Framed exterior wall takeoff

Studs, insulation, sheathing, wrap and cladding for a new timber-framed wall — every build-up of it on one page.

Measurements in
8
Trades out
6
Calculators
6
Going in
6of 6
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Framing
Insulation
Vapour control
Sheathing
Cladding

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 6 rows

6 of 6 going in
ItemQuantityOrderWaste / allowance
Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres38 studs38 studsalready whole10%
Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities3 packages3 packagesalready whole10%
Plates, headers, sills, cripples, corner and junction studs138.58 ft138.58 ftno pack size recordednone
Wall sheathing, OSB 7/16 in (11 mm)10 sheets (4x8 ft)10 sheets (4x8 ft)already whole10%
House Wrap1 roll1 rollalready whole10%
Vinyl siding2.9 squares2.9 squaresno pack size recorded10%

Every trade's quantity · 6 rows

6 of 6 going in
ItemQuantityOrderWaste / allowance
Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres38 studs38 studsalready whole10%
Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities3 packages3 packagesalready whole10%
Plates, headers, sills, cripples, corner and junction studs42.17 m42.17 mno pack size recordednone
Wall sheathing, OSB 7/16 in (11 mm)10 sheets (2440x1220 mm)10 sheets (2440x1220 mm)already whole10%
House Wrap1 roll1 rollalready whole10%
Vinyl siding26.84 m²26.84 m²no pack size recorded10%

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

6 of 6 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

An exterior wall is a stack of decisions, and each one moves a different line. The stud size sets the depth of the cavity and so what insulation fills it; the insulation decides whether a separate vapour membrane belongs on the warm side; the sheathing and the cladding change what is bought without changing the wall's area. Choose each layer above the table and the list below it is the wall you described — the same dimensions, different materials.

Studs at 24 inch (600 mm) centres are the usual partner of 2×6 framing in advanced framing: fewer studs and a deeper, wider cavity to insulate. They are not a free saving. The studs must line up with the joists or trusses above, and the sheathing and the cladding must both be rated for fixing at the wider spacing — check their fastening requirements before choosing it.

Closed-cell spray foam changes the wall more than any other choice here. Filled to the depth of the cavity it insulates, seals against air and slows vapour on its own, so the separate polyethylene membrane is not offered with it: two vapour-closed layers can trap moisture between them. The batts are the opposite case — they do nothing to stop vapour, and whether the climate calls for a membrane over them is a question the page leaves to you.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Set out the plates and mark every stud and opening on them before a single stud is cut.
  2. Frame the wall, then sheathe it while it is square — the sheathing is what keeps it that way.
  3. Wrap the sheathing from the bottom up so every lap sheds water, and flash each opening into the wrap.
  4. Fit the insulation once the services are in and inspected, to the cavity's full depth and without compressing it.
  5. Where a membrane is chosen, fix it across the inside face of the studs with lapped, taped joints before the lining goes on.
  6. Clad from the bottom course up, over the wrap and any battens the cladding calls for.

What this takeoff does not cover

  • Blocking for fire stops, fixings and sheathing edges, and the extra plate where plates lap at corners and splices. The plates, headers, sills, cripples and the studs at corners and partition junctions are their own row; the headers' depth and plies are the header table's, and the row opens on a 7 1/4 in (184 mm) example to replace.
  • The interior lining — board, tape and finish — and paint on either face.
  • Openings are not deducted from the sheathing, wrap, insulation, membrane or cladding: every area is the gross wall, which over-orders on a heavily glazed elevation.
  • Trims, flashings, corners, starter strips and the cladding's fixings.
  • Whether a vapour retarder is needed where you build, and on which face, which depends on the climate and the local code; this page adds one only when you choose it.
  • Structure: the stud size and spacing for the wall's height and load, and the sheathing's racking resistance, belong to the framing plan.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Wall length 10 m · Wall height 2.44 m · Doors and windows 2 and 5 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter2 carpenters25 h (14–49)1½ days
Labourer1 labourer2.4 h (1.2–5.4)half a day
In all27 h (15–55)2 days

Imperial opening

Wall length 33 ft · Wall height 8 ft · Doors and windows 2 and 5 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter2 carpenters25 h (14–50)1½ days
Labourer1 labourer2.5 h (1.2–5.4)half a day
In all27 h (15–55)2 days

Quote check

Been given a quote for this job?

Paste it into the framed exterior wall quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the framed exterior wall takeoff give for a typical job?
Opened at Wall length 10 m · Wall height 2.44 m · Doors and windows 2 · Corners this wall closes 2 · Partitions meeting this wall 1 · Of the doors and windows, doors 1 · Window rough opening width (each) 0.9 m · Door rough opening width (each) 0.95 m, it orders: Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, 38 studs; Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, 3 packages; Plates, headers, sills, cripples, corner and junction studs, 42.2 m; Wall sheathing, OSB 7/16 in (11 mm), 10 sheets (2440x1220 mm); House Wrap, 1 roll; Vinyl siding, 26.8 m². Opened at Wall length 33 ft · Wall height 8 ft · Doors and windows 2 · Corners this wall closes 2 · Partitions meeting this wall 1 · Of the doors and windows, doors 1 · Window rough opening width (each) 3 ft · Door rough opening width (each) 3 ft: Studs, 2×4 (38 × 89 mm) at 16 in (400 mm) centres, 38 studs; Fibreglass batts, 3 1/2 in (89 mm), for 2×4 cavities, 3 packages; Plates, headers, sills, cripples, corner and junction studs, 139 ft; Wall sheathing, OSB 7/16 in (11 mm), 10 sheets (4x8 ft); House Wrap, 1 roll; Vinyl siding, 2.9 squares. Every figure follows the dimensions you give it.
Which calculators does the framed exterior wall takeoff run?
6 calculators, one to a line: Framing Stud Calculator, Insulation Batt Calculator, Wall Plates, Headers and Cripples Calculator (Sole Plate, Head Binder, Lintel and Corner Studs), Plywood and OSB Sheet Calculator (Subfloor, Wall and Roof), House Wrap Calculator, Siding Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the framed exterior wall takeoff leave out?
6 things, each named on this page: Blocking for fire stops, fixings and sheathing edges, and the extra plate where plates lap at corners and splices; The interior lining; Openings are not deducted from the sheathing, wrap, insulation, membrane or cladding; Trims, flashings, corners, starter strips and the cladding's fixings; Whether a vapour retarder is needed where you build, and on which face, which depends on the climate and the local code; this page adds one only when you choose it; Structure.
Can I check a quote for this job against the takeoff?
Yes. The framed exterior wall quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.