Garage conversion takeoff
Turn a garage into a room: the new wall and window across the door opening, the floor raised and insulated over a damp-proof membrane, the old walls lined and insulated, the ceiling, the boarding and the finishes, with the footing and any lintel listed and never sized.
- Measurements in
- 9
- Trades out
- 25
- Calculators
- 19
- Going in
- 25of 25
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Choose the build-up
Each layer changes the materials below; the dimensions stay the same.
Calculators behind the other choices:
Calculators behind the other choices:
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Every trade's quantity · 25 rows
Every trade's quantity · 25 rows
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
Converting a garage is building a small extension inside walls that already stand. The door opening is walled up on a footing of its own, because the slab across it was laid to carry a car rather than a wall; the floor is raised and insulated to meet the house; and walls that were only ever meant to keep rain off a car are lined and insulated to the standard of a room somebody lives in. Most of the quantities are that lining and the new wall.
The new wall is counted the way it is built: the panel under the window across the whole opening, then the piers either side of the window up to the lintel over the old door, which the page takes as staying and carrying the wall above it. A window as wide as the opening leaves no piers, and a wall with no window is a single panel the full height, whatever the cill is set to. The bricks, the blocks, the ties and the cavity insulation all come off that net area, so the window is never bricked and then cut out on paper.
The floor is the decision that changes the job most, and the page counts only what both answers share. Over a damp-proof membrane lapped up to meet the walls' damp course, the floor is either insulation board under a screed or insulation between timber sleepers (battens) under a board deck. The insulation board is counted; the membrane, the screed, the sleepers and the deck are listed as work, because each follows the depth from the old slab up to the house's floor, which is the designer's figure.
The brick and block sizes follow the units. Metric opens on the 215 × 65 mm (about 8 1/2 × 2 1/2 in) brick and the 440 × 215 mm (about 17 3/8 × 8 1/2 in) block a British wall is built in; imperial opens on the US modular sizes the brick and block pages use, a 7 5/8 × 2 1/4 in (194 × 57 mm) brick and the 16 × 8 in block, whose face is 15 5/8 × 7 5/8 in (397 × 194 mm). The British sizes lay about 59 bricks and 10 blocks to the square metre (5.5 and 0.9 to the square foot) against 74 and 12 (6.9 and 1.1) for the US ones, so the build-up below names the size, and either can be chosen whichever units are showing.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Find out whether the conversion needs building control, or a permit, where you are, have the footing and any new lintel set by the designer, and trace the buried services before digging across the opening.
- Take out the garage door and its frame, strip what is fixed to the walls, and dig and cast the footing across the opening to the depth and width agreed.
- Build the new wall on its damp-proof course, tied into the piers either side, insulating the cavity as it rises, closing the cavity round the window and setting a lintel where the window needs one.
- Fit the window, then lay the damp-proof membrane over the slab, lapped up to meet the damp courses, and raise and insulate the floor to the house's level.
- Line the old walls with studs, run the first-fix cables and the heating pipe through them, then insulate between the studs and between the ceiling joists, and fix the vapour control layer on the warm side.
- Board the walls and the ceiling, tape and fill or skim, and let the room dry out before the first coat.
- Second fix: sockets, lights and the radiator; hang the door from the house, prime and paint, lay the floor and fit the skirting (baseboard) to it.
- Test the circuits, and have the completion inspection before the room is lived in.
What this takeoff does not cover
- The footing under the new wall and any lintel over its window. Whether each is needed, and its size, are for the designer and building control; both are listed as work with no quantity, and the page sizes neither.
- The brickwork and blockwork from the top of the new footing up to the old slab and the damp-proof course: those courses follow the footing depth the designer sets and are not counted. The brick and block rows start at the old slab.
- Whether the conversion needs planning permission or a permit where you are, including any condition on the house that keeps the garage for parking.
- The screed, or the sleepers (battens) and the board deck, that raise the floor. Each follows the depth from the old slab up to the house's floor, and is listed as work rather than measured.
- A slab lower than the ground outside, where the membrane, the damp courses and the new floor have to be detailed against water coming in; the page takes the slab as dry.
- Moving a gas or electricity meter, or the consumer unit (panel), that sits in the garage.
- The heating design: whether the boiler or heat pump can take another radiator, and the radiator's size, are listed as work and never sized here.
- Fire separation from the house and the way out of the new room, which building control sets for the room's use.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Garage length, inside 5.5 m · Garage width, inside 3 m · Finished floor to ceiling 2.4 m and 6 more of the page's opening figures
Imperial opening
Garage length, inside 18 ft · Garage width, inside 10 ft · Finished floor to ceiling 8 ft and 6 more of the page's opening figures
Quote check
Been given a quote for this job?
Paste it into the garage conversion quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Room fit-out
7 tradesBoard, fill, paint and floor a rectangular room, walls and ceiling, from one set of dimensions.
Run this takeoffStud partition
3 tradesStuds, jointing compound and outlets for a single run of internal partition.
Run this takeoffTile a floor
4 tradesBacker board, the thinset it is bedded in, tile and adhesive for a rectangular floor from one measurement.
Run this takeoff
Frequently asked questions
- What does the garage conversion takeoff give for a typical job?
- Opened at Garage length, inside 5.5 m · Garage width, inside 3 m · Finished floor to ceiling 2.4 m · Garage door opening, width 2.4 m · Garage door opening, height 2.1 m · Window in the new wall, width 1.2 m · Wall under the window 1.05 m · Old walls to line and insulate 8.5 m · Doors into the room 1, it orders: Inner leaf blocks, under the window, 27 blocks; Inner leaf blocks, beside the window, 14 blocks; Facing bricks, under the window, 165 bricks; Facing bricks, beside the window, 83 bricks; Wall ties across the cavity, 16 ties; Weep holes along the base, 5 weep holes; Cavity insulation in the new wall, 2 sheets (2400x1200 mm); Flashing tape round the window, 6.93 m; Floor insulation board, 7 sheets (2400x1200 mm); Studs lining the old walls, 25 studs; Insulation between the lining studs, 3 packages; Insulation between the ceiling joists, 2 packages; Sockets (outlets) round the room, 5 outlets (minimum); Plasterboard (drywall) on the walls, 15 sheets (2400x1200 mm); Plasterboard (drywall) on the ceiling, 7 sheets; Joint compound, 35.8 kg; Mist coat or primer on the walls, 3.74 L; Mist coat or primer on the ceiling, 1.65 L; Wall paint, 7.49 L; Ceiling paint, 3.3 L; Underlay, 2 rolls; Laminate or vinyl plank, 9 packs; Threshold strips, 0.95 m; Skirting (baseboard), 17.7 m; Skip (dumpster) for the strip-out and the footing, 2.48 m³. Opened at Garage length, inside 18 ft · Garage width, inside 10 ft · Finished floor to ceiling 8 ft · Garage door opening, width 8 ft · Garage door opening, height 7 ft · Window in the new wall, width 4 ft · Wall under the window 3.5 ft · Old walls to line and insulate 28 ft · Doors into the room 1: Inner leaf blocks, under the window, 34 blocks; Inner leaf blocks, beside the window, 17 blocks; Facing bricks, under the window, 212 bricks; Facing bricks, beside the window, 106 bricks; Wall ties across the cavity, 16 ties; Weep holes along the base, 5 weep holes; Cavity insulation in the new wall, 2 sheets (4x8 ft); Flashing tape round the window, 23.1 ft; Floor insulation board, 7 sheets (4x8 ft); Studs lining the old walls, 25 studs; Insulation between the lining studs, 3 packages; Insulation between the ceiling joists, 2 packages; Sockets (outlets) round the room, 5 outlets (minimum); Plasterboard (drywall) on the walls, 15 sheets (4x8 ft); Plasterboard (drywall) on the ceiling, 7 sheets; Joint compound, 2 x 4.5 gal boxes; Mist coat or primer on the walls, 1.03 gal; Mist coat or primer on the ceiling, 0.45 gal; Wall paint, 2.06 gal; Ceiling paint, 0.9 gal; Underlay, 2 rolls; Laminate or vinyl plank, 9 packs; Threshold strips, 3.15 ft; Skirting (baseboard), 58.4 linear ft; Skip (dumpster) for the strip-out and the footing, 3.28 yd³. Every figure follows the dimensions you give it.
- Which calculators does the garage conversion takeoff run?
- 19 calculators, for 25 lines: Concrete CMU Block Counter & Grout Infill Calculator, Brick Calculator, Brick Veneer Wall Tie Density Calculator, Cavity Wall Weep Hole Spacing Calculator, Foam Board Insulation Calculator, Window Opening Flashing Membrane Calculator, Framing Stud Calculator, Insulation Batt Calculator, Outlet Spacing Calculator, Drywall Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Paint Calculator, Ceiling Paint Calculator, Laminate/Vinyl Plank Floor Underlayment Roll Calculator, LVP, Laminate & Engineered Floor Calculator, Floor Transition Strip Calculator, Baseboard & Trim Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the garage conversion takeoff leave out?
- 8 things, each named on this page: The footing under the new wall and any lintel over its window; The brickwork and blockwork from the top of the new footing up to the old slab and the damp-proof course; Whether the conversion needs planning permission or a permit where you are, including any condition on the house that keeps the garage for parking; The screed, or the sleepers (battens) and the board deck, that raise the floor; A slab lower than the ground outside, where the membrane, the damp courses and the new floor have to be detailed against water coming in; the page takes the slab as dry; Moving a gas or electricity meter, or the consumer unit (panel), that sits in the garage; The heating design; Fire separation from the house and the way out of the new room, which building control sets for the room's use.
- Can I check a quote for this job against the takeoff?
- Yes. The garage conversion quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.