New window or door opening in an outside wall takeoff

Cut a new window or door into an existing brick, block or cavity wall: the props and the lintel listed and never sized, the cavity closed and the tray and DPCs built in, the frame flashed, the brick or render made good outside, the reveals plastered inside, the room redecorated, and the rubble.

Measurements in
10
Trades out
8
Calculators
7
Going in
8of 8
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 3

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Opening
Outside face
Brick size
Opening
Outside face
Brick size

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 8 rows

8 of 8 going in
ItemQuantityOrderWaste / allowance
Dust sheets (drop cloths) and tape in the room3 items3 itemsno pack size recordednone
Facing bricks to tooth in the jambs44 bricks44 bricksalready whole10%
Flashing tape round the frame24.2 ft24.2 ftno pack size recorded10%
Angle (corner) bead up the jambs1 length1 lengthalready wholenone
Angle (corner) bead along the head1 length1 lengthalready wholenone
Plaster on the reveals and the band round them43.89 lb43.89 lbno pack size recorded15%
Wall paint for the room1.71 gal1.71 galno pack size recordednone
Skip (dumpster) for the broken-out wall0.8704 yd³0.8704 yd³no pack size recordednone

Every trade's quantity · 8 rows

8 of 8 going in
ItemQuantityOrderWaste / allowance
Dust sheets (drop cloths) and tape in the room3 items3 itemsno pack size recordednone
Facing bricks to tooth in the jambs36 bricks36 bricksalready whole10%
Flashing tape round the frame7.26 m7.26 mno pack size recorded10%
Angle (corner) bead up the jambs1 length1 lengthalready wholenone
Angle (corner) bead along the head1 length1 lengthalready wholenone
Plaster on the reveals and the band round them19.78 kg19.78 kgno pack size recorded15%
Wall paint for the room6.25 L6.25 Lno pack size recordednone
Skip (dumpster) for the broken-out wall0.648 m³0.648 m³no pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

8 of 8 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A new window or door in an outside wall starts at the top of the hole, not the bottom. Before a brick comes out, the wall above is held on props and needles (temporary shoring) threaded through it, and the lintel that will carry the wall for good (a header, in North America) is bedded on its bearings while the props are still in. The lintel, its bearings and any padstones are chosen by the designer or read from the lintel maker's load tables for what stands above; this page lists each one as an item and sizes none of them.

A cavity wall is three layers at the new jambs: the outer leaf, the cavity and the inner leaf. The cavity is shut round the jambs and sill with insulated closers; a cavity tray with stop ends and weep vents goes in over the lintel to turn water out; and damp-proof courses (DPCs) go at each jamb and under the sill (cill), so rain that crosses the cavity is sent back out rather than into the reveal. The tray is counted with that DPC work, not again with the lintel, which on this job is the lintel alone. A solid wall has no cavity to close, but its jambs and sill still take a DPC.

Most of what is measured is the making good. Outside, facing brick is toothed in at each jamb, whole and cut bricks bonded into the old courses, or the render (stucco) is patched round the new reveals. Inside, the reveals round the jambs and head and a band of wall round the opening take a backing and a finish coat of plaster, beaded (corner bead) at the arrises, and the room is repainted wall to wall so the patch does not show. A door adds an architrave (casing) round it inside, a threshold, the floor made up across the wall's thickness and, where the floor sits above the ground outside, a step.

The brick sizes follow the units: metric opens on the 215 × 65 mm (about 8 1/2 × 2 1/2 in) brick a British wall is built in, imperial on the US modular 7 5/8 × 2 1/4 in (194 × 57 mm) brick, and either can be chosen in either system. Matching the old bricks' colour and size matters more here than anywhere, because the new ones sit beside the old at every jamb.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Settle the opening's position and size, have the lintel and any padstones chosen by the designer or from the maker's tables, give building control notice or take out the permit, and trace the cables and pipes in the wall before marking it out.
  2. Sheet the room, isolate and reroute any services in the way, and set the props and needles through the wall above the head, standing on spreaders on a floor that can carry them.
  3. Cut the slot for the lintel first and bed it level on its bearings, with the cavity tray, stop ends and weeps over it, and leave the mortar to take up before the props are eased.
  4. Break out the opening below the lintel from the top down and cut the jambs back to a straight line; until the frame is in, board and lock the hole at the end of every day, against the weather and against anyone getting in.
  5. Close the cavity at the jambs and sill, build in the DPCs, tooth in the facing brick or patch the render outside, and bed the sill (cill) or the threshold; have building control see the lintel, its bearings and the tray before the reveals close them in.
  6. Fit the frame on packers, fix it back to the wall and seal it to the closers and the DPC; for a door, cast any step outside once the threshold's height is fixed, and make up the floor inside across the wall.
  7. Plaster the reveals and the band round the opening, fit the window board (stool) or the architrave once the plaster is dry, and decorate the room.
  8. Test any circuit that was rerouted, clear the rubble and the dust, and snag the reveals and the frame's seals before handing over.

What this takeoff does not cover

  • The steel or concrete lintel (header), its bearings, any padstones, and the props (Acrows) and needles (strongboys) that hold the wall while it is cut. Each is listed as work with no quantity; the lintel's size and type come from the designer or the lintel maker's load tables, and the page sizes none of them.
  • A count of the cavity closers, the cavity tray with its stop ends and weeps over the lintel, and the DPCs at the jambs and under the sill. Each is listed as work, bought to the opening's own size, and none is measured here.
  • The window or door unit itself: its size, glazing, ironmongery (hardware), and how it performs for heat and security.
  • A level (step-free) threshold's drainage and the access design round it, and the rise, going and landing of any step outside, which the regulations or code set (Approved Documents K and M in England, IRC R311.3 in the US). The step row is concrete for one step at its page's opening riser and going.
  • Planning permission or a permit for the change to the elevation, and any listed building or conservation area consent.
  • Wall ties or cavity repairs beyond the new jambs, and brickwork found loose or cracked round the opening beyond the band made good.
  • Services beyond rerouting them round the opening: a new circuit, a new pipe run, or a radiator moved to another wall.
  • Painting the outside: masonry paint on a rendered wall, and matching an old render's texture and colour.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Opening width 1.2 m · Opening height 1.2 m · Wall thickness 300 mm and 7 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer1.2 h (0.6–3.1)under a quarter of a day
Mason1 mason + 1 labourer1.2 h (0.8–2.5)under a quarter of a day
Glazier2 glaziers4.0 h (1.0–8.0)half a day
Plasterer1 plasterer0.2 h (0.1–0.5)under a quarter of a day
Painter1 painter5.6 h (3.1–13)half a day
In all12 h (5.7–27)1 day

Imperial opening

Opening width 4 ft · Opening height 4 ft · Wall thickness 11.8 in and 7 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer1.2 h (0.6–3.1)under a quarter of a day
Mason1 mason + 1 labourer1.5 h (1.0–3.1)under a quarter of a day
Glazier2 glaziers4.0 h (1.0–8.0)half a day
Plasterer1 plasterer0.2 h (0.1–0.5)under a quarter of a day
Painter1 painter5.7 h (3.2–13)half a day
In all13 h (5.9–27)1 day

Quote check

Been given a quote for this job?

Paste it into the new window or door opening quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the new window or door opening takeoff give for a typical job?
Opened at Opening width 1.2 m · Opening height 1.2 m · Wall thickness 300 mm · Inside reveal depth 150 mm · Band made good round the opening 225 mm · Room length 4 m · Room width 3.5 m · Floor to ceiling 2.4 m · Doors in the room, the new one included 1 · Windows in the room, the new one included 2, it orders: Dust sheets (drop cloths) and tape in the room, 3 items; Facing bricks to tooth in the jambs, 36 bricks; Flashing tape round the frame, 7.26 m; Angle (corner) bead up the jambs, 1 length; Angle (corner) bead along the head, 1 length; Plaster on the reveals and the band round them, 19.8 kg; Wall paint for the room, 6.25 L; Skip (dumpster) for the broken-out wall, 0.65 m³. Opened at Opening width 4 ft · Opening height 4 ft · Wall thickness 11.8 in · Inside reveal depth 6 in · Band made good round the opening 8.75 in · Room length 13 ft · Room width 11.5 ft · Floor to ceiling 8 ft · Doors in the room, the new one included 1 · Windows in the room, the new one included 2: Dust sheets (drop cloths) and tape in the room, 3 items; Facing bricks to tooth in the jambs, 44 bricks; Flashing tape round the frame, 24.2 ft; Angle (corner) bead up the jambs, 1 length; Angle (corner) bead along the head, 1 length; Plaster on the reveals and the band round them, 43.9 lb; Wall paint for the room, 1.71 gal; Skip (dumpster) for the broken-out wall, 0.87 yd³. Every figure follows the dimensions you give it.
Which calculators does the new window or door opening takeoff run?
7 calculators, for 8 lines: Masking and Protection Materials Calculator, Brick Calculator, Window Opening Flashing Membrane Calculator, Plaster Angle and Stop Bead Calculator, Float and Set Plaster Calculator, Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the new window or door opening takeoff leave out?
8 things, each named on this page: The steel or concrete lintel (header), its bearings, any padstones, and the props (Acrows) and needles (strongboys) that hold the wall while it is cut; A count of the cavity closers, the cavity tray with its stop ends and weeps over the lintel, and the DPCs at the jambs and under the sill; The window or door unit itself; A level (step-free) threshold's drainage and the access design round it, and the rise, going and landing of any step outside, which the regulations or code set (Approved Documents K and M in England, IRC R311.3 in the US). The step row is concrete for one step at its page's opening riser and going; Planning permission or a permit for the change to the elevation, and any listed building or conservation area consent; Wall ties or cavity repairs beyond the new jambs, and brickwork found loose or cracked round the opening beyond the band made good; Services beyond rerouting them round the opening; Painting the outside.
Can I check a quote for this job against the takeoff?
Yes. The new window or door opening quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.