SettingsSettings for this calculationUS
Waste is set to 12% by hand. Pick a tier above to replace it, or keep your own figure.
The horizontal (plan-view) length of the roof, not the sloped surface.
Measure the roof in plan to the drip edge, overhangs included: the length between the walls plus the rake or eave overhang at each end. Taken at the wall faces, the overhangs are left out. Do not measure up the slope — this calculator accounts for it separately.
Tools needed: Tape measure or blueprints
The horizontal (plan-view) width of the roof.
Measure perpendicular to the length, again in plan to the drip edge with the overhangs included.
Tools needed: Tape measure or blueprints
Rise over a 12-unit run (works the same in feet or meters) — steeper roofs have more actual surface area than their footprint.
Check your building plans, or measure: for every 12 units you move horizontally along the roof, how many of the same units does it rise vertically? The degree figure shown is the same regardless of your unit preference.
Extra field shingles for cutting at hips, valleys, rakes and penetrations, and for starter rows and caps cut from field shingles.
10-15% is standard where the starter rows and the hip and ridge caps are cut from field shingles. If you buy dedicated starter strip and cap shingles as their own lines, they are no longer part of this allowance, so lower it to cover cutting alone. Use the higher end for complex roofs with many hips, valleys, or dormers.
Which edges the roof has, for the starter strip and the ridge and hip caps.
A gable has two eaves along the length, two sloping rakes and a ridge the length of the roof. A hip has eaves all round, four hips and a ridge the length less the width. A shed slopes one way, with one eave and two rakes. The area and the shingles do not change with the shape.
The area one roll covers, from its label; 0 leaves the underlayment out.
A synthetic underlayment roll commonly covers 1,000 sq ft (about 93 m²), a roll of No. 15 felt about 400 sq ft and No. 30 felt about 200 sq ft. A 10% lap allowance is added, as on the Roofing Underlayment Calculator.
Estimated roofing shingle needed
41 bundles
13.6 squares
- Roof footprint area
- 1,089 sq ft
- Actual roof surface area
- 1,217.54 sq ft
- Roof surface area
- 1,217.54 sq ft
- Bundles needed
- 41 bundles
- Underlayment rolls, 10% laps added
- 2 rolls
- Starter strip run, eaves and rakes
- 139.79 ft
- Ridge and hip run
- 33 ft
- Ridge and hip cap bundles, about 33 ft each
- 1 bundle
Formula with your numbers
- Measure the roof's plan × = 1,089 sq ft
- Correct for the slope1,089 sq ft × the slope factor for = 1,217.54 sq ft
- Add waste and state it in squares1,217.54 sq ft ÷ 100 + % waste = 13.6 squares
- Round up to whole bundles3 bundles a square, rounded up = 41 bundles
They open the calculator with your figures already in it
Roofing Shingle Calculator: 13.64 squares — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- 1 roofing square = 100 sq ft; standard 3-tab and architectural shingles use 3 bundles per square
- Roof surface area = footprint area x slope multiplier, where slope multiplier = sqrt(1 + (rise/12)²) for a given X/12 pitch
- Underlayment rolls = roof area x 1.10 lap allowance / roll coverage (the site's Roofing Underlayment Calculator); ridge cap bundles at about 33 linear ft each (the site's Ridge Cap Calculator, common asphalt shingle maker specs); starter strip runs along the eaves and rakes, as asphalt shingle makers' instructions show
Inputs used
- Roof Footprint Length
- 33 ft
- Roof Footprint Width
- 33 ft
- Roof Pitch
- 6/12 — 26.6° (common)
- Waste Factor (%)
- 12
- Roof Shape
- Gable (ridge along the length)
- Underlayment Roll Coverage
- 1000 sq ft
Intermediate steps
- Roof footprint area
- 1,089 sq ft
- Actual roof surface area
- 1,217.54 sq ft
- Roof surface area
- 1,217.54 sq ft
- Bundles needed
- 41 bundles
- Underlayment rolls, 10% laps added
- 2 rolls
- Starter strip run, eaves and rakes
- 139.79 ft
- Ridge and hip run
- 33 ft
- Ridge and hip cap bundles, about 33 ft each
- 1 bundle
What this calculation does not cover
- The slope multiplier is applied to exactly the rectangle you enter, and nothing is added for the eaves and rakes, so the two dimensions have to be the roof's plan to the drip edge rather than the building's footprint at the walls. Taken at the wall faces they leave the overhangs out: on a 10 by 10 m building with 500 mm of overhang all round the roof plan is really 11 by 11 m, and the 6/12 job that reads 41 bundles at the wall dimensions needs 49.
- One length times one width times one multiplier is the entire geometry model, so anything that is not a single rectangle under a single pitch has to be split up by hand: an L-plan, a cross gable, a lower porch or garage roof at a shallower pitch, and a dormer cheek are all outside what two footprint figures can describe. Run each rectangle at its own pitch and add the squares. The edge rows (starter strip, ridge and hips) come from the shape you pick on the same rectangle: a gable, a four-slope hip of one pitch, or a shed; valleys are never counted.
- Pitch is a six-item list — flat, 4, 6, 8, 10 and 12 in 12 — not a number you can type, so a 7/12 or 9/12 roof has to be forced onto the nearest rung; choosing 6/12 rather than 8/12 on the default job moves the order from 41 bundles to 44, with the true 7/12 answer sitting between the two. The flat entry sets the multiplier to exactly 1 and still returns a bundle count, because this is area arithmetic and makes no judgement about whether shingles belong on a slope that shallow.
- Three bundles to the square is a fixed constant in the code and nothing on the form asks which shingle you are buying. If the coverage printed on the wrapper is not one third of a square, the bundle line is wrong in direct proportion while the squares figure above it stays right, so divide the squares yourself by the coverage stated on the pallet. Rounding up happens only at the bundle, so the answer never rounds to a whole square, a full pallet or a supplier's minimum drop.
- The waste percentage is a flat multiplier on the area, which turns the allowance into more of the same field shingle and nothing else — at the 12 per cent default that is about 1.4 extra squares, roughly four more bundles of the identical product. That works if you are cutting starters and caps from field shingles; if you buy the dedicated starter strip and cap bundles in the edge rows instead, lower the percentage to cover cutting alone. The percentage does not respond to how much cut edge you have, so a plain gable and a hip roof with four valleys are charged the same 12 per cent unless you raise it.
- Underlayment rolls are the roof area with a fixed 10 per cent for laps, divided by the coverage you enter; ice-and-water membrane at the eaves and valleys, drip edge and flashings are not counted. Cap bundles use about 33 linear feet a bundle, and the starter strip is given as a run, since starter bundle coverage varies by maker.
- Nothing is deducted for what sits inside the roof plane: chimneys, skylights, roof windows and open metal valleys are all shingled straight over, since there is no field in which to enter them. Order from the squares figure at the top rather than from the surface-area rows in the breakdown, because those rows are the bare roof before waste — the 1,203 sq ft (112 m²) line on the default job is about 145 sq ft (13 m²) short of the 13.5 squares the headline is telling you to buy.
- Squares and bundles are how North American roofing is sold. A UK, Australian or other metric reader outside North America is given the roof covering to buy in square metres, with the waste, instead: divide it by the coverage printed on the pack of the shingles or tiles you buy.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
This changes the drawing and no number above it. A gable and a hip over the same footprint at the same pitch have the same surface area, so this calculator never asks which you have — and its own limitations say a gable and a hip are charged the same. Pick the one you are building so the picture matches the job.
Part of bigger jobs
This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.
Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.
also measuresRoofing UnderlaymentRoof Eave Ice Dam Protection Membrane Footprint (and Valley Lining)Roof Ridge CapRidge Vent Linear FootageRoof Truss Spacing & Count
also measures14 other trades
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-10-31 · 4 test vectors · v1.1.0
Regulatory standards & verification citations3
- 1 roofing square = 100 sq ft; standard 3-tab and architectural shingles use 3 bundles per square
- Roof surface area = footprint area x slope multiplier, where slope multiplier = sqrt(1 + (rise/12)²) for a given X/12 pitch
- Underlayment rolls = roof area x 1.10 lap allowance / roll coverage (the site's Roofing Underlayment Calculator); ridge cap bundles at about 33 linear ft each (the site's Ridge Cap Calculator, common asphalt shingle maker specs); starter strip runs along the eaves and rakes, as asphalt shingle makers' instructions show
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To lay shingles. Generic types, no brands, no prices.
Protection this work requires
- Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
- Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Lay shingles: Roof work is the commonest cause of serious fall injury on domestic sites. Edge protection or a properly erected tower is the equipment that matters most here, and a roof that is steep, high, brittle or wet is a job for a roofer with the right access, not a longer ladder.
Show the 6 tools this job needsHide tools
Essential
Chalk line
Claw hammer
Extension ladder
Tape measure
Tower scaffold or trestles
Utility knife
Also needed as materials: chalk refill, replacement blades.
what each roofing tool is for, and the spec that decides which to buy where one does.