Staircase replacement takeoff

Replace a house's staircase with a new timber flight: dust sheets, the new flight's risers and treads checked against the reader's own rules, the handrail up the pitch and a second one where the flight takes two, spindles (balusters) counted to the IRC's landing gap, the skim on the stairwell's walls, gloss on the strings and the landing's apron, and the skip, with the temporary way up, the strip-out, any trimming of the stairwell, the floor at the landing and the foot, the boards under the flight and the floor finishes listed, never sized and never certified.

Measurements in
10
Trades out
86
Calculators
76
Going in
86of 86
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 3

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

The rules the flight is checked against
The rules the flight is checked against

Calculators behind the other choices:

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 8 rows

8 of 8 going in
ItemQuantityOrderWaste / allowance
Dust sheets at the foot and the head2 items2 itemsno pack size recordednone
Risers and treads, checked against the rules14 risers––
Plastering: skim, in patches50.64 lb50.64 lbno pack size recorded15%
Handrail up the pitch, each rail counted15.29 linear ft15.29 linear ftno pack size recorded10%
Balusters (spindles) under the rail24 balusters24 balustersalready wholenone
Balusters (spindles) along the landing's open edge6 balusters6 balustersalready wholenone
Painting and decorating (decoration): two paint coats, undercoat and gloss (trim enamel), on the strings and the apron0.1763 gal0.1763 galno pack size recordednone
Skip (dumpster) for what comes out3.06 yd³3.06 yd³no pack size recordednone

Every trade's quantity · 6 rows

6 of 8 going in
ItemQuantityOrderWaste / allowance
Dust sheets at the foot and the head2 items2 itemsno pack size recordednone
Risers and treads, checked against the rules14 risers––
Plastering: skim, in patches23 kg23 kgno pack size recorded15%
Handrail up the pitch, each rail counted4.63 m4.63 mno pack size recorded10%
Painting and decorating (decoration): two paint coats, undercoat and gloss (trim enamel), on the strings and the apron0.6507 L0.6507 Lno pack size recordednone
Skip (dumpster) for what comes out2.24 m³2.24 m³no pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

86 of 8 trades6 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Taking a stair out of a lived-in house cuts the upper floor off from the lower one, so the work starts before the old flight is touched: a ladder or a temporary stair is fixed in the stairwell, tied at the top and footed below, with a guard across the landing's open edge, and the household agrees how it will get up and down in the days until the new flight and its balustrade are in. The old flight comes out in pieces, cut down on the spot, with its newels, its balustrade and the linings round it. A new flight is made to measure by a stair maker from the floor-to-floor rise, the going available and the headroom under the floor above, and arrives in one piece, which is why the route in from the front door is protected as carefully as the hall itself.

A replacement need not be a copy of the old stair. An old stair may be steeper, with shorter goings, than the rules now allow, and a flight made to today's figures needs more room on plan: where the new going runs past the old stairwell, the joists round the opening are cut back and new trimmers fixed, with the floor propped until they take it, and where the new flight takes less room, part of the old stairwell is floored over. Both are structural work, items here that the engineer or the stair maker's designer sizes. The stair row checks the flight's rise and going against the rules the reader chooses, Approved Document K in England or the IRC in the US: in England a private stair's rise is at most 220 mm (8.66 in), its going at least 220 mm (8.66 in) and its pitch at most 42 degrees, while the IRC sets a riser of at most 7 3/4 in (197 mm) and a tread of at least 10 in (254 mm). The verdict is a flag and never a certificate; headroom, width and guarding are not in it.

The strings (stringers, to a North American reader) are fixed to the trimmer at the top and the wall along the side, the newels (newel posts) set at the foot and the turns, and the handrail and the balusters (the balustrade, or railing) go in once the walls round the flight are plastered, between the newels and along the landing's open edge. The rows measure the rail up the pitch in the stock lengths each market sells, and the spindles under it where the IRC is chosen, counted bay by bay on the horizontal going (the run) to the gap the baluster page solves for. That gap is the 4 in (101.6 mm) sphere the IRC sets along a landing; on a stair's open side it lets a 4 3/8 in (111 mm) sphere pass, so the flight's count errs a spindle or two high. Approved Document K allows 100 mm (3.94 in), so on the Approved Document K option the spindles are counted from the stair maker's spacing, not by a row here. Once the flight is in, the stairwell's walls are patched and skimmed where the old strings came off, the soffit and the spandrel underneath are boarded, the skirting and string capping are fixed, the woodwork is painted, and the carpet or boards at the landing and the foot are made good round the new flight's footprint.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure before anything is ordered: the floor-to-floor rise from finished floor to finished floor, the going the stairwell allows, the width, and the headroom under the floor above; check whether the new flight changes position, pitch or configuration and needs building control told, and whether the underside of the old stair or the walls round it have a textured coating or boards old enough to need an asbestos check.
  2. Protect the route in from the front door and the floors at the foot and the landing, isolate the landing light or any socket on the stair wall, and fix the temporary ladder or stair with its guard across the landing's open edge before the old flight is touched.
  3. Take out the old balustrade, newels and flight, cutting them down to go out, and strip the linings round the stairwell.
  4. Where the new going runs past the old opening, prop the floor, cut back the joists and fix the new trimmers to the design; where the new flight takes less room, fit new joists and deck over the part of the stairwell no longer used.
  5. Carry the new flight in, offer it up, fix the strings to the trimmer and the wall and set the newels plumb; make up the floor at the landing and the foot to meet it.
  6. Board the soffit and the spandrel where they are boarded, and patch and skim the stairwell's walls where the old strings and balustrade came off; let the plaster dry.
  7. Fit the handrail and the balusters between the newels and along the landing's open edge, a second rail where the flight is wide enough to take one, and fix the skirting and the string capping; take down the temporary access once the balustrade is in.
  8. Fill, sand and paint the strings, the apron and the rest of the woodwork, lay the carpet or boards at the landing and the foot with a strip where they meet the old finish, reconnect the light, clear the waste and hand over the stair maker's drawing and any building control certificate.

What this takeoff does not cover

  • The size of any trimmer, joist or beam where the stairwell is altered or partly floored over. Each is an item here; the engineer or the stair maker's designer sizes it, and nothing on this page does.
  • Building control's decision on the rise, going, pitch, width and headroom: the row that checks the geometry flags a figure outside the rules chosen and says nothing of one inside them.
  • Fire protection of the stair's enclosure in a house of three or more storeys: the protected route, the fire doors onto it and the linings it needs are a fire-safety design of their own.
  • An understairs cupboard, storage drawers or a WC built into the space under the new flight.
  • New floor finishes in the hall or upstairs beyond making good round the new footprint; the made-good carpet or boards and the strip where they meet the old finish are listed.
  • Decorating beyond the stairwell's walls and the flight's woodwork: the walls, ceilings and doors of the hall and the rooms above it.
  • Steel, glass, concrete and spiral stairs, and loft ladders: a timber one carried into the house in one piece is this job.
  • Removing any asbestos the survey finds in the old stair's soffit or the walls round it, which is licensed or specialist work with its own programme.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Floor of the hall and landing protected 12 m² · Rise, finished floor to finished floor 2.6 m · Going of each tread (its run) 255 mm and 7 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer2.7 h (1.4–7.7)half a day
Plasterer1 plasterer1.4 h (0.8–2.8)under a quarter of a day
Carpenter1 carpenter6.9 h (3.7–14)1 day
Painter1 painter0.6 h (0.3–1.3)under a quarter of a day
Rated rows12 h (6.2–26)1½ days

Imperial opening

Floor of the hall and landing protected 130 sq ft · Rise, finished floor to finished floor 8.5 ft · Going of each tread (its run) 10 in and 7 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer2.8 h (1.4–8.0)half a day
Plasterer1 plasterer1.4 h (0.8–2.8)under a quarter of a day
Carpenter1 carpenter7.0 h (3.7–14)1 day
Painter1 painter0.6 h (0.3–1.3)under a quarter of a day
Rated rows12 h (6.3–26)1½ days

Quote check

Been given a quote for this job?

Paste it into the staircase replacement quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the staircase replacement takeoff give for a typical job?
Opened at Floor of the hall and landing protected 12 m² · Rise, finished floor to finished floor 2.6 m · Going of each tread (its run) 255 mm · Going of the whole flight (total run) 3.32 m · Width of the flight 0.9 m · Handrails on the flight 1 · Landing's open edge, guarded 0.9 m · Stairwell walls patched and skimmed 8 m² · Painted depth of a string, measured plumb 300 mm · Loose waste, as a depth over the flight's plan 0.75 m, it orders: Dust sheets at the foot and the head, 2 items; Risers and treads, checked against the rules, 14 risers; Plastering: skim, in patches, 23 kg; Handrail up the pitch, each rail counted, 4.63 m; Painting and decorating (decoration): two paint coats, undercoat and gloss (trim enamel), on the strings and the apron, 0.65 L; Skip (dumpster) for what comes out, 2.24 m³. Opened at Floor of the hall and landing protected 130 sq ft · Rise, finished floor to finished floor 8.5 ft · Going of each tread (its run) 10 in · Going of the whole flight (total run) 11 ft · Width of the flight 3 ft · Handrails on the flight 1 · Landing's open edge, guarded 3 ft · Stairwell walls patched and skimmed 86 sq ft · Painted depth of a string, measured plumb 11.8 in · Loose waste, as a depth over the flight's plan 2.5 ft: Dust sheets at the foot and the head, 2 items; Risers and treads, checked against the rules, 14 risers; Plastering: skim, in patches, 50.6 lb; Handrail up the pitch, each rail counted, 15.3 linear ft; Balusters (spindles) under the rail, 24 balusters; Balusters (spindles) along the landing's open edge, 6 balusters; Painting and decorating (decoration): two paint coats, undercoat and gloss (trim enamel), on the strings and the apron, 0.18 gal; Skip (dumpster) for what comes out, 3.06 yd³. Every figure follows the dimensions you give it.
Which calculators does the staircase replacement takeoff run?
7 calculators, for 8 lines: Masking and Protection Materials Calculator, Stair Rise & Run Calculator, Skim Coat Plaster Calculator, Handrail Length Calculator, Deck Baluster Calculator, Woodwork Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.6 calculators, one to a line: Masking and Protection Materials Calculator, Stair Rise & Run Calculator, Skim Coat Plaster Calculator, Handrail Length Calculator, Woodwork Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the staircase replacement takeoff leave out?
8 things, each named on this page: The size of any trimmer, joist or beam where the stairwell is altered or partly floored over; Building control's decision on the rise, going, pitch, width and headroom; Fire protection of the stair's enclosure in a house of three or more storeys; An understairs cupboard, storage drawers or a WC built into the space under the new flight; New floor finishes in the hall or upstairs beyond making good round the new footprint; the made-good carpet or boards and the strip where they meet the old finish are listed; Decorating beyond the stairwell's walls and the flight's woodwork; Steel, glass, concrete and spiral stairs, and loft ladders; Removing any asbestos the survey finds in the old stair's soffit or the walls round it, which is licensed or specialist work with its own programme.
Can I check a quote for this job against the takeoff?
Yes. The staircase replacement quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.