Framed exterior wall takeoff
Studs, insulation, sheathing, wrap and cladding for a new timber-framed wall — every build-up of it on one page.
- Measurements in
- 8
- Trades out
- 6
- Calculators
- 6
- Going in
- 6of 6
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Choose the build-up
Each layer changes the materials below; the dimensions stay the same.
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Every trade's quantity · 6 rows
Every trade's quantity · 6 rows
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
An exterior wall is a stack of decisions, and each one moves a different line. The stud size sets the depth of the cavity and so what insulation fills it; the insulation decides whether a separate vapour membrane belongs on the warm side; the sheathing and the cladding change what is bought without changing the wall's area. Choose each layer above the table and the list below it is the wall you described — the same dimensions, different materials.
Studs at 24 inch (600 mm) centres are the usual partner of 2×6 framing in advanced framing: fewer studs and a deeper, wider cavity to insulate. They are not a free saving. The studs must line up with the joists or trusses above, and the sheathing and the cladding must both be rated for fixing at the wider spacing — check their fastening requirements before choosing it.
Closed-cell spray foam changes the wall more than any other choice here. Filled to the depth of the cavity it insulates, seals against air and slows vapour on its own, so the separate polyethylene membrane is not offered with it: two vapour-closed layers can trap moisture between them. The batts are the opposite case — they do nothing to stop vapour, and whether the climate calls for a membrane over them is a question the page leaves to you.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Set out the plates and mark every stud and opening on them before a single stud is cut.
- Frame the wall, then sheathe it while it is square — the sheathing is what keeps it that way.
- Wrap the sheathing from the bottom up so every lap sheds water, and flash each opening into the wrap.
- Fit the insulation once the services are in and inspected, to the cavity's full depth and without compressing it.
- Where a membrane is chosen, fix it across the inside face of the studs with lapped, taped joints before the lining goes on.
- Clad from the bottom course up, over the wrap and any battens the cladding calls for.
What this takeoff does not cover
- Blocking for fire stops, fixings and sheathing edges, and the extra plate where plates lap at corners and splices. The plates, headers, sills, cripples and the studs at corners and partition junctions are their own row; the headers' depth and plies are the header table's, and the row opens on a 7 1/4 in (184 mm) example to replace.
- The interior lining — board, tape and finish — and paint on either face.
- Openings are not deducted from the sheathing, wrap, insulation, membrane or cladding: every area is the gross wall, which over-orders on a heavily glazed elevation.
- Trims, flashings, corners, starter strips and the cladding's fixings.
- Whether a vapour retarder is needed where you build, and on which face, which depends on the climate and the local code; this page adds one only when you choose it.
- Structure: the stud size and spacing for the wall's height and load, and the sheathing's racking resistance, belong to the framing plan.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Wall length 10 m · Wall height 2.44 m · Doors and windows 2 and 5 more of the page's opening figures
Imperial opening
Wall length 33 ft · Wall height 8 ft · Doors and windows 2 and 5 more of the page's opening figures
Quote check
Been given a quote for this job?
Paste it into the framed exterior wall quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
External wall finish
3 tradesWrap, cladding and finish over a measured wall area.
Run this takeoffInsulate a floor
3 tradesInsulation, vapour control and underlayment over a floor area.
Run this takeoffFibre cement siding
5 tradesCourses, cutting waste, corner posts, fasteners and caulk for a lap-sided elevation.
Run this takeoff
Frequently asked questions
- What does the framed exterior wall takeoff give for a typical job?
- Opened at Wall length 10 m · Wall height 2.44 m · Doors and windows 2 · Corners this wall closes 2 · Partitions meeting this wall 1 · Of the doors and windows, doors 1 · Window rough opening width (each) 0.9 m · Door rough opening width (each) 0.95 m, it orders: Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, 38 studs; Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, 3 packages; Plates, headers, sills, cripples, corner and junction studs, 42.2 m; Wall sheathing, OSB 7/16 in (11 mm), 10 sheets (2440x1220 mm); House Wrap, 1 roll; Vinyl siding, 26.8 m². Opened at Wall length 33 ft · Wall height 8 ft · Doors and windows 2 · Corners this wall closes 2 · Partitions meeting this wall 1 · Of the doors and windows, doors 1 · Window rough opening width (each) 3 ft · Door rough opening width (each) 3 ft: Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, 38 studs; Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, 3 packages; Plates, headers, sills, cripples, corner and junction studs, 139 ft; Wall sheathing, OSB 7/16 in (11 mm), 10 sheets (4x8 ft); House Wrap, 1 roll; Vinyl siding, 2.9 squares. Every figure follows the dimensions you give it.
- Which calculators does the framed exterior wall takeoff run?
- 6 calculators, one to a line: Framing Stud Calculator, Insulation Batt Calculator, Wall Plates, Headers and Cripples Calculator (Sole Plate, Head Binder, Lintel and Corner Studs), Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof), House Wrap Calculator, Siding Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the framed exterior wall takeoff leave out?
- 6 things, each named on this page: Blocking for fire stops, fixings and sheathing edges, and the extra plate where plates lap at corners and splices; The interior lining; Openings are not deducted from the sheathing, wrap, insulation, membrane or cladding; Trims, flashings, corners, starter strips and the cladding's fixings; Whether a vapour retarder is needed where you build, and on which face, which depends on the climate and the local code; this page adds one only when you choose it; Structure.
- Can I check a quote for this job against the takeoff?
- Yes. The framed exterior wall quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.