Kitchen splashback takeoff
Worktop area, tile and adhesive for the run between a counter and the wall units.
- Measurements in
- 3
- Trades out
- 3
- Calculators
- 3
- Going in
- 3of 3
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
A splashback is a strip, and strips behave badly in tile arithmetic. The area is small enough that the pack rounding dominates — a 3 m (10 ft) run 600 mm (2 ft) high is about 1.8 m² (19 sq ft), which is one box of most tiles and two boxes of anything you need to cut a lot of. What decides which is the cut at each end and around the sockets, and a socket in the middle of a run can cost four tiles rather than one.
The worktop row is here because the splashback height is measured from it, not from the floor, and because the two are bought together. It carries the counter alone: an upstand or a full-height splash in the worktop material is the alternative to tiling, changes the job entirely and is not priced here.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Fit and level the worktop first — the splashback is measured from what is actually there.
- Mark the socket and switch positions, then plan the setting-out so cuts fall where they will be seen least.
- Check the wall is flat; a bowed wall shows badly over a short height.
- Fix from a level line, not from the worktop, if the worktop is not level.
- Grout, then silicone the worktop junction rather than grouting it — that joint moves.
What this takeoff does not cover
- Cut-outs for the sink and hob, seams, edge profiles and the fabricator's template — the worktop row is gross area only.
- Sockets, switches and the extra cutting each one causes.
- Upstands, trims and end profiles.
- Anything behind a hob, where the material may need to be non-combustible rather than merely wipeable.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Run length 3 m · Worktop depth 0.6 m · Splashback height 0.6 m
Imperial opening
Run length 10 ft · Worktop depth 2 ft · Splashback height 2 ft
Quote check
Been given a quote for this job?
Paste it into the kitchen splashback quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Kitchen refit
16 tradesStrip out a kitchen and fit a new one: base and wall units by standard width, the worktop (countertop) in stock lengths or as a template area, plinth (toe kick) and cornice, a tiled splashback, the new floor and the decoration, with the plumbing, electrical and gas work listed and never certified.
Run this takeoffBathroom remodel
4 tradesFloor tiling, backer board, adhesive and the extract fan's airflow for a full bathroom strip-out and refit, with the bath or tray, the tanking, the wall tiling, the sanitaryware and the services listed as work and never certified.
Run this takeoffShower enclosure
4 tradesTanking, backer board, tile and adhesive for the walls and tray area of a shower.
Run this takeoff
Frequently asked questions
- What does the kitchen splashback takeoff give for a typical job?
- Opened at Run length 3 m · Worktop depth 0.6 m · Splashback height 0.6 m, it orders: Countertop Area, 1.8 m²; Tile & Grout, 22 tiles; Thinset & Tile Adhesive, 1 bag. Opened at Run length 10 ft · Worktop depth 2 ft · Splashback height 2 ft: Countertop Area, 20 sq ft (total); Tile & Grout, 22 tiles; Thinset & Tile Adhesive, 1 bag. Every figure follows the dimensions you give it.
- Which calculators does the kitchen splashback takeoff run?
- 3 calculators, one to a line: Countertop Area Calculator, Tile & Grout Calculator, Thinset & Tile Adhesive Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the kitchen splashback takeoff leave out?
- 4 things, each named on this page: Cut-outs for the sink and hob, seams, edge profiles and the fabricator's template; Sockets, switches and the extra cutting each one causes; Upstands, trims and end profiles; Anything behind a hob, where the material may need to be non-combustible rather than merely wipeable.
- Can I check a quote for this job against the takeoff?
- Yes. The kitchen splashback quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.