Job takeoff

External door replacement, with its frame takeoff

Take out an outside door and its frame and fit a new one in the same opening: the doorway protected and made secure overnight, the frame packed and fixed, the threshold and weatherbar (the sill or saddle, in North America), the leaf hung with its ironmongery (hardware), the frame sealed outside and in, the reveals made good, the architrave, the paint and the waste.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 3Measurements in
  • 6Trades out

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

How the door is finished

Compare one layer at these dimensions, with the rest of the build-up held as you have it:

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the external door replacement quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

6 of 6 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Dust sheets (drop cloths) inside and out, with tape at the doorwayMasking and Protection Materials CalculatorSheets over the floor inside and the step or path outside, and tape all round the opening to hold a sheet over the decoration beside it while the frame is levered out. The row counts whole sheets and whole rolls.
Base
2 items
Allowance
+0 items · none added
Adjusted
2 items
Order
2 items (no pack size recorded)
Why this quantity?
  1. Base quantity2 itemscalculatorMasking and Protection Materials Calculator v1.0.0, headline
  2. Allowance0 itemsworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity2 itemsworked outthe base plus the allowance
  4. Order quantity2 itemsworked out2 items (no pack size recorded)

Resting on

  • Floor sheeted, inside and out65 sq ftgivenyour floor sheeted, inside and out
  • Room perimeter46 ftassumedthe Masking and Protection Materials Calculator's default
  • Taped lines around the room0assumedset by the External door replacement, with its frame takeoff
  • Doors and windows1assumedset by the External door replacement, with its frame takeoff
  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • One dust sheet covers120 sq ftassumedthe Masking and Protection Materials Calculator's default
  • Tape roll length180 ftassumedthe Masking and Protection Materials Calculator's default

Change any other figure on the Masking and Protection Materials Calculator

2 items
Flashing tape round the opening, for a timber-framed wallWindow Opening Flashing Membrane CalculatorSelf-adhered flashing across the foot of the opening first, then up the jambs over it and across the head, with the page's run past each corner and its allowances, so each piece laps over the one below. It is laid before the frame goes in, over the sill tray or pan. A frame in a brick or block wall is sealed to it with foam and mastic, which leaves this row unticked.
Base
26 ft
Waste allowance
+2.6 ft · 10%, trade convention
Adjusted
28.6 ft
Order
28.6 ft (no pack size recorded)
Why this quantity?
  1. Base quantity26 ftcalculatorWindow Opening Flashing Membrane Calculator v1.0.1, headline with the waste allowance at 0%
  2. Waste allowance2.6 ftworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity28.6 ftcalculatorWindow Opening Flashing Membrane Calculator v1.0.1, headline with the waste allowance at 10%
  4. Order quantity28.6 ftworked out28.6 ft (no pack size recorded)

Resting on

  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • Openings of This Type1assumedset by the External door replacement, with its frame takeoff
  • Run-Past at Each Corner6 inassumedthe Window Opening Flashing Membrane Calculator's default
  • Membrane Roll Width9 inassumedthe Window Opening Flashing Membrane Calculator's default
  • Membrane per Roll75 ftassumedthe Window Opening Flashing Membrane Calculator's default
  • Corner Patch and Lap Allowance24 inassumedthe Window Opening Flashing Membrane Calculator's default
  • Waste Allowance (%)10%assumedthe Window Opening Flashing Membrane Calculator's default

The waste allowance: the calculator's working figure, a trade convention.

Change any other figure on the Window Opening Flashing Membrane Calculator

28.6 ft
Architrave (casing) inside, two legs and a headDoor & Window Casing CalculatorNew architrave round the inside of the frame in the page's stock lengths with its mitre waste, fixed once the reveal's plaster is dry. The old architrave rarely survives the frame coming out.
Base
17 linear ft
Mitre waste
+1.7 linear ft · 10%, trade convention
Adjusted
18.7 linear ft
Order
18.7 linear ft (no pack size recorded)
Why this quantity?
  1. Base quantity17 linear ftcalculatorDoor & Window Casing Calculator v1.1.0, headline with the mitre waste at 0%
  2. Mitre waste1.7 linear ftworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity18.7 linear ftcalculatorDoor & Window Casing Calculator v1.1.0, headline with the mitre waste at 10%
  4. Order quantity18.7 linear ftworked out18.7 linear ft (no pack size recorded)

Resting on

  • Opening Type: Door (3 sides — no bottom)assumedset by the External door replacement, with its frame takeoff
  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Number of Openings1assumedset by the External door replacement, with its frame takeoff
  • Stock Stick Length: 7 ftassumedthe Door & Window Casing Calculator's default
  • Mitre Waste (%)10%assumedthe Door & Window Casing Calculator's default

The mitre waste: the calculator's working figure, a trade convention.

Change any other figure on the Door & Window Casing Calculator

18.7 linear ft
Mastic (caulk) round the frame, outside and insideCaulk & Sealant CalculatorTwo beads, taken on the caulk page as two openings of the frame's size: an exterior mastic where the frame meets the brick or render, and inside a paintable decorator's caulk along the architrave's outer edge, where it meets the plaster, the joint that shows once the architrave hides the frame's own. Both at the page's 1/4 in (6 mm) bead and its waste allowance, in tubes. The page runs each bead across the foot as well: outside that stands for the ends of the threshold and its bed; inside there is no bead along the floor, which more than makes up for the architrave's edge being a little longer than the frame, so the tubes run a little over. The filling before the paint does not caulk either joint again.
Base
2 tubes
Waste allowance
+0 tubes · 10%, trade convention
Adjusted
2 tubes
Order
2 tubes, already whole
Why this quantity?
  1. Base quantity2 tubescalculatorCaulk & Sealant Calculator v1.1.0, headline with the waste allowance at 0%
  2. Waste allowance0 tubesworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity2 tubescalculatorCaulk & Sealant Calculator v1.1.0, headline with the waste allowance at 10%
  4. Order quantity2 tubesworked out2 tubes, already whole

Resting on

  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Number of Openings2assumedset by the External door replacement, with its frame takeoff
  • Waste Allowance (%)10%assumedthe Caulk & Sealant Calculator's default

The waste allowance: the calculator's working figure, a trade convention.

Change any other figure on the Caulk & Sealant Calculator

2 tubes
Paint for the door and frame, both faces: undercoat and glossWoodwork Paint CalculatorBoth faces of the leaf, taken as 85% of the frame's outline, and the frame's face outside with the architrave inside, each a run of both jambs and the head at the page's opening girth, two coats at the page's spread rate: an undercoat and a gloss (enamel) coat. Bare timber takes knotting and a primer first, which this figure leaves out, and a steel door is painted over its factory primer with a paint its maker names.
Base
0.2635 gal
Allowance
+0 gal · none added
Adjusted
0.2635 gal
Order
0.2635 gal (no pack size recorded)
Why this quantity?
  1. Base quantity0.2635 galcalculatorWoodwork Paint Calculator v1.0.0, headline
  2. Allowance0 galworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity0.2635 galworked outthe base plus the allowance
  4. Order quantity0.2635 galworked out0.2635 gal (no pack size recorded)

Resting on

  • Doors1assumedset by the External door replacement, with its frame takeoff
  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • Faces painted: Both faces of each doorassumedset by the External door replacement, with its frame takeoff
  • Frame girth6 inassumedthe Woodwork Paint Calculator's default
  • Skirting run0 ftassumedset by the External door replacement, with its frame takeoff
  • Skirting girth4.75 inassumedthe Woodwork Paint Calculator's default
  • Number of coats2assumedthe Woodwork Paint Calculator's default
  • Spread rate400 ft²/galassumedthe Woodwork Paint Calculator's default

Change any other figure on the Woodwork Paint Calculator

0.2635 gal
Skip (dumpster) or van load for the old door and frameSkip & Dumpster Size CalculatorAn allowance rather than anything measured: the old leaf, its frame, the broken plaster and the new door's packaging, taken as loose waste a quarter of a metre (about 10 in) deep over the frame's outline. A single door often leaves in the fitter's van; a pair of doors, or reveals that come away in lumps, fill a small skip.
Base
0.6379 yd³
Allowance
+0 yd³ · none added
Adjusted
0.6379 yd³
Order
0.6379 yd³ (no pack size recorded)
Why this quantity?
  1. Base quantity0.6379 yd³calculatorSkip & Dumpster Size Calculator v1.1.1, headline
  2. Allowance0 yd³worked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity0.6379 yd³worked outthe base plus the allowance
  4. Order quantity0.6379 yd³worked out0.6379 yd³ (no pack size recorded)

Resting on

  • Frame width, outside edges3 ftgivenyour frame width, outside edges
  • Frame height, threshold to head7 ftgivenyour frame height, threshold to head
  • Waste type: Mixed construction waste (472 lb/yd³)assumedset by the External door replacement, with its frame takeoff
  • Container weight limit17,635 lbassumedthe Skip & Dumpster Size Calculator's default

Change any other figure on the Skip & Dumpster Size Calculator

0.6379 yd³
Dust sheets (drop cloths) inside and out, with tape at the doorwayMasking and Protection Materials CalculatorSheets over the floor inside and the step or path outside, and tape all round the opening to hold a sheet over the decoration beside it while the frame is levered out. The row counts whole sheets and whole rolls.
Base
2 items
Allowance
+0 items · none added
Adjusted
2 items
Order
2 items (no pack size recorded)
Why this quantity?
2 items
Flashing tape round the opening, for a timber-framed wallWindow Opening Flashing Membrane CalculatorSelf-adhered flashing across the foot of the opening first, then up the jambs over it and across the head, with the page's run past each corner and its allowances, so each piece laps over the one below. It is laid before the frame goes in, over the sill tray or pan. A frame in a brick or block wall is sealed to it with foam and mastic, which leaves this row unticked.
Base
7.84 m
Waste allowance
+0.784 m · 10%, trade convention
Adjusted
8.62 m
Order
8.62 m (no pack size recorded)
Why this quantity?
8.62 m
Architrave (casing) inside, two legs and a headDoor & Window Casing CalculatorNew architrave round the inside of the frame in the page's stock lengths with its mitre waste, fixed once the reveal's plaster is dry. The old architrave rarely survives the frame coming out.
Base
5.12 m
Mitre waste
+0.512 m · 10%, trade convention
Adjusted
5.63 m
Order
5.63 m (no pack size recorded)
Why this quantity?
5.63 m
Mastic (caulk) round the frame, outside and insideCaulk & Sealant CalculatorTwo beads, taken on the caulk page as two openings of the frame's size: an exterior mastic where the frame meets the brick or render, and inside a paintable decorator's caulk along the architrave's outer edge, where it meets the plaster, the joint that shows once the architrave hides the frame's own. Both at the page's 1/4 in (6 mm) bead and its waste allowance, in tubes. The page runs each bead across the foot as well: outside that stands for the ends of the threshold and its bed; inside there is no bead along the floor, which more than makes up for the architrave's edge being a little longer than the frame, so the tubes run a little over. The filling before the paint does not caulk either joint again.
Base
2 tubes
Waste allowance
+0 tubes · 10%, trade convention
Adjusted
2 tubes
Order
2 tubes, already whole
Why this quantity?
2 tubes
Paint for the door and frame, both faces: undercoat and glossWoodwork Paint CalculatorBoth faces of the leaf, taken as 85% of the frame's outline, and the frame's face outside with the architrave inside, each a run of both jambs and the head at the page's opening girth, two coats at the page's spread rate: an undercoat and a gloss (enamel) coat. Bare timber takes knotting and a primer first, which this figure leaves out, and a steel door is painted over its factory primer with a paint its maker names.
Base
0.9641 L
Allowance
+0 L · none added
Adjusted
0.9641 L
Order
0.9641 L (no pack size recorded)
Why this quantity?
0.9641 L
Skip (dumpster) or van load for the old door and frameSkip & Dumpster Size CalculatorAn allowance rather than anything measured: the old leaf, its frame, the broken plaster and the new door's packaging, taken as loose waste a quarter of a metre (about 10 in) deep over the frame's outline. A single door often leaves in the fitter's van; a pair of doors, or reveals that come away in lumps, fill a small skip.
Base
0.483 m³
Allowance
+0 m³ · none added
Adjusted
0.483 m³
Order
0.483 m³ (no pack size recorded)
Why this quantity?
0.483 m³

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Dust sheets (drop cloths) inside and out, with tape at the doorway0.2 h (0.1–0.5)
  • Flashing tape round the opening, for a timber-framed wall4.0 h (1.0–8.0)
  • Architrave (casing) inside, two legs and a head1.0 h (0.6–2.3)
  • Mastic (caulk) round the frame, outside and inside1.5 h (0.7–3.0)
  • Paint for the door and frame, both faces: undercoat and gloss0.9 h (0.5–2.0)
  • Skip (dumpster) or van load for the old door and frame0.5 h (0.2–1.5)

About 8.1 person-hours in all, between 3.2 and 17.

Trade by trade

  1. Labourer1 labourerunder a quarter of a day
  2. Glazier2 glaziershalf a day
  3. Carpenter1 carpenterunder a quarter of a day
  4. Painter1 painterunder a quarter of a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Dust sheets (drop cloths) inside and out, with tape at the doorway0.2 h (0.1–0.5)
  • Flashing tape round the opening, for a timber-framed wall4.0 h (1.0–8.0)
  • Architrave (casing) inside, two legs and a head1.0 h (0.6–2.3)
  • Mastic (caulk) round the frame, outside and inside1.4 h (0.7–3.0)
  • Paint for the door and frame, both faces: undercoat and gloss0.9 h (0.5–1.9)
  • Skip (dumpster) or van load for the old door and frame0.5 h (0.2–1.4)

About 8.1 person-hours in all, between 3.1 and 17.

Trade by trade

  1. Labourer1 labourerunder a quarter of a day
  2. Glazier2 glaziershalf a day
  3. Carpenter1 carpenterunder a quarter of a day
  4. Painter1 painterunder a quarter of a day

About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

Replacing an outside door keeps the hole in the wall and renews everything in it. The old leaf comes off its hinges, the frame is cut free of its fixings and levered out, and a new frame goes into the same opening: a timber frame hung on site, or a doorset (a prehung door, in North America) that arrives with its leaf already hung. The new frame is set plumb and square on packers, fixed back through its jambs into the reveals (the returns) and sealed to the wall, and the leaf is hung or adjusted until it closes and locks without force. The opening does not change size. A wider or taller door needs a lintel (header) over it, which makes it the new opening takeoff's job rather than this one.

The threshold decides whether the hall stays dry. The door closes onto it, rain runs across it, and the step outside feeds water towards it, so it is bedded on sealant over a sill tray (a sill pan, in North America) that turns any water back out; it falls outwards, and it carries a weatherbar that throws the rain clear of the gap under the leaf. North American carpenters call the same piece the sill or the saddle. No page on this site measures a threshold, so it has no row; it is listed as the job's own work, one to the door, and the check page reads a quote's threshold, weatherbar or door weatherboard, oak or hardwood sill, sill pan, saddle and door sweep as that work, and its door bar or threshold strip as the edge strip where the floor inside meets it.

The rows are what the frame's outline measures. Dust sheets (drop cloths) cover the floor at the doorway inside and out. Flashing tape goes round the opening before the frame, sill first, where the wall is timber-framed; a frame in a masonry wall is sealed to the wall with foam and mastic instead, which is why that row is not held against a quote with metric showing. The mastic (caulk) runs round the frame twice: once outside, where the frame meets the brick or render (stucco), and once inside as the painter's bead along the new architrave's outer edge, where it meets the plaster, counted in tubes on the caulk page's 1/4 in (6 mm) bead at 25 ft (7.6 m) a tube. The architrave (casing) is two legs and a head inside, and the waste is the old door, its frame, the broken plaster and the new door's packaging.

The paint follows the door. A timber door, or a steel one delivered primed, is painted on site on both faces with its frame outside and the architrave inside; its face is taken as 85% of the frame's outline, the frame and threshold taking the rest. A composite, uPVC or fibreglass doorset comes finished from the factory, and then only the new architrave is painted. Choose which one the door is, since the paint row changes with it.

Three questions about the door itself are left open on purpose, and the hanging row's scope statement names them: whether it needs a tested security rating or a lock to an insurer's standard, whether the glass in it must be safety glass, and whether it must resist fire, as a door from an integral garage into the house does. The maker, the insurer and the rules where the house stands decide those, and the page rates none of them.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure the opening inside and out, masonry to masonry and floor to head, and order the door or doorset to fit it; settle who notifies the work or takes out the permit, and have any old panel or board round the frame that could contain asbestos checked before it is disturbed.
  2. On the day, sheet the floor inside and the step outside, take the old leaf off its hinges, cut through the frame's fixings and lever the frame out, saving as much of the reveal as it will give.
  3. Clear the old mastic, foam and loose mortar from the reveals, close the cavity with an insulated closer where it has been left open or bridged, and lay the sill tray or sill pan, with the flashing tape up the jambs where the wall is timber-framed.
  4. Bed the threshold on sealant with its fall outwards, set the frame on it plumb and square on packers, fix it back through the jambs into the wall, and fill the gap behind it with foam or insulation.
  5. Hang the leaf or adjust the doorset, fit the lock, handles, letter plate (mail slot) and hinges, and set the multipoint lock so it throws and locks without force; if the door is not in and locking by the end of the day, board the opening and lock it.
  6. Fix the weatherbar, make good the reveals outside in render, brick or a trim and inside in plaster with a new angle bead where the corner was lost, and run the mastic round the frame outside once the render is dry.
  7. Fix the architrave inside and run the second, paintable bead along its outer edge against the plaster; fill the nail holes and sand, then prime and paint the frame and the door where they are painted on site, and fit the floor's edge strip where the covering inside meets the new threshold.
  8. Clear the old door, frame and packaging, check that the door swings clear, the seals close all round and the keys work every lock, and hand over the keys with the installer's certificate and the makers' guarantees.

What this takeoff does not cover

  • Widening, lowering or moving the hole in the wall: a new or longer steel or concrete lintel (header) over it, with its bearings and props, belongs to the takeoff for a new window or doorway, never to this page.
  • The drainage channel a level, step-free threshold needs and how the approach to the door is laid out for it, and how high a threshold may stand above the floor inside or the ground outside; the rules where the house stands and the door maker's details set those, and the threshold here is counted as one piece of work.
  • The ratings: whether the leaf must resist break-in to a tested standard (PAS 24 in England and Wales), whether an insurer wants its lock made to BS 3621, whether its panels need safety glass, and whether it must resist fire, as one from an integral garage must; the maker, the insurer and the rules decide those, and nothing here rates them.
  • A sub-sill, step or bearer under the threshold found rotten or loose once the old one is out, beyond bedding the new threshold on sound material.
  • Moving a doorbell, an alarm contact, an entry-phone cable or a light switch set in the old frame or its reveal.
  • The door or doorset as a row of its own: it is made or chosen to the size of the hole in the wall, and its make, style, colour and glazing are the buyer's choice with the maker.
  • Consent to change a door on a listed building or in a conservation area, where the new door's look is controlled.

Quote check

Been given a quote for this job?

Paste it into the external door replacement quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the external door replacement takeoff give for a typical job?
Opened at Frame width, outside edges 0.92 m · Frame height, threshold to head 2.1 m · Floor sheeted, inside and out 6 m², it orders: Dust sheets (drop cloths) inside and out, with tape at the doorway, 2 items; Flashing tape round the opening, for a timber-framed wall, 8.62 m; Architrave (casing) inside, two legs and a head, 5.63 m; Mastic (caulk) round the frame, outside and inside, 2 tubes; Paint for the door and frame, both faces: undercoat and gloss, 0.96 L; Skip (dumpster) or van load for the old door and frame, 0.48 m³. Opened at Frame width, outside edges 3 ft · Frame height, threshold to head 7 ft · Floor sheeted, inside and out 65 sq ft: Dust sheets (drop cloths) inside and out, with tape at the doorway, 2 items; Flashing tape round the opening, for a timber-framed wall, 28.6 ft; Architrave (casing) inside, two legs and a head, 18.7 linear ft; Mastic (caulk) round the frame, outside and inside, 2 tubes; Paint for the door and frame, both faces: undercoat and gloss, 0.26 gal; Skip (dumpster) or van load for the old door and frame, 0.64 yd³. Every figure follows the dimensions you give it.
Which calculators does the external door replacement takeoff run?
6 calculators, one to a line: Masking and Protection Materials Calculator, Window Opening Flashing Membrane Calculator, Door & Window Casing Calculator, Caulk & Sealant Calculator, Woodwork Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the external door replacement takeoff leave out?
7 things, each named on this page: Widening, lowering or moving the hole in the wall; The drainage channel a level, step-free threshold needs and how the approach to the door is laid out for it, and how high a threshold may stand above the floor inside or the ground outside; the rules where the house stands and the door maker's details set those, and the threshold here is counted as one piece of work; The ratings; A sub-sill, step or bearer under the threshold found rotten or loose once the old one is out, beyond bedding the new threshold on sound material; Moving a doorbell, an alarm contact, an entry-phone cable or a light switch set in the old frame or its reveal; The door or doorset as a row of its own; Consent to change a door on a listed building or in a conservation area, where the new door's look is controlled.
Can I check a quote for this job against the takeoff?
Yes. The external door replacement quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.