Floor sanding and refinishing takeoff

Sand a wood floor back to bare timber and finish it again: dust sheets outside the doors and tape along the skirting (baseboard), the sealer and finish coat by coat with the abrasives for every grit in its working, the beading (quarter round or shoe molding) refitted, a threshold strip at each doorway and a skip for a carpet lifted first, with the lead test, the board preparation, the sanding, the gap filling and the doors off and rehung listed, and nothing certified.

Measurements in
5
Trades out
5
Calculators
5
Going in
5of 5
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

At the edge of the floor

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Masking and protection materials2 items2 itemsno pack size recordednone
Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives2.07 gal2.07 galno pack size recorded10%
Beading or skirting (scotia, quarter round, shoe molding)61.65 linear ft61.65 linear ftno pack size recorded10%
Threshold strips (transitions, threshold bars, T-moldings, reducers)3.15 ft3.15 ftno pack size recorded5%
Skip (dumpster)0.8275 yd³0.8275 yd³no pack size recordednone

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Masking and protection materials2 items2 itemsno pack size recordednone
Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives7.87 L7.87 Lno pack size recorded10%
Beading or skirting (scotia, quarter round, shoe molding)18.81 m18.81 mno pack size recorded10%
Threshold strips (transitions, threshold bars, T-moldings, reducers)0.945 m0.945 mno pack size recorded5%
Skip (dumpster)0.6 m³0.6 m³no pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

5 of 5 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Sanding takes a floor back to bare wood by cutting through the old finish and a thin skin of the timber beneath it, which a solid board can give up several times over its life. An engineered board, whose wood is a layer over a core, takes only as many sandings as that wear layer allows: a few on a thick one, once or none on a thin veneer. So the floor is looked at before a machine is hired: whether the boards are solid or engineered, how deep the nails sit, which boards are loose, split or cupped, what is on them now, and how far the gaps between them have opened. Old paint on a painted border, or an old varnish, can contain lead: it is tested, or presumed to be lead, before a drum touches it, and then worked as the EPA's Renovation, Repair and Painting (RRP) Rule requires in US housing built before 1978 (a sander only with a HEPA shroud and vacuum among them), or as HSE's guidance on lead advises in Great Britain. Old floor tiles, or the black bitumen adhesive under a covering, can contain asbestos, and are sampled before anything disturbs them.

The page opens on boards found under a carpet. The carpet, its underlay and the gripper come up and go in the skip, every nail is punched below the surface (a nail set does it in North America), every tack and staple is pulled, and loose boards are screwed down clear of the pipes and cables beneath. The open floor is then sanded along the boards in passes through a sequence of grits, coarse to fine, with a drum or belt sander, and round the walls and in the doorways with an edging sander (edger). Between the coarse and the finer grits the gaps are filled: wide ones with slivers of matching timber glued in, narrow ones with a resin filler mixed with the floor's own fine dust. The sanding, the preparation and the filling are listed as work; their abrasives are counted in the finish row's working.

The finish is a system rather than a single tin: a water-based lacquer (a water-based polyurethane) over its sealer, an oil-modified polyurethane whose first coat seals the wood, or a hardwax or penetrating oil worked in and wiped off. The finish row takes the system chosen on its own page, coat by coat, in the cans each market sells, with the screening between coats its maker asks for. A solvent-borne finish dries with the room ventilated to the outside and any pilot light or open flame turned off, and oily rags and pads are laid flat outdoors or kept in a water-filled metal container, because an oil cures by warming and a crumpled rag can catch fire by itself. The doors come off their hinges for the sanding and go back once the finish has cured as long as its maker gives, before the furniture and rugs return.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Look the floor over, solid or engineered, loose, split or cupped boards, the gaps and what is on it now, and have a painted border or an old varnish tested for lead and old tiles or black adhesive under a covering checked for asbestos before anything is sanded.
  2. With the furniture out, lift the carpet, underlay and gripper or the old covering into the skip, prise off the beading, lift the doors off their hinges, and seal each doorway with a sheet taped round it, masking the skirting, the radiators and anything fixed that stays.
  3. Punch every nail below the surface, pull the tacks and staples, screw down loose boards clear of the pipes and cables beneath, and replace the odd split board.
  4. Sand the open floor along the boards with the drum or belt sander at the coarse grit, and the edges and doorways with the edger at the same grit, emptying the dust bags outdoors into a metal bin as they fill.
  5. Fill the gaps, slivers glued into the wide ones and taken down flush, resin filler with the floor's own dust in the narrow ones and the nail holes, then sand through the finer grits and scrape the corners by hand.
  6. Vacuum, wipe with a tack cloth and lay the sealer and the finish coats, screening or abrading between coats as the maker asks, with the room ventilated to the outside and any pilot light or flame out, and oily rags laid flat outdoors or kept in a water-filled metal container.
  7. Once the finish has cured, pin the beading to the skirting and never to the floor, fix a threshold strip where the floor meets another finish, and rehang the doors on their own hinges.
  8. Take the fine dust off every surface, and hand over the finish maker's care and recoat instructions before the furniture and rugs go back.

What this takeoff does not cover

  • Joist or subfloor renewal, and boards beyond the odd one.
  • Bitumen or old adhesive taken off.
  • Moving the furniture out and back.
  • Staining the timber a colour.
  • Laying new flooring of another kind.
  • Trimming a door's foot, or an undercut, to clear a raised floor.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Floor length 5 m · Floor width 4 m · Doorways 1 and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer0.8 h (0.4–2.1)under a quarter of a day
Floor layer1 floor layer2.9 h (1.5–6.9)half a day
Carpenter1 carpenter3.4 h (1.9–7.5)half a day
In all7.0 h (3.7–17)1 day

Imperial opening

Floor length 16.5 ft · Floor width 13 ft · Doorways 1 and 2 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer0.8 h (0.4–2.2)under a quarter of a day
Floor layer1 floor layer2.9 h (1.5–6.9)half a day
Carpenter1 carpenter3.4 h (1.9–7.5)half a day
In all7.0 h (3.8–17)1 day

Quote check

Been given a quote for this job?

Paste it into the floor sanding and refinishing quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the floor sanding and refinishing takeoff give for a typical job?
Opened at Floor length 5 m · Floor width 4 m · Doorways 1 · Floor sheeted outside the doorways 4 m² · Covering lifted first, as a loose depth over the floor 30 mm, it orders: Masking and protection materials, 2 items; Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives, 7.87 L; Beading or skirting (scotia, quarter round, shoe molding), 18.8 m; Threshold strips (transitions, threshold bars, T-moldings, reducers), 0.95 m; Skip (dumpster), 0.6 m³. Opened at Floor length 16.5 ft · Floor width 13 ft · Doorways 1 · Floor sheeted outside the doorways 43 sq ft · Covering lifted first, as a loose depth over the floor 1.25 in: Masking and protection materials, 2 items; Lacquer, varnish, oil or polyurethane (poly), with its sealer and abrasives, 2.07 gal; Beading or skirting (scotia, quarter round, shoe molding), 61.7 linear ft; Threshold strips (transitions, threshold bars, T-moldings, reducers), 3.15 ft; Skip (dumpster), 0.83 yd³. Every figure follows the dimensions you give it.
Which calculators does the floor sanding and refinishing takeoff run?
5 calculators, one to a line: Masking and Protection Materials Calculator, Floor Sanding and Finish Calculator, Baseboard & Trim Calculator, Floor Transition Strip Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the floor sanding and refinishing takeoff leave out?
6 things, each named on this page: Joist or subfloor renewal, and boards beyond the odd one; Bitumen or old adhesive taken off; Moving the furniture out and back; Staining the timber a colour; Laying new flooring of another kind; Trimming a door's foot, or an undercut, to clear a raised floor.
Can I check a quote for this job against the takeoff?
Yes. The floor sanding and refinishing quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.