Room fit-out takeoff

Board, fill, paint and floor a rectangular room, walls and ceiling, from one set of dimensions.

Measurements in
5
Trades out
7
Calculators
7
Going in
7of 7
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 7 rows

7 of 7 going in
ItemQuantityOrderWaste / allowance
Drywall15 sheets (4x8 ft)15 sheets (4x8 ft)already whole10%
Ceiling Plasterboard (Gypsum Board Sheets)8 sheets8 sheetsalready whole10%
Drywall Joint Compound2 x 4.5 gal boxes2 x 4.5 gal boxesalready whole10%
Paint2.18 gal2.18 galno pack size recordednone
Ceiling Paint1.07 gal1.07 galno pack size recordednone
Flooring231.66 sq ft231.66 sq ftno pack size recorded8%
Baseboard & Trim61.65 linear ft61.65 linear ftno pack size recorded10%

Every trade's quantity · 7 rows

7 of 7 going in
ItemQuantityOrderWaste / allowance
Drywall16 sheets (2400x1200 mm)16 sheets (2400x1200 mm)already whole10%
Ceiling Plasterboard (Gypsum Board Sheets)8 sheets8 sheetsalready whole10%
Drywall Joint Compound39.67 kg39.67 kgno pack size recorded10%
Paint7.97 L7.97 Lno pack size recordednone
Ceiling Paint4 L4 Lno pack size recordednone
Flooring21.6 m²21.6 m²no pack size recorded8%
Baseboard & Trim18.81 m18.81 mno pack size recorded10%

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

7 of 7 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A fit-out is the sequence that turns a framed shell into a finished room, and almost all of it is surface area: the walls and the ceiling each decide their own board and paint, the board decides the compound, the footprint decides the floor and the perimeter decides the trim. One room measurement drives every one of them, which is why typing it into each calculator in turn is both slow and the most common way a fit-out estimate goes wrong.

Openings are the part people leave out. A door and a window are not just holes in the paint — they take board, compound and paint away, a door takes skirting away too, and both add linings and cutting waste. The count matters more in a small room than a large one, because a single door is a larger fraction of a 3 m (10 ft) wall than of a 6 m (20 ft) one.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. First fix is complete and signed off — once the board is on, anything behind it costs a hole.
  2. Board the ceiling first, then the walls, so the wall sheets support the ceiling edge.
  3. Tape, fill and sand; this is the step that decides how the paint looks.
  4. Mist coat new board before the first full coat, or the paint will not key.
  5. Floor after the walls are painted, so nothing drips on it.
  6. Trim last, scribed to the finished floor.

What this takeoff does not cover

  • Everything behind the board: framing, insulation, electrical and plumbing first fix, and any acoustic or fire-rated build-up.
  • The doors, frames, linings and window boards themselves — only the trim run around the room is counted.
  • Floor preparation. Levelling compound, adhesive and underlay depend on the substrate and the covering, and neither is measured from the room's dimensions alone.
  • Screws and joint tape for the ceiling, and corner bead anywhere. The wall board row works out its own screws and tape; the ceiling row counts sheets only.
  • Labour, plant, waste disposal and access.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Room length 5 m · Room width 4 m · Wall height 2.4 m and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Drywaller1 drywaller + 1 labourer7.7 h (4.3–14)half a day
Taper1 taper + 1 labourer9.6 h (5.4–19)half a day
Painter1 painter11 h (6.0–24)1½ days
Carpenter1 carpenter3.4 h (1.9–7.5)half a day
In all31 h (18–65)3 days

Imperial opening

Room length 16.5 ft · Room width 13 ft · Wall height 8 ft and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Drywaller1 drywaller + 1 labourer7.4 h (4.1–14)half a day
Taper1 taper + 1 labourer9.7 h (5.4–19)half a day
Painter1 painter11 h (6.0–24)1½ days
Carpenter1 carpenter3.4 h (1.9–7.5)half a day
In all31 h (18–65)3 days

Quote check

Been given a quote for this job?

Paste it into the room fit-out quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the room fit-out takeoff give for a typical job?
Opened at Room length 5 m · Room width 4 m · Wall height 2.4 m · Doors 1 · Windows 1, it orders: Drywall, 16 sheets (2400x1200 mm); Ceiling Plasterboard (Gypsum Board Sheets), 8 sheets; Drywall Joint Compound, 39.7 kg; Paint, 7.97 L; Ceiling Paint, 4 L; Flooring, 21.6 m²; Baseboard & Trim, 18.8 m. Opened at Room length 16.5 ft · Room width 13 ft · Wall height 8 ft · Doors 1 · Windows 1: Drywall, 15 sheets (4x8 ft); Ceiling Plasterboard (Gypsum Board Sheets), 8 sheets; Drywall Joint Compound, 2 x 4.5 gal boxes; Paint, 2.18 gal; Ceiling Paint, 1.07 gal; Flooring, 232 sq ft; Baseboard & Trim, 61.7 linear ft. Every figure follows the dimensions you give it.
Which calculators does the room fit-out takeoff run?
7 calculators, one to a line: Drywall Calculator, Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Joint Compound Calculator, Paint Calculator, Ceiling Paint Calculator, Flooring Calculator, Baseboard & Trim Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the room fit-out takeoff leave out?
5 things, each named on this page: Everything behind the board; The doors, frames, linings and window boards themselves; Floor preparation; Screws and joint tape for the ceiling, and corner bead anywhere; Labour, plant, waste disposal and access.
Can I check a quote for this job against the takeoff?
Yes. The room fit-out quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.