Each external corner takes one angle bead, full height.
Count the corners that stick out into the room: a chimney breast is two, a window reveal returning into the room is two more, and a partition ending mid-room is one. Internal corners take no bead — they are made with scrim and the plaster itself.
Usually floor to ceiling.
Measure the longest of them rather than the average. A bead ordered for a 2.4 m corner will not reach a 2.6 m one, and the difference between the two is a return trip.
Every edge where the plaster stops rather than turning a corner.
Door linings take one run each side, window reveals one at each edge of the frame, and any junction with a finish that is not plaster takes one. This is usually the larger of the two counts, which is the part people under-order: most rooms have more edges than external corners.
A door jamb is about a door's height; a reveal is its own size.
Where the runs differ a lot — a 2.1 m door jamb beside a 0.6 m window head — work the two groups separately and add the answers, because the whole point of this page is that a long stock length spent on a short run is mostly waste.
The length beads are sold in, which decides how much is wasted.
This is the figure that decides how much is wasted. A 3 m bead on a 2.4 m corner wastes 600 mm and nothing else can use it; a 2.5 m bead on the same corner wastes 100 mm. Where both are stocked, the shorter one is often cheaper per corner even at a higher price per metre.
Bead lengths to order
10 lengths
4 angle and 6 stop. 26% of what you buy is offcut at this stock length — try a shorter stock if one is available.
- Angle bead lengths
- 4 lengths
- Stop bead lengths
- 6 lengths
- Offcut, as a share of what is bought
- 26 %
- Bead actually run
- 74 ft
- Bead bought
- 100 ft
They open the calculator with your figures already in it
Plaster Angle and Stop Bead Calculator: 10 lengths — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- A bead runs the full height or width of its corner in one piece, so each run consumes a whole stock length: the count is runs divided by the runs a length yields, rounded up
- Angle bead forms an external corner and stop bead forms an edge where plaster ends — different sections, ordered separately
- Offcut is the stock length times the count, less the length actually run — a real figure rather than an assumed percentage
Inputs used
- External corners
- 4
- Length of one external corner
- 8 ft
- Stop bead runs
- 6
- Length of one stop bead run
- 7 ft
- Stock length
- 10 ft
Intermediate steps
- Angle bead lengths
- 4 lengths
- Stop bead lengths
- 6 lengths
- Offcut, as a share of what is bought
- 26 %
- Bead actually run
- 74 ft
- Bead bought
- 100 ft
Confidence note: 4 angle and 6 stop. 26% of what you buy is offcut at this stock length — try a shorter stock if one is available.
What this calculation does not cover
- Angle bead and stop bead are different products at different prices. The headline is how many lengths to order in total; the breakdown is what to order, and the two cannot be swapped.
- A run is assumed to be made in one piece. Where a stock length is shorter than the run it has to cross, the count falls back to several lengths per run — but a jointed bead shows as a line through the finished plaster, and the right answer there is longer stock rather than more of the short.
- Offcut from one run is not carried to another. The piece left over from a full-height corner could in principle serve a short window head, and a careful plasterer will use it; this page does not assume that, because the offcuts and the short runs rarely match.
- Beads are fixed before plastering, with dabs of plaster, bead adhesive or fixings depending on the background. None of that fixing material is counted here, nor are the corner and stop bead's plastic or stainless alternatives, which are chosen for damp or external work rather than by quantity.
- External render beads — bellcast, movement and render stop — are a different family with their own sections and are not what this counts.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of bigger jobs
This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.
also measuresMasking and Protection MaterialsSkim Coat PlasterDrywall Joint Tape
also measuresMasking and Protection MaterialsBrickWindow Opening Flashing MembraneFloat and Set PlasterPaintSkip & Dumpster Size
also measures10 other trades
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-23 · v1.0.0
Regulatory standards & verification citations3
- A bead runs the full height or width of its corner in one piece, so each run consumes a whole stock length: the count is runs divided by the runs a length yields, rounded up
- Angle bead forms an external corner and stop bead forms an edge where plaster ends — different sections, ordered separately
- Offcut is the stock length times the count, less the length actually run — a real figure rather than an assumed percentage
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To skim a plaster finish. Generic types, no brands, no prices.
Protection this work requires
- Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
- Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
Show the 4 tools this job needsHide tools
Essential
Mixing bucket or tub
Paddle mixer
Plastering trowel and hawk
Recommended
Step ladder
what each plastering tool is for, and the spec that decides which to buy where one does.