Job takeoff

Fitted wardrobe takeoff

Fit a wardrobe (a built-in closet) along a bedroom wall: dust sheets and a masking line round its front, the shelf board for its hanging from the run's width, the woodwork paint where the doors and trims are painted on site and the skirting (baseboard) refitted round it, with the carcasses, scribes, plinth, cornice and doors listed as the joinery they are, and the moved socket and any lighting listed as the electrician's and never certified.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 7Measurements in
  • 4Trades out

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

The hanging inside

Compare one layer at these dimensions, with the rest of the build-up held as you have it:

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the fitted wardrobe quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

4 of 4 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Masking and protection materialsMasking and Protection Materials CalculatorDust sheets over the floor you gave at the calculator's opening sheet size, and one line of tape round the front's outline, the width and the floor-to-ceiling height twice over, where the filling and the decorator's caulk meet the walls and the ceiling. The way in for the long carcass panels is protected as listed work, and not counted here.
Base
3 items
Allowance
+0 items · none added
Adjusted
3 items
Order
3 items (no pack size recorded)
Why this quantity?
  1. Base quantity3 itemscalculatorMasking and Protection Materials Calculator v1.0.0, headline
  2. Allowance0 itemsworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity3 itemsworked outthe base plus the allowance
  4. Order quantity3 itemsworked out3 items (no pack size recorded)

Resting on

  • Floor protected130 sq ftgivenyour floor protected
  • Width of the wardrobe8 ftgivenyour width of the wardrobe
  • Floor to ceiling where it stands8 ftgivenyour floor to ceiling where it stands
  • Taped lines around the room1assumedset by the Fitted wardrobe takeoff
  • Doors and windows0assumedset by the Fitted wardrobe takeoff
  • Tape per opening16.5 ftassumedthe Masking and Protection Materials Calculator's default
  • One dust sheet covers120 sq ftassumedthe Masking and Protection Materials Calculator's default
  • Tape roll length180 ftassumedthe Masking and Protection Materials Calculator's default

Change any other figure on the Masking and Protection Materials Calculator

3 items
Rails and shelves (shelf board, closet rods, shelving): the interior fit-outCloset Shelving CalculatorShelf board across the wardrobe's width at the page's opening stock length and cutting allowance: one shelf run over a single hanging, two over a double hanging, as the build-up below chooses, in 2.4 m boards in metric and 8 ft boards in imperial. The hanging rail (closet rod) runs the width of the shelf over it, so its length is the shelf runs before the allowance; it is bought as rail and is not in this figure, and nor are its end brackets, the shelf supports or the partitions between sections. Drawers and shoe racks come with the carcasses.
Base
8 linear ft
Cutting waste
+0.8 linear ft · 10%, trade convention
Adjusted
8.8 linear ft
Order
8.8 linear ft (no pack size recorded)
Why this quantity?
  1. Base quantity8 linear ftcalculatorCloset Shelving Calculator v1.0.1, headline with the cutting waste at 0%
  2. Cutting waste0.8 linear ftworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity8.8 linear ftcalculatorCloset Shelving Calculator v1.0.1, headline with the cutting waste at 10%
  4. Order quantity8.8 linear ftworked out8.8 linear ft (no pack size recorded)

Resting on

  • Width of the wardrobe8 ftgivenyour width of the wardrobe
  • Shelf Configuration: Single shelf + rodassumedset by the Fitted wardrobe takeoff
  • Stock Shelving Length: 8 ftassumedthe Closet Shelving Calculator's default
  • Cutting Waste (%)10%assumedthe Closet Shelving Calculator's default

The cutting waste: the calculator's working figure, a trade convention.

Change any other figure on the Closet Shelving Calculator

8.8 linear ft
Skirting (baseboard)Baseboard & Trim CalculatorThe skirting you gave, refitted or renewed round the plinth's ends, in stock lengths with the calculator's cutting allowance. The page works out a room's perimeter, so the run reaches it as a square room a quarter of the run each way, whose four sides add up to the run itself; no doorway is taken off. The skirting behind the carcasses is not put back, since the plinth stands in its place.
Base
4 linear ft
Cutting waste
+0.4 linear ft · 10%, trade convention
Adjusted
4.4 linear ft
Order
4.4 linear ft (no pack size recorded)
Why this quantity?
  1. Base quantity4 linear ftcalculatorBaseboard & Trim Calculator v1.1.0, headline with the cutting waste at 0%
  2. Cutting waste0.4 linear ftworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity4.4 linear ftcalculatorBaseboard & Trim Calculator v1.1.0, headline with the cutting waste at 10%
  4. Order quantity4.4 linear ftworked out4.4 linear ft (no pack size recorded)

Resting on

  • Skirting refitted round it4 ftgivenyour skirting refitted round it
  • Number of Doorways0assumedset by the Fitted wardrobe takeoff
  • Stock Stick Length: 8 ftassumedthe Baseboard & Trim Calculator's default
  • Cutting Waste (%)10%assumedthe Baseboard & Trim Calculator's default

The cutting waste: the calculator's working figure, a trade convention.

Change any other figure on the Baseboard & Trim Calculator

4.4 linear ft
Woodwork paint, gloss or eggshellWoodwork Paint CalculatorTwo coats at the page's opening spread rate on each door or sliding panel you gave, both faces, at its width times its height, and on the front's outline, the plinth, the cornice and the scribes up each end, as a run at the page's opening painted girth. The exposed end panels, the shelves and the inside of the carcasses are not in it, a door with mouldings takes more than its outline, and the knotting, primer and undercoat on bare timber or MDF come first and are separate. Shown only where the doors are painted on site.
Base
0.64 gal
Allowance
+0 gal · none added
Adjusted
0.64 gal
Order
0.64 gal (no pack size recorded)
Why this quantity?
  1. Base quantity0.64 galcalculatorWoodwork Paint Calculator v1.0.0, headline
  2. Allowance0 galworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity0.64 galworked outthe base plus the allowance
  4. Order quantity0.64 galworked out0.64 gal (no pack size recorded)

Resting on

  • Doors or sliding panels painted on site4givenyour doors or sliding panels painted on site
  • Width of one door or panel2 ftgivenyour width of one door or panel
  • Height of the doors7 ftgivenyour height of the doors
  • Faces painted: Both faces of each doorassumedthe Woodwork Paint Calculator's default
  • Width of the wardrobe8 ftgivenyour width of the wardrobe
  • Floor to ceiling where it stands8 ftgivenyour floor to ceiling where it stands
  • Frame girth6 inassumedthe Woodwork Paint Calculator's default
  • Skirting run0 ftassumedset by the Fitted wardrobe takeoff
  • Skirting girth4.75 inassumedthe Woodwork Paint Calculator's default
  • Number of coats2assumedthe Woodwork Paint Calculator's default
  • Spread rate400 ft²/galassumedthe Woodwork Paint Calculator's default

Change any other figure on the Woodwork Paint Calculator

0.64 gal
Masking and protection materialsMasking and Protection Materials CalculatorDust sheets over the floor you gave at the calculator's opening sheet size, and one line of tape round the front's outline, the width and the floor-to-ceiling height twice over, where the filling and the decorator's caulk meet the walls and the ceiling. The way in for the long carcass panels is protected as listed work, and not counted here.
Base
3 items
Allowance
+0 items · none added
Adjusted
3 items
Order
3 items (no pack size recorded)
Why this quantity?
3 items
Rails and shelves (shelf board, closet rods, shelving): the interior fit-outCloset Shelving CalculatorShelf board across the wardrobe's width at the page's opening stock length and cutting allowance: one shelf run over a single hanging, two over a double hanging, as the build-up below chooses, in 2.4 m boards in metric and 8 ft boards in imperial. The hanging rail (closet rod) runs the width of the shelf over it, so its length is the shelf runs before the allowance; it is bought as rail and is not in this figure, and nor are its end brackets, the shelf supports or the partitions between sections. Drawers and shoe racks come with the carcasses.
Base
2.4 m
Cutting waste
+0.24 m · 10%, trade convention
Adjusted
2.64 m
Order
2.64 m (no pack size recorded)
Why this quantity?
2.64 m
Skirting (baseboard)Baseboard & Trim CalculatorThe skirting you gave, refitted or renewed round the plinth's ends, in stock lengths with the calculator's cutting allowance. The page works out a room's perimeter, so the run reaches it as a square room a quarter of the run each way, whose four sides add up to the run itself; no doorway is taken off. The skirting behind the carcasses is not put back, since the plinth stands in its place.
Base
1.2 m
Cutting waste
+0.12 m · 10%, trade convention
Adjusted
1.32 m
Order
1.32 m (no pack size recorded)
Why this quantity?
1.32 m
Woodwork paint, gloss or eggshellWoodwork Paint CalculatorTwo coats at the page's opening spread rate on each door or sliding panel you gave, both faces, at its width times its height, and on the front's outline, the plinth, the cornice and the scribes up each end, as a run at the page's opening painted girth. The exposed end panels, the shelves and the inside of the carcasses are not in it, a door with mouldings takes more than its outline, and the knotting, primer and undercoat on bare timber or MDF come first and are separate. Shown only where the doors are painted on site.
Base
2.4 L
Allowance
+0 L · none added
Adjusted
2.4 L
Order
2.4 L (no pack size recorded)
Why this quantity?
2.4 L

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Masking and protection materials0.5 h (0.2–1.0)
  • Rails and shelves (shelf board, closet rods, shelving): the interior fit-out3.7 h (1.8–7.3)
  • Skirting (baseboard)0.2 h (0.1–0.5)
  • Woodwork paint, gloss or eggshell2.1 h (1.2–4.8)

About 6.5 person-hours in all, between 3.4 and 14.

Trade by trade

  1. Labourer1 labourerunder a quarter of a day
  2. Carpenter1 carpenterhalf a day
  3. Painter1 painterhalf a day

About 1 day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Masking and protection materials0.5 h (0.2–1.0)
  • Rails and shelves (shelf board, closet rods, shelving): the interior fit-out3.6 h (1.8–7.2)
  • Skirting (baseboard)0.2 h (0.1–0.5)
  • Woodwork paint, gloss or eggshell2.2 h (1.2–4.8)

About 6.5 person-hours in all, between 3.4 and 13.

Trade by trade

  1. Labourer1 labourerunder a quarter of a day
  2. Carpenter1 carpenterhalf a day
  3. Painter1 painterhalf a day

About 1 day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

A fitted wardrobe (a built-in closet, to a North American reader) is joinery made for one wall, and most of the skill in fitting one is making square boxes sit against a room that is not square. The floor falls towards a window, the walls lean out at the top and the ceiling dips in the middle, and the gaps that leaves at each end and along the head are closed with scribes and fillers cut to the wall's own line. So the run is measured and the floor, the walls and the ceiling are read for level and plumb before anything is ordered. The carcasses themselves are a maker's product built to that survey, which is why they, the scribes, the plinth (toe kick) and the cornice (crown molding) are listed here as work rather than counted.

The rows measure what follows from the width of the run. Inside, the shelf board for one shelf over a single hanging rail, or two shelves over a double hanging, comes from the closet shelving page; the hanging rail (closet rod) runs as wide as the shelf above it, though that page leaves it out of its figure, and drawer packs and shoe racks come with the carcasses. Outside, where the doors, carcasses and trims are painted on site rather than arriving finished, the woodwork paint row takes every door or sliding panel on both faces and the front's outline, the plinth along the floor, the cornice along the ceiling and the scribes up each end, at the girth a brush covers.

The doors decide two fixings that reach beyond the wardrobe itself. Hinged doors hang on the carcass sides; a sliding door's head track needs something solid along its whole run, either the carcass tops or a timber header screwed up into the ceiling joists, and its floor track is fixed through the carpet or with the carpet cut back. Both go into a ceiling and a floor that carry the room's cables and pipes, so every hole is scanned first. A socket or switch the carcasses would cover is moved, and any lights inside are wired in, by an electrician whose own certificate covers that work; this page lists it, and signs nothing off.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure the run, read the floor, the walls and the ceiling for level and plumb, mark where each door swings or the sliding track runs, and settle the layout of rails, shelves and drawers before anything is ordered.
  2. Lay dust sheets over the bedroom floor and along the way in for the long panels, take out any old wardrobe or cupboard, and lift off the skirting along the wall the carcasses will stand tight against.
  3. Where a socket or switch is in the way or lights go inside, isolate the circuit and have the electrician move the box and run the cable while the wall is still open.
  4. Stand the carcasses on their plinth line, packed level and plumb, scan the wall and fix each one back against tipping, then scribe the end panels and fillers to the walls and the ceiling.
  5. Fix the rails and shelves to the layout, then hang the doors, or fix the sliding track to the carcass tops or to a header in the ceiling joists with its floor track below, and adjust every door or panel until the gaps run even.
  6. Fit the plinth (toe kick) along the foot and the cornice (crown molding) or top filler along the head, cutting back any of the room's own coving where the cornice meets the ceiling, and refit the skirting round the plinth's ends.
  7. Fill and caulk where the joinery meets the walls and the ceiling, paint whatever is finished on site, have the moved socket and the lights connected and tested, and clear the packaging and offcuts.
  8. Hand over the hinge and track adjustment instructions, any maker's guarantee on the doors and the track, and the electrician's certificate where a socket was moved or lights were wired in.

What this takeoff does not cover

  • Plaster repairs behind the units, beyond packing them plumb.
  • Design drawings and cut lists, which the maker or the joiner draws up.
  • A scheme for the lights.
  • Safety glazing ratings, which the glass maker gives.
  • A radiator moved out of the way, with its pipes.
  • Furniture moved out and brought back.

Quote check

Been given a quote for this job?

Paste it into the fitted wardrobe quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the fitted wardrobe takeoff give for a typical job?
Opened at Floor protected 12 m² · Width of the wardrobe 2.4 m · Floor to ceiling where it stands 2.4 m · Doors or sliding panels painted on site 4 · Width of one door or panel 0.6 m · Height of the doors 2.2 m · Skirting refitted round it 1.2 m, it orders: Masking and protection materials, 3 items; Rails and shelves (shelf board, closet rods, shelving): the interior fit-out, 2.64 m; Skirting (baseboard), 1.32 m; Woodwork paint, gloss or eggshell, 2.4 L. Opened at Floor protected 130 sq ft · Width of the wardrobe 8 ft · Floor to ceiling where it stands 8 ft · Doors or sliding panels painted on site 4 · Width of one door or panel 2 ft · Height of the doors 7 ft · Skirting refitted round it 4 ft: Masking and protection materials, 3 items; Rails and shelves (shelf board, closet rods, shelving): the interior fit-out, 8.8 linear ft; Skirting (baseboard), 4.4 linear ft; Woodwork paint, gloss or eggshell, 0.64 gal. Every figure follows the dimensions you give it.
Which calculators does the fitted wardrobe takeoff run?
4 calculators, one to a line: Masking and Protection Materials Calculator, Closet Shelving Calculator, Baseboard & Trim Calculator, Woodwork Paint Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the fitted wardrobe takeoff leave out?
6 things, each named on this page: Plaster repairs behind the units, beyond packing them plumb; Design drawings and cut lists, which the maker or the joiner draws up; A scheme for the lights; Safety glazing ratings, which the glass maker gives; A radiator moved out of the way, with its pipes; Furniture moved out and brought back.
Can I check a quote for this job against the takeoff?
Yes. The fitted wardrobe quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.