Plaster a room takeoff

Plaster, beads and protection for a room, with the background choosing between a skim and a float and set.

Measurements in
5
Trades out
4
Calculators
4
Going in
4of 4
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Background

Calculators behind the other choices:

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Plaster Angle and Stop Bead8 lengths8 lengthsalready wholenone
Masking and Protection Materials3 items3 itemsno pack size recordednone
Skim Coat Plaster404.24 lb404.24 lbno pack size recorded15%
Drywall Joint Tape387.81 ft387.81 ftno pack size recorded10%

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Plaster Angle and Stop Bead8 lengths8 lengthsalready wholenone
Masking and Protection Materials4 items4 itemsno pack size recordednone
Skim Coat Plaster181.7 kg181.7 kgno pack size recorded15%
Drywall Joint Tape117.26 m117.26 mno pack size recorded10%

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

4 of 4 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Plastering is a room-sized job with a bag-sized order, and the two are joined by one number nobody measures: the finished thickness. A skim over flat board is about 2 mm (1/16 in) and a wall being brought level is more, sometimes much more, so the same room can be six bags or nine. String a line along the worst wall before ordering rather than after.

The background is the choice that matters most here, which is why it is the variant rather than a setting. Plasterboard takes a skim — one finish plaster, laid in two passes. Masonry takes a float and set — a lightweight undercoat around 11 mm (7/16 in) and a dense finish over it, which together weigh four to five times what a skim does. They are different products bought in different quantities, and mixing them up is the commonest way a plastering order comes out wrong.

The beads are the line most often left out. Every external corner takes an angle bead and every edge where the plaster simply stops takes a stop bead, and because a bead cannot be joined mid-run each one consumes a whole stock length. A room with more openings than corners — which is most rooms — needs more stop bead than angle bead.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Protect the floor and mask anything that is staying. Plaster travels further than it looks.
  2. Check the background: boards fixed and dry, masonry brushed off, suction controlled with the right primer for what is underneath.
  3. Scrim every board joint, and every internal angle with board on at least one side, before any plaster goes on.
  4. Fix the beads plumb and to a line — the plaster is worked to them, so anything out here is out everywhere.
  5. Lay the coat, let it pick up, then flatten and close it in its own time rather than yours.
  6. Leave it to dry right through before anything is applied over it.

What this takeoff does not cover

  • The decoration. New plaster wants a thinned mist coat before anything else, which is its own page and its own arithmetic — the water in it is free and the paint is not.
  • Boarding out. If the walls are not yet boarded, that is a drywall takeoff and this one starts after it.
  • Preparation the background needs: bonding agents, stabilising primers and the removal of anything the plaster will not stick to. None of those are a function of the room's size.
  • Ceilings on a masonry job. A masonry room is floated and set on the walls and skimmed on the ceiling, which is why both plaster rows appear on that variant — but a lath or beam ceiling is neither and is not covered.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Room length 5 m · Room width 4 m · Wall height 2.4 m and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer0.8 h (0.4–1.6)under a quarter of a day
Plasterer1 plasterer11 h (6.3–22)1½ days
In all12 h (6.7–24)1½ days

Imperial opening

Room length 16.5 ft · Room width 13 ft · Wall height 8 ft and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer0.8 h (0.4–1.6)under a quarter of a day
Plasterer1 plasterer11 h (6.4–22)1½ days
In all12 h (6.8–24)1½ days

Quote check

Been given a quote for this job?

Paste it into the room plastering quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the room plastering takeoff give for a typical job?
Opened at Room length 5 m · Room width 4 m · Wall height 2.4 m · External corners 2 · Stop bead runs 6, it orders: Plaster Angle and Stop Bead, 8 lengths; Masking and Protection Materials, 4 items; Skim Coat Plaster, 182 kg; Drywall Joint Tape, 117 m. Opened at Room length 16.5 ft · Room width 13 ft · Wall height 8 ft · External corners 2 · Stop bead runs 6: Plaster Angle and Stop Bead, 8 lengths; Masking and Protection Materials, 3 items; Skim Coat Plaster, 404 lb; Drywall Joint Tape, 388 ft. Every figure follows the dimensions you give it.
Which calculators does the room plastering takeoff run?
4 calculators, one to a line: Plaster Angle and Stop Bead Calculator, Masking and Protection Materials Calculator, Skim Coat Plaster Calculator, Drywall Joint Tape Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the room plastering takeoff leave out?
4 things, each named on this page: The decoration; Boarding out; Preparation the background needs; Ceilings on a masonry job.
Can I check a quote for this job against the takeoff?
Yes. The room plastering quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.