Job takeoff

Chimney breast removal takeoff

Take a chimney breast out of one room with the stack above left standing: soot and dust sealed in, the props and the support under what stays listed and never sized, the flue capped and vented, the wall, ceiling and floor where the breast stood made good, the room redecorated, and the rubble.

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

  • 11Measurements in
  • 98Trades out

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Making good the wall and ceiling
Floor
Making good the wall and ceiling
Floor

Compare one layer at these dimensions, with the rest of the build-up held as you have it:

Give the job once

Every figure on the right follows these, in the units you choose.

Been given a quote for this job?

Paste it into the chimney breast removal quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.

Check the quote

Every trade, from those dimensions

98 of 9 trades8 trades chosenNot pricedNot in project

then change a dimension, and each line shows what moved.

TradeQuantity
Dust sheets and tape in the roomMasking and Protection Materials CalculatorSheets over the room's whole floor, and tape along its edges and round its doors and windows, which is also what seals the doors against soot. The sheets stay down until the plastering is finished; the route out through the house is listed as work.
Base
3 items
Allowance
+0 items · none added
Adjusted
3 items
Order
3 items (no pack size recorded)
Why this quantity?
  1. Base quantity3 itemscalculatorMasking and Protection Materials Calculator v1.0.0, headline
  2. Allowance0 itemsworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity3 itemsworked outthe base plus the allowance
  4. Order quantity3 itemsworked out3 items (no pack size recorded)

Resting on

  • Room length13 ftgivenyour room length
  • Room width12 ftgivenyour room width
  • Taped lines around the room2assumedthe Masking and Protection Materials Calculator's default
  • Doors in the room1givenyour doors in the room
  • Windows in the room1givenyour windows in the room
  • Tape per opening16.5 ftassumedthe Masking and Protection Materials Calculator's default
  • One dust sheet covers120 sq ftassumedthe Masking and Protection Materials Calculator's default
  • Tape roll length180 ftassumedthe Masking and Protection Materials Calculator's default

Change any other figure on the Masking and Protection Materials Calculator

3 items
Scaffold face up the elevationScaffold Face Area and Hire Quantity CalculatorThe face of scaffold along the elevation below the stack, at the run and height you gave: the access for capping and venting the pots. A platform round the stack on the roof slope itself is the scaffolder's own item on top of this face.
Base
322 ft² of face
Allowance
+0 ft² of face · none added
Adjusted
322 ft² of face
Order
322 ft² of face (no pack size recorded)
Why this quantity?
  1. Base quantity322 ft² of facecalculatorScaffold Face Area and Hire Quantity Calculator v1.0.1, headline
  2. Allowance0 ft² of faceworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity322 ft² of faceworked outthe base plus the allowance
  4. Order quantity322 ft² of faceworked out322 ft² of face (no pack size recorded)

Resting on

  • Scaffold run under the stack14 ftgivenyour scaffold run under the stack
  • Height to the working platform23 ftgivenyour height to the working platform
  • Lift height6.5 ftassumedthe Scaffold Face Area and Hire Quantity Calculator's default
  • Bay length7 ftassumedthe Scaffold Face Area and Hire Quantity Calculator's default
  • Weeks on hire8assumedthe Scaffold Face Area and Hire Quantity Calculator's default

Change any other figure on the Scaffold Face Area and Hire Quantity Calculator

322 ft² of face
Plasterboard (drywall) on the wallCeiling Plasterboard (Gypsum Board) Sheet CalculatorBoard over the wall where the breast stood and the band each side, floor to ceiling, fixed on dabs of adhesive or on battens (furring strips). It is counted on the ceiling sheet page, which takes any area, at its opening sheet and cutting allowance.
Base
2 sheets
Waste allowance
+0 sheets · 10%, trade convention
Adjusted
2 sheets
Order
2 sheets, already whole
Why this quantity?
  1. Base quantity2 sheetscalculatorCeiling Plasterboard (Gypsum Board) Sheet Calculator v1.1.1, headline with the waste allowance at 0%
  2. Waste allowance0 sheetsworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity2 sheetscalculatorCeiling Plasterboard (Gypsum Board) Sheet Calculator v1.1.1, headline with the waste allowance at 10%
  4. Order quantity2 sheetsworked out2 sheets, already whole

Resting on

  • Breast width4 ftgivenyour breast width
  • Band made good round the breast11.75 ingivenyour band made good round the breast
  • Floor to ceiling8 ftgivenyour floor to ceiling
  • Sheet Area32 sq ftassumedthe Ceiling Plasterboard (Gypsum Board) Sheet Calculator's default
  • Waste Allowance (%)10%assumedthe Ceiling Plasterboard (Gypsum Board) Sheet Calculator's default

The waste allowance: the calculator's working figure, a trade convention.

Change any other figure on the Ceiling Plasterboard (Gypsum Board) Sheet Calculator

2 sheets
Plasterboard (drywall) for the hole in the ceilingCeiling Plasterboard (Gypsum Board) Sheet CalculatorBoard for the hole the breast came through and a band round its three open sides, at the calculator's opening sheet and cutting allowance. Where the support is a steel beam at the ceiling, the fire-rated board round it belongs to the fire protection item, not this row.
Base
1 sheet
Waste allowance
+0 sheets · 10%, trade convention
Adjusted
1 sheet
Order
1 sheet, already whole
Why this quantity?
  1. Base quantity1 sheetcalculatorCeiling Plasterboard (Gypsum Board) Sheet Calculator v1.1.1, headline with the waste allowance at 0%
  2. Waste allowance0 sheetsworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity1 sheetcalculatorCeiling Plasterboard (Gypsum Board) Sheet Calculator v1.1.1, headline with the waste allowance at 10%
  4. Order quantity1 sheetworked out1 sheet, already whole

Resting on

  • Breast width4 ftgivenyour breast width
  • Band made good round the breast11.75 ingivenyour band made good round the breast
  • How far the breast stands out14 ingivenyour how far the breast stands out
  • Sheet Area32 sq ftassumedthe Ceiling Plasterboard (Gypsum Board) Sheet Calculator's default
  • Waste Allowance (%)10%assumedthe Ceiling Plasterboard (Gypsum Board) Sheet Calculator's default

The waste allowance: the calculator's working figure, a trade convention.

Change any other figure on the Ceiling Plasterboard (Gypsum Board) Sheet Calculator

1 sheet
Joint compound (mud) for the wall and ceiling boardDrywall Joint Compound CalculatorCompound for bedding the tape and the fill and finish coats over the new board on the wall and the ceiling together, from the calculator's coverage for a three-coat finish with its pan and sanding allowance: whole boxes with imperial showing, the weight of ready-mixed compound with metric. Feathering each coat out onto the old wall and ceiling takes a little more than the board's own area.
Base
1 x 4.5 gal box
Pan and sanding loss
+0 x 4.5 gal boxes · 10%, trade convention
Adjusted
1 x 4.5 gal box
Order
1 x 4.5 gal box, already whole
Why this quantity?
  1. Base quantity1 x 4.5 gal boxcalculatorDrywall Joint Compound Calculator v1.1.0, headline with the pan and sanding loss at 0%
  2. Pan and sanding loss0 x 4.5 gal boxesworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity1 x 4.5 gal boxcalculatorDrywall Joint Compound Calculator v1.1.0, headline with the pan and sanding loss at 10%
  4. Order quantity1 x 4.5 gal boxworked out1 x 4.5 gal box, already whole

Resting on

  • Breast width4 ftgivenyour breast width
  • Band made good round the breast11.75 ingivenyour band made good round the breast
  • Floor to ceiling8 ftgivenyour floor to ceiling
  • How far the breast stands out14 ingivenyour how far the breast stands out
  • Pan and Sanding Loss (%)10%assumedthe Drywall Joint Compound Calculator's default

The pan and sanding loss: the calculator's working figure, a trade convention.

Change any other figure on the Drywall Joint Compound Calculator

1 x 4.5 gal box
Joint tape for the wall and ceiling boardDrywall Joint Tape CalculatorTape for the joints in the new board, at the calculator's rate for its opening 8 ft (2.4 m) boards, and for every edge where the new board meets the old wall and ceiling, entered as its angles: both sides of the wall patch, the angle across its top and the ceiling patch's three open sides. The rate is for a field of boards, so on a patch this small the flat-joint part reads a little high; the edges are the length that counts.
Base
55.24 ft
Waste allowance
+5.52 ft · 10%, trade convention
Adjusted
60.76 ft
Order
60.76 ft (no pack size recorded)
Why this quantity?
  1. Base quantity55.24 ftcalculatorDrywall Joint Tape Calculator v1.1.0, headline with the waste allowance at 0%
  2. Waste allowance5.52 ftworked outthe adjusted figure less the base, at 10% (the calculator's working figure, a trade convention)
  3. Adjusted quantity60.76 ftcalculatorDrywall Joint Tape Calculator v1.1.0, headline with the waste allowance at 10%
  4. Order quantity60.76 ftworked out60.76 ft (no pack size recorded)

Resting on

  • Breast width4 ftgivenyour breast width
  • Band made good round the breast11.75 ingivenyour band made good round the breast
  • Floor to ceiling8 ftgivenyour floor to ceiling
  • How far the breast stands out14 ingivenyour how far the breast stands out
  • Board length: 2.4 m / 8 ftassumedthe Drywall Joint Tape Calculator's default
  • Waste Allowance (%)10%assumedthe Drywall Joint Tape Calculator's default

The waste allowance: the calculator's working figure, a trade convention.

Change any other figure on the Drywall Joint Tape Calculator

60.76 ft
Wall paint for the roomPaint CalculatorThe room's four walls in two coats, the breast now gone, less the doors and windows at the calculator's opening sizes: repainting the whole room keeps the patch from showing. A thinned mist coat goes on the new plaster first, listed as work.
Base
1.82 gal
Allowance
+0 gal · none added
Adjusted
1.82 gal
Order
1.82 gal (no pack size recorded)
Why this quantity?
  1. Base quantity1.82 galcalculatorPaint Calculator v1.2.1, headline
  2. Allowance0 galworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity1.82 galworked outthe base plus the allowance
  4. Order quantity1.82 galworked out1.82 gal (no pack size recorded)

Resting on

  • Room length13 ftgivenyour room length
  • Room width12 ftgivenyour room width
  • Floor to ceiling8 ftgivenyour floor to ceiling
  • Doors in the room1givenyour doors in the room
  • Windows in the room1givenyour windows in the room
  • Area of One Door20.99 sq ftassumedthe Paint Calculator's default
  • Area of One Window15.07 sq ftassumedthe Paint Calculator's default
  • Number of Coats2assumedthe Paint Calculator's default
  • Paint Coverage400 ft²/galassumedthe Paint Calculator's default

Change any other figure on the Paint Calculator

1.82 gal
Ceiling paint for the roomCeiling Paint CalculatorThe whole ceiling, so the patch does not show as a square.
Base
0.78 gal
Allowance
+0 gal · none added
Adjusted
0.78 gal
Order
0.78 gal (no pack size recorded)
Why this quantity?
  1. Base quantity0.78 galcalculatorCeiling Paint Calculator v1.0.0, headline
  2. Allowance0 galworked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity0.78 galworked outthe base plus the allowance
  4. Order quantity0.78 galworked out0.78 gal (no pack size recorded)

Resting on

  • Room length13 ftgivenyour room length
  • Room width12 ftgivenyour room width
  • Number of coats2assumedthe Ceiling Paint Calculator's default
  • Spread rate400 ft²/galassumedthe Ceiling Paint Calculator's default

Change any other figure on the Ceiling Paint Calculator

0.78 gal
Skip (dumpster) for the rubbleSkip & Dumpster Size CalculatorThe breast taken as solid brick, its width by its depth by the room height, and the hearth slab at 125 mm (5 in) thick, bulked by half again as they break up, the swell the demolition page gives brick masonry, as rubble. The flues inside the breast make the real load lighter; the soot, the surround and the hearth tiles add to it.
Base
2.21 yd³
Allowance
+0 yd³ · none added
Adjusted
2.21 yd³
Order
2.21 yd³ (no pack size recorded)
Why this quantity?
  1. Base quantity2.21 yd³calculatorSkip & Dumpster Size Calculator v1.1.1, headline
  2. Allowance0 yd³worked outnone: the calculator adds no allowance, and none was added
  3. Adjusted quantity2.21 yd³worked outthe base plus the allowance
  4. Order quantity2.21 yd³worked out2.21 yd³ (no pack size recorded)

Resting on

  • Breast width4 ftgivenyour breast width
  • How far the breast stands out14 ingivenyour how far the breast stands out
  • Floor to ceiling8 ftgivenyour floor to ceiling
  • Hearth in front of the breast18 ingivenyour hearth in front of the breast
  • Waste type: Rubble, brick, concrete (2,528 lb/yd³)assumedset by the Chimney breast removal takeoff
  • Container weight limit17,635 lbassumedthe Skip & Dumpster Size Calculator's default

Change any other figure on the Skip & Dumpster Size Calculator

2.21 yd³
Dust sheets and tape in the roomMasking and Protection Materials CalculatorSheets over the room's whole floor, and tape along its edges and round its doors and windows, which is also what seals the doors against soot. The sheets stay down until the plastering is finished; the route out through the house is listed as work.
Base
3 items
Allowance
+0 items · none added
Adjusted
3 items
Order
3 items (no pack size recorded)
Why this quantity?
3 items
Scaffold face up the elevationScaffold Face Area and Hire Quantity CalculatorThe face of scaffold along the elevation below the stack, at the run and height you gave: the access for capping and venting the pots. A platform round the stack on the roof slope itself is the scaffolder's own item on top of this face.
Base
29.4 m² of face
Allowance
+0 m² of face · none added
Adjusted
29.4 m² of face
Order
29.4 m² of face (no pack size recorded)
Why this quantity?
29.4 m² of face
Backing and finish coat on the wallFloat and Set Plaster CalculatorA backing coat and a finish coat over the wall where the breast stood and the band cut back each side, floor to ceiling, at the calculator's opening thicknesses and allowance; the working gives each coat's bags. Brick behind a breast is often rough, so the backing coat can run thicker than the page's opening figure.
Base
51.19 kg
Waste allowance
+7.68 kg · 15%, trade convention
Adjusted
58.87 kg
Order
58.87 kg (no pack size recorded)
Why this quantity?
58.87 kg
Plasterboard (drywall) for the hole in the ceilingCeiling Plasterboard (Gypsum Board) Sheet CalculatorBoard for the hole the breast came through and a band round its three open sides, at the calculator's opening sheet and cutting allowance. Where the support is a steel beam at the ceiling, the fire-rated board round it belongs to the fire protection item, not this row.
Base
1 sheet
Waste allowance
+0 sheets · 10%, trade convention
Adjusted
1 sheet
Order
1 sheet, already whole
Why this quantity?
1 sheet
Skim coat on the boarded ceilingSkim Coat Plaster CalculatorFinish plaster over the boarded patch, at the calculator's opening thickness and allowance.
Base
2.92 kg
Waste allowance
+0.4387 kg · 15%, trade convention
Adjusted
3.36 kg
Order
3.36 kg (no pack size recorded)
Why this quantity?
3.36 kg
Wall paint for the roomPaint CalculatorThe room's four walls in two coats, the breast now gone, less the doors and windows at the calculator's opening sizes: repainting the whole room keeps the patch from showing. A thinned mist coat goes on the new plaster first, listed as work.
Base
6.63 L
Allowance
+0 L · none added
Adjusted
6.63 L
Order
6.63 L (no pack size recorded)
Why this quantity?
6.63 L
Ceiling paint for the roomCeiling Paint CalculatorThe whole ceiling, so the patch does not show as a square.
Base
2.88 L
Allowance
+0 L · none added
Adjusted
2.88 L
Order
2.88 L (no pack size recorded)
Why this quantity?
2.88 L
Skip (dumpster) for the rubbleSkip & Dumpster Size CalculatorThe breast taken as solid brick, its width by its depth by the room height, and the hearth slab at 125 mm (5 in) thick, bulked by half again as they break up, the swell the demolition page gives brick masonry, as rubble. The flues inside the breast make the real load lighter; the soot, the surround and the hearth tiles add to it.
Base
1.61 m³
Allowance
+0 m³ · none added
Adjusted
1.61 m³
Order
1.61 m³ (no pack size recorded)
Why this quantity?
1.61 m³

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Dust sheets and tape in the room0.6 h (0.3–1.2)
  • Plasterboard (drywall) on the wall0.6 h (0.4–1.2)
  • Plasterboard (drywall) for the hole in the ceiling0.3 h (0.2–0.6)
  • Joint compound (mud) for the wall and ceiling board0.9 h (0.5–1.8)
  • Wall paint for the room6.1 h (3.4–14)
  • Ceiling paint for the room2.6 h (1.4–5.8)
  • Skip (dumpster) for the rubble1.7 h (0.8–5.1)

About 13 person-hours in the rows that carry them, between 7.0 and 29.

Trade by trade

  1. Labourer1 labourerhalf a day
  2. Drywaller1 drywaller + 1 labourerunder a quarter of a day
  3. Taper1 taper + 1 labourerunder a quarter of a day
  4. Painter1 painter1 day

About 1½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

2 rows carry no hours of their own
  • Scaffold face up the elevation: Scaffolding is not rated here: it is usually erected by a scaffolding firm and priced as hire, and where your own crew puts it up, the system and the height set the time.
  • Joint tape for the wall and ceiling board: counted with Joint compound (mud) for the wall and ceiling board

Labour and programme

Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.

  • Dust sheets and tape in the room0.6 h (0.3–1.2)
  • Backing and finish coat on the wall0.7 h (0.4–1.5)
  • Plasterboard (drywall) for the hole in the ceiling0.3 h (0.2–0.6)
  • Skim coat on the boarded ceiling0.2 h (0.1–0.4)
  • Wall paint for the room6.0 h (3.3–13)
  • Ceiling paint for the room2.6 h (1.4–5.8)
  • Skip (dumpster) for the rubble1.6 h (0.8–4.8)

About 12 person-hours in the rows that carry them, between 6.6 and 28.

Trade by trade

  1. Labourer1 labourerhalf a day
  2. Plasterer1 plastererunder a quarter of a day
  3. Drywaller1 drywaller + 1 labourerunder a quarter of a day
  4. Painter1 painter1 day

About 1½ days, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.

1 row carries no hours of its own
  • Scaffold face up the elevation: Scaffolding is not rated here: it is usually erected by a scaffolding firm and priced as hire, and where your own crew puts it up, the system and the height set the time.

Setups you have saved

The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.

How far does a budget go?

At your own prices, with this build-up unchanged.

About this job

A chimney breast is the part of a chimney that stands out into the room, with the fireplace and hearth at its foot and one or more flues rising inside it. Taking it out of one room does not take the chimney away. The breast in the room above, where there is one, and the stack through the roof stay where they are, and their weight, which the breast carried down to its own footing, has to go somewhere else. Where it goes is a structural engineer's design: steel gallows brackets bolted to the wall, or a beam or lintel (a header, in North America) bearing on padstones, set while props hold the masonry above. This page lists the props, that support and its padstones as items and gives none of them a size; where the support is a steel beam, its fire protection is an item too.

Soot is what sets this apart from any other demolition inside a house. It lies in the flue and behind the fireplace, it travels further than brick dust and it stains what it settles on, so the room is sealed at its doors, its floor sheeted wall to wall and the route out to the skip (dumpster) covered before the first brick comes out. An old flue can also hold a liner or pipes containing asbestos, and a gas fire, a back boiler, or cables and a radiator on the breast have to be disconnected first. The breast is broken out from the top down, so no masonry is left overhanging, and bagged as it comes.

What is measured is the gap. On the wall, the breast's footprint up to the ceiling and a band each side where the old plaster is cut back to sound are either plastered in two coats or boarded and skimmed; on the ceiling, the hole the breast came through and a band round it are boarded and skimmed; on the floor, the footprint and the old hearth in front of it are made up level with the floor either side, so one floor finish can run across. The rubble is the breast's own volume, taken as solid brick, with the hearth slab, bulked by half once broken. The units pick how the gap is made good. With metric showing, the wall is plastered in two coats and the ceiling boarded and skimmed, the British way; with imperial showing, wall and ceiling are drywall (plasterboard) taped and finished with joint compound, the North American way, with the tape run along every edge where the new board meets the old. The other, and board skimmed on the wall as well, are each one choice away. The skirting (baseboard) across the gap is listed as work: it is about the breast's width, matched to the old.

The flue that stays still needs looking after, though nothing will burn in it again. Each pot is capped with a ventilated cowl (a chimney cap), so rain stays out and air keeps moving up the flue, and a vent is left wherever the flue is closed off indoors, so damp in a sealed flue has somewhere to go. Capping the pots is work at the top of the roof, which is why there is a scaffold row. Breasts on two floors are this page twice, once for each room, with the support named once, at the top of the upper breast, and the scaffold and the capping once: enter 0 for the scaffold run on the second room. Taking the stack down through the roof as well is a different job, which the exclusions name.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Have the engineer design the support for what stays above, agree it with building control and, on a party wall, with the neighbour, and have any old flue liner or fire surround checked for asbestos before anything is disturbed.
  2. Cap the gas to any fire and isolate the circuits and any radiator on the breast; take off the surround, the fire and the hearth tiles; seal the room's doors and sheet its floor and the route out.
  3. Set the props under the masonry that stays, fix the brackets or bed the beam on its padstones and pack it tight, and have building control see it before it is covered.
  4. Break the breast out from the top down to the floor, bagging the soot and rubble as it comes, and cut the wall behind back to a straight face.
  5. Make up the floor across the old hearth and the footprint, board the hole in the ceiling, and plaster or board the wall, then skim the board or tape and finish its joints; case or coat a steel beam to the fire protection agreed.
  6. Cap and vent the pots from the scaffold, and fit a vent wherever the flue is closed off indoors.
  7. Let the plaster or the joint compound dry and seal it with a mist coat or primer, then paint the room and fit the skirting (baseboard) across where the breast stood; rehang any radiator, refit any sockets that were on the breast, and have the altered circuits tested.

What this takeoff does not cover

  • The support's design: whether brackets are acceptable or a beam or lintel (header) over the breast's opening is needed, its size, its bearings and padstones, its fixings and the props. Each is an item with no quantity; the structural engineer sets them, and the page sizes none of them.
  • The stack above the roof, removed or rebuilt, and the neighbour's half where a stack is shared, with the notice or agreement that cutting into a party wall brings in England and Wales under the Party Wall etc. Act 1996.
  • A back boiler or gas fire's replacement. Disconnecting them is listed as work; a new heat source elsewhere in the house is its own job.
  • The floor finish over the made-up floor. The floor is made up level so one finish can run across; a new carpet or floor for the room is its own job.
  • Removing an asbestos flue liner, flue pipe or fire panel that the survey finds, which is specialist or licensed work outside this page's rows.
  • The breast in the room above. This page is one room; a second breast is this page run again for that room, with the support counted once, and the scaffold and the capping once: enter 0 for the scaffold run on the second room.
  • Moving cables, sockets and pipes off the breast beyond disconnecting them and reconnecting them nearby, which is listed as work and not measured.

Quote check

Been given a quote for this job?

Paste it into the chimney breast removal quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the chimney breast removal takeoff give for a typical job?
Opened at Breast width 1.2 m · How far the breast stands out 0.35 m · Hearth in front of the breast 0.45 m · Floor to ceiling 2.4 m · Band made good round the breast 0.3 m · Room length 4 m · Room width 3.6 m · Doors in the room 1 · Windows in the room 1 · Scaffold run under the stack 4.2 m · Height to the working platform 7 m, it orders: Dust sheets and tape in the room, 3 items; Scaffold face up the elevation, 29.4 m² of face; Backing and finish coat on the wall, 58.9 kg; Plasterboard (drywall) for the hole in the ceiling, 1 sheet; Skim coat on the boarded ceiling, 3.36 kg; Wall paint for the room, 6.63 L; Ceiling paint for the room, 2.88 L; Skip (dumpster) for the rubble, 1.61 m³. Opened at Breast width 4 ft · How far the breast stands out 14 in · Hearth in front of the breast 18 in · Floor to ceiling 8 ft · Band made good round the breast 11.8 in · Room length 13 ft · Room width 12 ft · Doors in the room 1 · Windows in the room 1 · Scaffold run under the stack 14 ft · Height to the working platform 23 ft: Dust sheets and tape in the room, 3 items; Scaffold face up the elevation, 322 ft² of face; Plasterboard (drywall) on the wall, 2 sheets; Plasterboard (drywall) for the hole in the ceiling, 1 sheet; Joint compound (mud) for the wall and ceiling board, 1 x 4.5 gal box; Joint tape for the wall and ceiling board, 60.8 ft; Wall paint for the room, 1.82 gal; Ceiling paint for the room, 0.78 gal; Skip (dumpster) for the rubble, 2.21 yd³. Every figure follows the dimensions you give it.
Which calculators does the chimney breast removal takeoff run?
8 calculators, for 9 lines: Masking and Protection Materials Calculator, Scaffold Face Area and Hire Quantity Calculator, Ceiling Plasterboard (Gypsum Board) Sheet Calculator, Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.8 calculators, one to a line: Masking and Protection Materials Calculator, Scaffold Face Area and Hire Quantity Calculator, Float and Set Plaster Calculator, Ceiling Plasterboard (Gypsum Board) Sheet Calculator, Skim Coat Plaster Calculator, Paint Calculator, Ceiling Paint Calculator, Skip & Dumpster Size Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the chimney breast removal takeoff leave out?
7 things, each named on this page: The support's design; The stack above the roof, removed or rebuilt, and the neighbour's half where a stack is shared, with the notice or agreement that cutting into a party wall brings in England and Wales under the Party Wall etc; A back boiler or gas fire's replacement; The floor finish over the made-up floor; Removing an asbestos flue liner, flue pipe or fire panel that the survey finds, which is specialist or licensed work outside this page's rows; The breast in the room above; Moving cables, sockets and pipes off the breast beyond disconnecting them and reconnecting them nearby, which is listed as work and not measured.
Can I check a quote for this job against the takeoff?
Yes. The chimney breast removal quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.