Baseboard and casing takeoff
Skirting around a room and casing around its openings, as lengths with a stick count pooled across the room.
- Measurements in
- 5
- Trades out
- 2
- Calculators
- 2
- Going in
- 2of 2
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
Trim is bought in sticks and fitted in runs, and the arithmetic that matters is how the two divide into each other. A wall 4.2 m (13 ft 9 in) long takes a 4.8 m (about 16 ft) stick and wastes 600 mm (about 2 ft), or takes two shorter sticks and gains a joint that will open as the timber moves. Which of those is right is a judgement about the room rather than about the total length, and these rows do not make it: each is a length with waste, and the stick count under it divides that length by one stock length, as if every offcut could be carried to the next wall. For joint-free runs, count each wall against the stick that covers it.
Only two rows here, and the reason is worth stating: the site counts skirting and casing, and does not count the door, the frame, the hardware or the fixings. An assembly that pretended otherwise would be a title doing the work of a recipe.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Fit the floor first if it is going in — skirting scribed to a subfloor sits wrong on the finished one.
- Case the openings before the skirting, so the skirting dies into the casing rather than the other way round.
- Cut external corners as mitres and internal corners as scribes; a mitred internal corner opens.
- Fix into the studs, not just the board, and mark the centres before the first length goes up.
- Fill, caulk the top edge against the wall, and sand the joints before priming.
What this takeoff does not cover
- Doors, frames, linings, hardware and the fixings for any of them.
- Window boards, sills and aprons — a window needs all three and this counts only the casing around it.
- Paint and primer for the trim, which is a different product from the wall paint and measured by length.
- Adhesive, filler and caulk.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Room length 5 m · Room width 4 m · Doorways 1 and 2 more of the page's opening figures
Imperial opening
Room length 16.5 ft · Room width 13 ft · Doorways 1 and 2 more of the page's opening figures
Quote check
Been given a quote for this job?
Paste it into the baseboard and casing quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Room fit-out
7 tradesBoard, fill, paint and floor a rectangular room, walls and ceiling, from one set of dimensions.
Run this takeoffStud partition
3 tradesStuds, jointing compound and outlets for a single run of internal partition.
Run this takeoffTile a floor
4 tradesBacker board, the thinset it is bedded in, tile and adhesive for a rectangular floor from one measurement.
Run this takeoff
Frequently asked questions
- What does the baseboard and casing takeoff give for a typical job?
- Opened at Room length 5 m · Room width 4 m · Doorways 1 · Windows 1 · Skirting stock length (8, 10, 12, 14 or 16) 8, it orders: Baseboard & Trim, 18.8 m; Door & Window Casing, 10.8 m. Opened at Room length 16.5 ft · Room width 13 ft · Doorways 1 · Windows 1 · Skirting stock length (8, 10, 12, 14 or 16) 8: Baseboard & Trim, 61.7 linear ft; Door & Window Casing, 35.2 linear ft. Every figure follows the dimensions you give it.
- Which calculators does the baseboard and casing takeoff run?
- 2 calculators, one to a line: Baseboard & Trim Calculator, Door & Window Casing Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the baseboard and casing takeoff leave out?
- 4 things, each named on this page: Doors, frames, linings, hardware and the fixings for any of them; Window boards, sills and aprons; Paint and primer for the trim, which is a different product from the wall paint and measured by length; Adhesive, filler and caulk.
- Can I check a quote for this job against the takeoff?
- Yes. The baseboard and casing quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.