wheelbarrow

Recommended

  • Impact driver

  • Plate compactor

  • Rebar cutter and bender

  • Rebar tying tool

Optional

  • Angle grinder

  • Power float

Also needed as materials: circular saw blades, cutting and diamond discs, drill and driver bits, impact driver bits, tie wire.

what each carpentry tool is for and what each concrete tool is for and what each groundwork tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Worked example: Attached deck — step 4 of 11

The data behind it: Production rates by operation

How to calculate deck footing in 4 steps

  1. Deck LengthThe length of the deck.
  2. Deck WidthThe width of the deck.
  3. Footing SpacingThe maximum spacing between footings along the beam line.
  4. Minimum footings neededThe tool computes the minimum footings needed from those figures and shows the formula, its sources, and a confidence rating alongside it.

Minimum footings needed by deck length

Page defaults, not your figures above.

Deck LengthMinimum footings needed (footings (minimum))
10 ft8
15 ft8
20 ft10
25 ft12

Frequently asked questions

Why does this only count perimeter footings?
This estimates footings along the outer beam line, which covers most simple rectangular deck designs. Larger decks, multi-level decks, or decks with a beam down the middle need additional interior footings not captured here.
Is footing spacing the same as joist spacing?
No — joists are typically spaced 12-16 in apart and support the decking boards; footings support the beams underneath the joists and are spaced much farther apart, as this calculator estimates.
Does frost depth affect footing count?
No — frost depth affects how deep each footing must be dug (to below the frost line so the ground doesn't heave it), not how many footings you need. Check your local code for the required depth in your area.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.