Heated bathroom floor takeoff

Hydronic loop or electric mat, crack isolation, tile and adhesive for a warm tiled floor.

Measurements in
4
Trades out
5
Calculators
5
Going in
5of 5
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Radiant Floor PEX Tubing1 of 251.01 linear ft of PEX51.01 linear ft of PEXno pack size recorded10%
Electric Underfloor Heating Mat Area1 of 230.06 sq ft––
Floor Crack Isolation Membrane Coverage1 roll1 rollalready wholenone
Floor & Wall Tile11 tiles11 tilesalready whole10%
Thinset & Tile Adhesive1 bag1 bagalready wholenone

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Radiant Floor PEX Tubing1 of 216.36 m of pex16.36 m of pexno pack size recorded10%
Electric Underfloor Heating Mat Area1 of 22.96 m²––
Floor Crack Isolation Membrane Coverage1 roll1 rollalready wholenone
Floor & Wall Tile12 tiles12 tilesalready whole10%
Thinset & Tile Adhesive1 bag1 bagalready wholenone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

5 of 5 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

This takeoff sizes two heating systems as alternatives: a WET underfloor loop — pipe at a spacing, fed from a manifold — and an electric mat. The two are different systems with different build-ups, different depths and different people installing them, so a project prices one of the two rows, never both. The mat row's figure is the heatable area, not a mat: the floor less the fixtures and a setback at every wall. What you buy is the largest mat in the maker's size list that fits inside that area, because a mat's cable cannot be cut to fit and a mat one size too big has to go back. The row's breakdown names the largest standard mat that fits: a metric size from 1 to 12 m², or in imperial a whole-square-foot mat from 10 to 100 sq ft. Check it against the maker's own list.

The heated part is smaller than the room in every bathroom. Nothing heated goes under the bath, the WC pan or a fitted vanity, because heating a floor nobody stands on wastes the output and because a mat under a fixed fitting cannot be reached if it fails. The tile follows a different rule: it runs under the WC and a pedestal but stops at the bath and fitted units, which is why the takeoff asks for those two footprints separately.

Crack isolation is the row that keeps the tile on. A heated floor moves as it cycles, and a rigid tile bedded straight onto a moving screed is a tile that debonds along its weakest line — usually within a year and usually across the middle of the room.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Confirm the finished floor height early — a heated build-up raises it, and the door will need easing.
  2. Insulate below the loop or the mat, or the heat goes into the slab instead of the room.
  3. Lay and fix the pipe at its spacing, or roll out the mat, keeping either clear of the fixture footprints.
  4. Pressure-test a loop and leave it under pressure while the screed goes in; test a mat's resistance before and after it is covered.
  5. Bond the crack-isolation layer over the cured screed or levelling compound.
  6. Tile with a flexible adhesive, and bring the heat up slowly the first time.

What this takeoff does not cover

  • The manifold, pump, actuators, controls and the connection to a heat source.
  • The leader tubing between the floor and a manifold outside the room. The loop row counts the pipe in the heated floor only; enter the flow and return runs as the leader length on the PEX calculator's own page.
  • A mat's thermostat, floor sensor and electrical connection, which are an electrician's work.
  • Insulation under the loop or the mat, which is what decides whether the system is efficient.
  • Screed or self-levelling compound over the pipe or the mat.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Floor length 2.5 m · Floor width 2 m · Bath, tray and fitted-unit footprint 1.2 m² and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Tiler1 tiler2.3 h (1.3–4.6)half a day
Rated rows2.3 h (1.3–4.6)half a day

Imperial opening

Floor length 8 ft · Floor width 6.5 ft · Bath, tray and fitted-unit footprint 12.9 sq ft and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Tiler1 tiler2.2 h (1.3–4.4)half a day
Rated rows2.2 h (1.3–4.4)half a day

Quote check

Been given a quote for this job?

Paste it into the heated bathroom floor quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs
  • Kitchen refit

    16 trades

    Strip out a kitchen and fit a new one: base and wall units by standard width, the worktop (countertop) in stock lengths or as a template area, plinth (toe kick) and cornice, a tiled splashback, the new floor and the decoration, with the plumbing, electrical and gas work listed and never certified.

    Run this takeoff
  • Floor tiling, backer board, adhesive and the extract fan's airflow for a full bathroom strip-out and refit, with the bath or tray, the tanking, the wall tiling, the sanitaryware and the services listed as work and never certified.

    Run this takeoff
  • Tanking, backer board, tile and adhesive for the walls and tray area of a shower.

    Run this takeoff

Frequently asked questions

What does the heated bathroom floor takeoff give for a typical job?
Opened at Floor length 2.5 m · Floor width 2 m · Bath, tray and fitted-unit footprint 1.2 m² · WC and pedestal footprint 0.4 m², it orders: Radiant Floor PEX Tubing, 16.4 m of pex; Electric Underfloor Heating Mat Area, 2.96 m²; Floor Crack Isolation Membrane Coverage, 1 roll; Floor & Wall Tile, 12 tiles; Thinset & Tile Adhesive, 1 bag. Opened at Floor length 8 ft · Floor width 6.5 ft · Bath, tray and fitted-unit footprint 12.9 sq ft · WC and pedestal footprint 4.31 sq ft: Radiant Floor PEX Tubing, 51 linear ft of PEX; Electric Underfloor Heating Mat Area, 30.1 sq ft; Floor Crack Isolation Membrane Coverage, 1 roll; Floor & Wall Tile, 11 tiles; Thinset & Tile Adhesive, 1 bag. Every figure follows the dimensions you give it.
Which calculators does the heated bathroom floor takeoff run?
5 calculators, one to a line: Radiant Floor PEX Tubing Calculator, Electric Underfloor Heating Mat Area Calculator, Floor Crack Isolation Membrane Coverage Calculator, Floor & Wall Tile Calculator, Thinset & Tile Adhesive Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the heated bathroom floor takeoff leave out?
5 things, each named on this page: The manifold, pump, actuators, controls and the connection to a heat source; The leader tubing between the floor and a manifold outside the room; A mat's thermostat, floor sensor and electrical connection, which are an electrician's work; Insulation under the loop or the mat, which is what decides whether the system is efficient; Screed or self-levelling compound over the pipe or the mat.
Can I check a quote for this job against the takeoff?
Yes. The heated bathroom floor quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.