Renovation & Construction

Floor & Wall Tile Calculator

Count tiles and boxes for a floor or wall, with the waste factor the lay pattern actually needs.

Tiles required: 36 tiles for Area to tile 130 sq ft, Tile length 24 in and Tile width 24 in, the page's opening figures; on the metric page, 12 m², 600 mm and 600 mm give 37 tiles. Sources are cited below.

  • Answers as you type
  • 2 sources cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Net area of floor or wall.

Deduct any large permanent fixture — a bath, a kitchen island — but do not deduct doorways, which usually need a cut tile anyway.

Long side of the tile.

The tile as MANUFACTURED. A rectified tile is cut after firing and is very close to its stated size; a pressed tile is not, and varies enough between batches to be visible in a long run. That variation is what the joint absorbs — which is why a joint narrowed for looks stops being able to do its job, and why tiles from two batches should be mixed across the floor rather than laid in sequence.

Short side of the tile.

The ratio between this and the long side decides which PATTERNS are available. A tile whose length is not a whole multiple of its width cannot be set in a true herringbone or basketweave without cutting every piece. The proportion also governs lippage risk on a half-bond offset: on a long thin tile the middle of one piece meets the end of its neighbour, which is where a bowed tile is furthest out of plane.

How the tiles are laid.

Pattern drives waste far more than tile size does. A diagonal lay cuts every perimeter tile at 45°, and the offcut from one edge rarely fits another — which is why the allowance nearly doubles.

From the supplier's data.

Order full boxes from one batch — dye lots vary visibly between batches of the same product.

More than one room?

Tiles required

36 tiles

High confidence

Keep the spare tiles. A batch-matched replacement in five years is worth more than the box it came in.

Boxes to order
6 boxes
Tiles before waste
32.5 tiles
Waste applied
10 %
Area covered by the boxes
144 sq ft
Spare after the job
0 tiles

Formula with your numbers

  1. Divide the area by one tile ÷ ( × ) = 32.5 tiles
  2. Add the pattern waste and round up32.5 tiles + 10 % waste, rounded up = 36 tiles
  3. Round up to whole boxes36 tiles ÷ a box, rounded up = 6 boxes
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • TCNA Handbook and BS 5385 both recommend 5-10% waste for a straight lay and 15-20% for a diagonal or herringbone pattern
  • Tile is sold by the box; box coverage varies by format and must come from the supplier

Inputs used

Area to tile
130 sq ft
Tile length
24 in
Tile width
24 in
Lay pattern
Straight / stack bond — 10% waste
Tiles per box
6

Intermediate steps

Boxes to order
6 boxes
Tiles before waste
32.5 tiles
Waste applied
10 %
Area covered by the boxes
144 sq ft
Spare after the job
0 tiles
Safety / waste buffer appliedPattern waste (+10%)
Final result36 tiles

Confidence note: Keep the spare tiles. A batch-matched replacement in five years is worth more than the box it came in.

What this calculation does not cover

  • Nothing checks that the tile and the pattern belong together. A tile with any edge of 15 in (about 380 mm) or more falls under a tighter substrate flatness rule — TCNA asks for 1/8 in in 10 ft — and the offset on a long plank is held to roughly a third of its length, because a half-bond sets the neighbouring tile's high point against your tile's crown and produces lippage. This will happily return a herringbone count for a 1200 mm plank over a floor that cannot take it.
  • Movement joints sit outside the count. The same TCNA and BS 5385 documents cited above for the waste figures also call for a soft joint at every perimeter and wall abutment, around columns and fixed penetrations, and across the field at intervals — roughly 8 to 10 m indoors, and much closer over a heated screed or outside. Those joints take sealant and a profile rather than grout, and a floor tiled hard into its walls tents at the first hot spell.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

11.4 ft3.48 m11.4 ft3.48 mequivalent area130 sq ft12.08 m²5 ft1 m

Part of bigger jobs

This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.

Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-17 · 4 test vectors · v1.0.2

Regulatory standards & verification citations2
  1. TCNA Handbook and BS 5385 both recommend 5-10% waste for a straight lay and 15-20% for a diagonal or herringbone pattern
  2. Tile is sold by the box; box coverage varies by format and must come from the supplier
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To lay floor tile, tile a wall, cut ceramic and porcelain tile, grout and seal tiling and mix adhesive or mortar. Generic types, no brands, no prices.

Protection this work requires

  • Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
  • Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
Show the 15 tools this job needs

Essential

  • Chalk line

  • Grout float and sponge

  • Manual tile cutter

  • Mixing bucket or tub

  • Notched trowel

  • Paddle mixer

  • Spirit level

  • Tape measure

Recommended

  • Caulking gun

  • Rubber mallet

  • Tile nippers

  • Wet tile saw

Optional

  • Hole saw set

  • Laser level

  • Shovel and spade

Also needed as materials: caulk and sealant cartridges, chalk refill, diamond tile blades, grout sponges.

what each tiling tool is for, and the spec that decides which to buy where one does.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

  • A walk-in shower cut into a floor that already exists: the depth budget under it, the gradient band the codes barely leave open, and the tanking above it.

  • Setting Floor Tileuses this calculator

    Floor tile is set out before it is set: the first two lines you strike decide every cut, joint and threshold in the room.

  • Fixed modules, a room that is wider at one end, and services that have to be right before the plaster goes on. Setting out a kitchen from one datum.

Still deciding? LVP vs Tile Flooring — the factors that actually differ, with no invented prices.

Already have some? How much floor will my tiles cover?

Worked example: Bathroom gutted and retiled — step 2 of 9

Worked for one job: A small bathroom floor, in tiles and boxes

Already gone wrong? My tiles are coming loose or sounding hollow

The data behind it: Production rates by operation

How to calculate floor & wall tile in 3 steps

  1. Divide the area by one tileDivide the area to tile by the face of one tile, its length times its width, for the tiles that cover the floor before any cuts.
  2. Add the pattern waste and round upAdd the waste for the lay pattern, 10% straight up to 20% herringbone, then round up to whole tiles.
  3. Round up to whole boxesDivide the tiles by the number in one box and round up to whole boxes, ordered from one batch.

Tiles for common floor areas

Page defaults, not your figures above.

Floor areaTiles required
25 sq ft (2.32 m²)7 tiles
50 sq ft (4.65 m²)14 tiles
100 sq ft (9.29 m²)28 tiles
150 sq ft (13.94 m²)42 tiles
200 sq ft (18.58 m²)55 tiles
300 sq ft (27.87 m²)83 tiles
5 m² (53.82 sq ft)16 tiles
10 m² (107.64 sq ft)31 tiles
15 m² (161.46 sq ft)46 tiles
20 m² (215.28 sq ft)62 tiles
30 m² (322.92 sq ft)92 tiles

Key facts

  • The TCNA Handbook and BS 5385 recommend a 5-10% waste allowance for tile laid straight and 15-20% for a diagonal or herringbone pattern. (TCNA Handbook and BS 5385 waste ranges)
  • Tile is sold by the box, and the area one box covers varies with the tile format, so box coverage comes from the supplier's data rather than a fixed figure. (Tile box coverage, supplier data)
  • ANSI A108.02 section 4.3.8.2 caps a running-bond offset at 33% where the side being offset is over 18 in (457 mm) nominal, unless the tile manufacturer specifies otherwise. (IMI on ANSI A108.02 section 4.3.8.2)

Frequently asked questions

Why does a diagonal lay waste so much more?
Because every perimeter tile is cut at 45°, and the triangular offcut from one edge almost never fits anywhere else. On a straight lay the offcut from one wall often completes the opposite wall. That is the whole difference between a 10% and an 18% allowance.
Should I order extra beyond the waste allowance?
Yes — a box. Dye lots vary between production batches, so a tile bought in three years will not match. One spare box, stored flat and dry, is the difference between an invisible repair and re-tiling a room after a leak.
Do I deduct doorways and fixtures?
Deduct large permanent things — a bath, a fitted island. Do not deduct doorways or small obstructions: you will cut a tile to fit around them anyway, and the deduction removes material you still need.
How many boxes of 24 in tile does a 130 sq ft floor take?
6 boxes of six, 36 tiles, for 130 sq ft (12.1 m²) of 24 × 24 in (610 mm) tile laid straight. One tile covers 4 sq ft, so 32.5 tiles cover the floor; the 10% straight-lay waste makes 35.75, rounded up to 36, and 36 over six a box is six boxes. In metric, 12 m² of 600 × 600 mm tile takes 37 tiles in 7 boxes, because a 600 mm tile is slightly smaller than a 24 in one.
Where do the pattern waste percentages come from?
From the ranges the TCNA Handbook and BS 5385 give: 5-10% waste for a straight lay and 15-20% for a diagonal or herringbone pattern. This page takes 10% for a straight or stack bond, 12% for a brick offset, 18% for a diagonal and 20% for a herringbone, applied to the tile count before it is rounded up. A small room with many cuts sits at the top of each range.
Does a large tile need a flatter floor?
Yes: once any edge of the tile reaches 15 in (about 380 mm), TCNA asks for the substrate to be flat to 1/8 in in 10 ft (about 3 mm in 3 m). The offset on a long plank is also held to roughly a third of its length, because a half-bond sets the high point of one bowed tile against its neighbour's end. This page counts tiles and checks neither, so level the floor before you set a large format.
Do I need movement joints in a tiled floor?
Yes: the same TCNA and BS 5385 documents call for a soft joint at every perimeter and wall abutment, around columns and fixed penetrations, and across the field roughly every 8 to 10 m (26 to 33 ft) indoors, closer over a heated screed or outside. Those joints take a sealant and a profile rather than grout, and this count leaves them out; a floor tiled hard into its walls can tent in the first hot spell.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.