Asphalt shingle roof takeoff

Shingles, underlayment, ice-dam membrane, ridge cap and ridge vent from the roof's footprint.

Measurements in
11
Trades out
6
Calculators
6
Going in
6of 6
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 3

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Roof framing

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 6 rows

6 of 6 going in
ItemQuantityOrderWaste / allowance
Roofing Shingle12.47 squares12.47 squaresno pack size recorded10%
Roofing Underlayment1 roll1 rollalready whole10%
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)334.29 sq ft334.29 sq ftno pack size recordednone
Roof Ridge Cap2 bundles2 bundlesalready whole10%
Ridge Vent Linear Footage40.95 ft40.95 ftno pack size recorded5%
Roof trusses20 trusses20 trussesalready wholenone

Every trade's quantity · 6 rows

6 of 6 going in
ItemQuantityOrderWaste / allowance
Roofing Shingle118.06 m²118.06 m²no pack size recorded10%
Roofing Underlayment1 roll1 rollalready whole10%
Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)31.12 m²31.12 m²no pack size recordednone
Roof Ridge Cap2 bundles2 bundlesalready whole10%
Ridge Vent Linear Footage12.6 m12.6 mno pack size recorded5%
Roof trusses20 trusses20 trussesalready wholenone

Also part of this job when you need it: Valley lining — set valleys, along the slope above 0.

Also part of this job when you need it: Valley lining — set valleys, along the slope above 0.

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

6 of 6 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A roof is bigger than the building it sits on, and that is the first thing an estimate has to get right. The footprint here is the roof's outline on plan measured to the drip edge, overhangs included, not the wall line you can tape from the ground; the roof area is that outline multiplied by a slope factor, which at a 6:12 pitch is about 1.12 and at 12:12 is over 1.41. The shingle and ice-dam rows take the pitch you enter and apply the slope themselves. The underlayment row cannot — it takes an area, so the slope factor here must be the one for that same pitch.

The ice-dam row is a climate question wearing a quantity's clothing. Where the winter produces freeze-thaw, the membrane has to reach far enough up the slope to pass the inside face of the exterior wall, which is a depth measured from the eave rather than a percentage of the roof. In a warm climate the row is not needed at all, and the honest thing is to exclude it rather than to order it: set the eaves with ice-dam membrane to 0, rather than unticking the row, and it drops out with the underlayment made whole again.

The ice-dam row also runs along every eave, not one. A gable has two, one down each long side, so the row below takes the footprint length once for each; a hip roof has eaves on all four sides, the whole perimeter, which this gable takeoff does not model. The underlayment starts where the membrane stops, so its row is the sloped area less the membrane strip rather than both over the same eave.

The ridge is two products, and the vent does not replace the cap. A ridge vent goes down first, over a slot cut back from the ridge board; the cap shingles go on last and cover the whole ridge, over the vent where there is one. Choosing a vent adds a line to the order rather than swapping one, and because the slot stops short of the ridge ends, a vent row sized to the full ridge carries a little spare.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Strip to the deck and check it — a re-roof over rot is a re-roof done twice.
  2. Fit the drip edge at the eave, then the ice-dam membrane, then the drip edge at the rake over the top of it.
  3. Lay the underlayment up the slope, lapped so water runs over each joint rather than into it.
  4. Snap the course lines rather than trusting the shingle's own alignment marks.
  5. Cut the ridge slot before capping, and only where the vent will run.
  6. Cap the ridge last, working away from the prevailing wind.

What this takeoff does not cover

  • The deck below, its condition and any repair to it.
  • Hips, step flashing, chimneys, pipe boots and every other penetration — each is a detail rather than an area; valleys only as the lining counted below, when a valley length is entered.
  • Drip edge, starter strip (the shingle row's allowance covers cutting only) and hip and ridge accessories other than the cap counted here.
  • Intake ventilation at the soffit, which a ridge vent needs and without which it can pull air from the house.
  • Tear-off, disposal and whatever the deck turns out to need.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Footprint length 12 m · Footprint width 8 m · Roof pitch (rise per 12) 6 and 8 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Roofer2 roofers22 h (13–49)1½ days
Rated rows22 h (13–49)1½ days

Imperial opening

Footprint length 39 ft · Footprint width 26 ft · Roof pitch (rise per 12) 6 and 8 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Roofer2 roofers22 h (12–48)1½ days
Rated rows22 h (12–48)1½ days

Quote check

Been given a quote for this job?

Paste it into the asphalt shingle roof quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the asphalt shingle roof takeoff give for a typical job?
Opened at Footprint length 12 m · Footprint width 8 m · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Ridge length 12 m · Eaves with ice-dam membrane 2 · Eave overhang 400 mm · Exterior wall thickness 150 mm · Ice-dam reach past the wall's inside face 0.61 m · Gable overhang 300 mm · Valleys, along the slope 0 m, it orders: Roofing Shingle, 118 m²; Roofing Underlayment, 1 roll; Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining), 31.1 m²; Roof Ridge Cap, 2 bundles; Ridge Vent Linear Footage, 12.6 m; Roof trusses, 20 trusses. Opened at Footprint length 39 ft · Footprint width 26 ft · Roof pitch (rise per 12) 6 · Slope factor 1.12 · Ridge length 39 ft · Eaves with ice-dam membrane 2 · Eave overhang 16 in · Exterior wall thickness 6 in · Ice-dam reach past the wall's inside face 2 ft · Gable overhang 11.8 in · Valleys, along the slope 0 ft: Roofing Shingle, 12.5 squares; Roofing Underlayment, 1 roll; Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining), 334 sq ft; Roof Ridge Cap, 2 bundles; Ridge Vent Linear Footage, 40.9 ft; Roof trusses, 20 trusses. Every figure follows the dimensions you give it.
Which calculators does the asphalt shingle roof takeoff run?
6 calculators, one to a line: Roofing Shingle Calculator, Roofing Underlayment Calculator, Roof Eave Ice Dam Protection Membrane Footprint (and Valley Lining), Roof Ridge Cap Calculator, Ridge Vent Linear Footage Calculator, Roof Truss Spacing & Count Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the asphalt shingle roof takeoff leave out?
5 things, each named on this page: The deck below, its condition and any repair to it; Hips, step flashing, chimneys, pipe boots and every other penetration; Drip edge, starter strip (the shingle row's allowance covers cutting only) and hip and ridge accessories other than the cap counted here; Intake ventilation at the soffit, which a ridge vent needs and without which it can pull air from the house; Tear-off, disposal and whatever the deck turns out to need.
Can I check a quote for this job against the takeoff?
Yes. The asphalt shingle roof quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.