Window replacement takeoff

Rough opening, flashing membrane, casing and the heat-loss change for a window swap.

Measurements in
4
Trades out
4
Calculators
4
Going in
4of 4
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Fenestration Rough Opening48.99 in––
Window Opening Flashing Membrane98.27 ft98.27 ftno pack size recorded10%
Door & Window Casing70.4 linear ft70.4 linear ftno pack size recorded10%
Window Heat Loss Savings2240 BTU/hr reduction––

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Fenestration Rough Opening1225 mm––
Window Opening Flashing Membrane29.48 m29.48 mno pack size recorded10%
Door & Window Casing21.12 m21.12 mno pack size recorded10%
Window Heat Loss Savings0.636 kW reduction––

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

4 of 4 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Replacing a window is a hole-in-the-wall job, and the hole is where the estimate lives. The rough opening is not the window's size: it is the window plus shim space at the jambs and head, plus whatever the sill pan and its build-up take, plus an allowance for an opening that is not square — which, in any building older than the people replacing its windows, it will not be.

The flashing membrane is the row that decides whether the wall behind the window is still dry in ten years. It runs the full perimeter with a defined lap past each corner, and it is installed in an order — sill first, then jambs over the sill, then head over the jambs — so that every lap sheds water outward. That sequence is not a preference. Reverse any part of it and the wall drains inward at that joint.

The savings row is the reason the job gets approved and the least reliable number on the page. It compares two U-factors over the glazed area at a design temperature difference, which is the physics; what it cannot see is the air leakage around the old frame, which is often the larger share of what you are actually fixing.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure the existing opening in three places each way — it will not be square.
  2. Order to the rough opening, not to the old window, and confirm the handing and the opening direction.
  3. Strip back far enough to see the sheathing and whatever the old flashing was doing.
  4. Flash the sill first, or fit the sill pan, with end dams and a back dam, sloping out and turned up the jambs.
  5. Set the window on it, shim at the fixing points only, and fix through the shims rather than beside them; leave the bottom flange untaped so the sill can drain.
  6. Flash the jambs over the ends of the sill piece, then the head over the jambs, each lapping over the one below, then insulate and seal the inside.

What this takeoff does not cover

  • The window itself, its glazing specification and its hardware.
  • Structural change. Making an opening larger is a lintel question and this takes off nothing structural.
  • Interior finishes beyond the casing: reveals, window boards, plaster repair and paint.
  • Repair to whatever the old window was hiding, which is the item most likely to change the price.
  • The air leakage the old frame was responsible for, which the savings row does not include.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Window width 1.2 m · Window height 1.2 m · Windows 4 and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Glazier2 glaziers16 h (4.0–32)1 day
Carpenter1 carpenter3.8 h (2.1–8.4)half a day
In all20 h (6.1–40)1½ days

Imperial opening

Window width 4 ft · Window height 4 ft · Windows 4 and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Glazier2 glaziers16 h (4.0–32)1 day
Carpenter1 carpenter3.9 h (2.1–8.6)half a day
In all20 h (6.1–41)1½ days

Quote check

Been given a quote for this job?

Paste it into the window replacement quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the window replacement takeoff give for a typical job?
Opened at Window width 1.2 m · Window height 1.2 m · Windows 4 · Rough opening over the window 25 mm, it orders: Fenestration Rough Opening, 1,225 mm; Window Opening Flashing Membrane, 29.5 m; Door & Window Casing, 21.1 m; Window Heat Loss Savings, 0.64 kW reduction. Opened at Window width 4 ft · Window height 4 ft · Windows 4 · Rough opening over the window 1 in: Fenestration Rough Opening, 49 in; Window Opening Flashing Membrane, 98.3 ft; Door & Window Casing, 70.4 linear ft; Window Heat Loss Savings, 2,240 BTU/hr reduction. Every figure follows the dimensions you give it.
Which calculators does the window replacement takeoff run?
4 calculators, one to a line: Fenestration Rough Opening Calculator, Window Opening Flashing Membrane Calculator, Door & Window Casing Calculator, Window Heat Loss Savings Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the window replacement takeoff leave out?
5 things, each named on this page: The window itself, its glazing specification and its hardware; Structural change; Interior finishes beyond the casing; Repair to whatever the old window was hiding, which is the item most likely to change the price; The air leakage the old frame was responsible for, which the savings row does not include.
Can I check a quote for this job against the takeoff?
Yes. The window replacement quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.