External wall finish takeoff

Wrap, cladding and finish over a measured wall area.

Measurements in
2
Trades out
3
Calculators
3
Going in
3of 3
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
House Wrap1 roll1 rollalready whole10%
Siding3.27 squares3.27 squaresno pack size recorded10%
Exterior Paint2 gallons2 gallonsno pack size recordednone

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
House Wrap1 roll1 rollalready whole10%
Siding29.7 m²29.7 m²no pack size recorded10%
Exterior Paint7.57 L7.57 Lno pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

3 of 3 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Cladding a wall is a layered job where each layer is measured differently. The weather-resistive barrier goes by area with laps, the cladding goes by the area it has to cover, which the product's exposure then turns into boards or panels, and the finish goes by area again but against a coverage rate that changes with the profile and how absorbent the surface is. One wall measurement feeds all three; the layers between them do not come from it.

Exposure is the thing a wall's dimensions cannot tell you. The same elevation in a sheltered courtyard and on an exposed gable takes different laps, different fixings and often a different finish specification.

The cladding row is the area to be covered, with a cutting allowance, and it does not move with the exposure. Panels sold by stated coverage are divided by the coverage on the box. Boards differ from their face by more than people expect: a lap board 150 mm (6 in) wide laid to a 125 mm (5 in) exposure covers five sixths of what its width suggests, so the run to order is the area divided by the exposure, not by the board — and the exposure is set by the fixing pattern and the manufacturer, not chosen. Change it by a single course to land the courses level at a window head and that run moves with it.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Sheathe and make good, then check the openings are square and the sills fall outward.
  2. Hang the weather-resistive barrier from the top down so every lap sheds water.
  3. Flash the openings and any penetration before the cladding hides them.
  4. Batten where the build-up calls for a drained and ventilated cavity.
  5. Clad from the bottom up, keeping the courses level around the building.
  6. Finish, and keep the first coat within the manufacturer's window after fixing.

What this takeoff does not cover

  • Sheathing, battens and the cavity itself — the build-up is a specification, not a consequence of the wall's size.
  • Flashings, trims, corners, starter strips, soffits and everything around an opening. These follow the building's detail and are where a cladding estimate usually falls short.
  • Insulation, whether in the wall or over it.
  • Openings are not deducted: the area here is the gross elevation, which is the right basis for ordering barrier and finish and an over-estimate for cladding on a heavily glazed wall.
  • Access. Scaffold or a tower is usually the largest single cost on an elevation and does not scale with area.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Wall length 10 m · Wall height 2.7 m

TradeCrewPerson-hoursWorking days
Carpenter1 carpenter + 1 labourer17 h (9.4–35)1 day
Painter1 painter4.9 h (2.7–11)half a day
In all22 h (12–46)1½ days

Imperial opening

Wall length 33 ft · Wall height 9 ft

TradeCrewPerson-hoursWorking days
Carpenter1 carpenter + 1 labourer18 h (9.7–36)1 day
Painter1 painter5.0 h (2.8–11)half a day
In all23 h (12–47)1½ days

Quote check

Been given a quote for this job?

Paste it into the external wall finish quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the external wall finish takeoff give for a typical job?
Opened at Wall length 10 m · Wall height 2.7 m, it orders: House Wrap, 1 roll; Siding, 29.7 m²; Exterior Paint, 7.57 L. Opened at Wall length 33 ft · Wall height 9 ft: House Wrap, 1 roll; Siding, 3.27 squares; Exterior Paint, 2 gallons. Every figure follows the dimensions you give it.
Which calculators does the external wall finish takeoff run?
3 calculators, one to a line: House Wrap Calculator, Siding Calculator, Exterior Paint Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the external wall finish takeoff leave out?
5 things, each named on this page: Sheathing, battens and the cavity itself; Flashings, trims, corners, starter strips, soffits and everything around an opening; Insulation, whether in the wall or over it; Openings are not deducted; Access.
Can I check a quote for this job against the takeoff?
Yes. The external wall finish quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.