Fibre cement siding takeoff

Courses, cutting waste, corner posts, fasteners and caulk for a lap-sided elevation.

Measurements in
4
Trades out
5
Calculators
5
Going in
5of 5
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Fiber-Cement Siding Plank Reveal & Course16 courses––
Fiber-Cement Siding Cutting Waste Factor332.64 sq ft332.64 sq ftno pack size recorded12%
Fiber-Cement Siding Corner Post18.9 ft18.9 ftno pack size recorded5%
Lap Siding Fastener Schedule458 fasteners458 fastenersalready whole10%
Fiber-Cement Siding Caulk Joint Volume0.1266 gal0.1266 galno pack size recordednone

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Fiber-Cement Siding Plank Reveal & Course16 courses––
Fiber-Cement Siding Cutting Waste Factor30.24 m²30.24 m²no pack size recorded12%
Fiber-Cement Siding Corner Post5.67 m5.67 mno pack size recorded5%
Lap Siding Fastener Schedule458 fasteners458 fastenersalready whole10%
Fiber-Cement Siding Caulk Joint Volume0.432 L0.432 Lno pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

5 of 5 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Lap siding is measured in courses rather than in area, and the difference matters more than it sounds. The course count comes from the wall height divided by the reveal — the amount of each plank left showing — and the reveal is a decision, not a property of the plank. Change it by 10 mm on a 2.7 m wall and you gain or lose a course across the whole elevation, which moves the plank count, the fastener count and the look of the building.

Fibre cement is also the material where cutting waste is a real line rather than a rounding. The planks are brittle at the ends, they are cut wet or with a dust-collecting blade, and an off-cut short enough to be useless is more common than in timber. The waste row here is its own calculator for that reason, rather than a percentage buried in the plank count.

The caulk row is the one that decides how the elevation ages. The junctions at corner posts and every trim edge want a movement joint filled with a paintable sealant, not left open because the joint looked tight on the day it was cut. Butt joints between planks are usually not caulked: most plank instructions set them moderate-fit over a joint flashing so that water behind them drains out, so they count here only where the plank maker calls for sealant.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Confirm the weather-resistive barrier and the flashings are complete and lapped correctly before a single plank goes up.
  2. Fit the corner posts and trims first; the planks die into them, not the other way round.
  3. Set the starter strip dead level — every course above it repeats whatever error is in it.
  4. Mark the course lines up the wall rather than measuring each plank off the one below.
  5. Fasten at the schedule, into studs, keeping the nail in the plank's nailing zone.
  6. Back each butt joint with joint flashing as the plank instructions set out, caulk the trim and corner junctions, then prime every cut end before it is covered.

What this takeoff does not cover

  • The weather barrier, flashings and any rainscreen battens behind the siding.
  • Openings. Trims, head flashings and the cuts around a window are set by the opening schedule rather than by the elevation's area.
  • Paint, unless the planks are pre-finished — and cut ends need sealing either way.
  • Soffit, fascia and the junction where the siding meets them.
  • Whether the substrate can take the fastener pattern, which is a structural question about the studs.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Elevation length 10 m · Elevation height 2.7 m · External corners 2 and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter2 carpenters15 h (8.1–30)1 day
Glazier1 glazier1.4 h (0.7–3.0)under a quarter of a day
In all16 h (8.8–33)1 day

Imperial opening

Elevation length 33 ft · Elevation height 9 ft · External corners 2 and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter2 carpenters15 h (8.3–30)1 day
Glazier1 glazier1.4 h (0.7–3.0)under a quarter of a day
In all17 h (9.0–33)1 day

Quote check

Been given a quote for this job?

Paste it into the fibre cement siding quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the fibre cement siding takeoff give for a typical job?
Opened at Elevation length 10 m · Elevation height 2.7 m · External corners 2 · Caulked joint length 12 m, it orders: Fiber-Cement Siding Plank Reveal & Course, 16 courses; Fiber-Cement Siding Cutting Waste Factor, 30.2 m²; Fiber-Cement Siding Corner Post, 5.67 m; Lap Siding Fastener Schedule, 458 fasteners; Fiber-Cement Siding Caulk Joint Volume, 0.43 L. Opened at Elevation length 33 ft · Elevation height 9 ft · External corners 2 · Caulked joint length 39 ft: Fiber-Cement Siding Plank Reveal & Course, 16 courses; Fiber-Cement Siding Cutting Waste Factor, 333 sq ft; Fiber-Cement Siding Corner Post, 18.9 ft; Lap Siding Fastener Schedule, 458 fasteners; Fiber-Cement Siding Caulk Joint Volume, 0.13 gal. Every figure follows the dimensions you give it.
Which calculators does the fibre cement siding takeoff run?
5 calculators, one to a line: Fiber-Cement Siding Plank Reveal & Course Calculator, Fiber-Cement Siding Cutting Waste Factor Calculator, Fiber-Cement Siding Corner Post Calculator, Lap Siding Fastener Schedule Calculator, Fiber-Cement Siding Caulk Joint Volume Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the fibre cement siding takeoff leave out?
5 things, each named on this page: The weather barrier, flashings and any rainscreen battens behind the siding; Openings; Paint, unless the planks are pre-finished; Soffit, fascia and the junction where the siding meets them; Whether the substrate can take the fastener pattern, which is a structural question about the studs.
Can I check a quote for this job against the takeoff?
Yes. The fibre cement siding quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.