SettingsSettings for this calculationUS
The standard allowance most suppliers and estimating guides assume for ordinary work.
The length of the area to be paved.
Measure the overall length of the patio, walkway, or path.
Tools needed: Tape measure, Stakes and string for marking the layout
The width of the area to be paved.
Measure perpendicular to the length.
Tools needed: Tape measure
Any part of the rectangle that is not paved — a pool, a planting bed, a tree pit. Leave it at 0 for a plain rectangle.
Measure the length and width above across the whole outside edge, then enter here what sits inside it unpaved: for a pool surround, the pool's length times its width, plus the coping band if the coping is bought separately. It comes off before the count, so the waste allowance is applied to the paving only.
The length of a single paver.
Common sizes are 12x12 in (30x30 cm), 16x16 in (40x40 cm), and 6x9 in (15x23 cm) — check your specific product.
The width of a single paver.
Measure the actual paver, not the nominal size, for the most accurate count.
Extra pavers for edge cuts, curves, and breakage.
10% is standard for a simple rectangular layout. Use more for curved edges or a herringbone/diagonal pattern.
Estimated paver needed
143 pavers
The pavers are the visible tenth of the job. What determines whether they stay flat is the base beneath them and the edge restraint around them, and both are larger quantities than the surface.
- Patio area
- 130 sq ft
- Coverage per paver
- 1 sq ft
They open the calculator with your figures already in it
Paver Calculator: 143 pavers — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves
Inputs used
- Patio Length
- 13 ft
- Patio Width
- 10 ft
- Area Left Unpaved
- 0 sq ft
- Paver Length
- 12 in
- Paver Width
- 12 in
- Waste Factor (%)
- 10
Intermediate steps
- Patio area
- 130 sq ft
- Coverage per paver
- 1 sq ft
Confidence note: The pavers are the visible tenth of the job. What determines whether they stay flat is the base beneath them and the edge restraint around them, and both are larger quantities than the surface.
What this calculation does not cover
- Excludes the sub-base, bedding layer and jointing sand, each of which has its own depth and its own compaction allowance.
- Excludes the edge restraint, without which the field spreads laterally under traffic and the joints open.
- Does not model cutting waste on a curved or angled layout, which is far higher than on a rectangular field.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of bigger jobs
This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.
Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-25 · v1.1.0
Regulatory standards & verification citations1
- Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To lay paving. Generic types, no brands, no prices.
Protection this work requires
- Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
- Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
- Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
- Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
Show the 8 tools this job needsHide tools
Essential
Plate compactor
Rubber mallet
Shovel and spade
Spirit level
String line and pins
Wheelbarrow
Recommended
Block splitter
Optional
Angle grinder
Also needed as materials: cutting and diamond discs.
what each landscaping tool is for, and the spec that decides which to buy where one does.
Paver setting-out grid — drawn from your figures
A 3.96 x 3.05 m patio set out in 0.3 x 0.3 m pavers, stack bond.
A DXF plan in metres. Opens in AutoCAD, LibreCAD, QCAD and most jobsite viewers.
What this drawing does not show (3)
- The bond. This is drawn as a stack bond because the calculator counts by AREA and assumes no pattern — running bond, herringbone and basketweave all cover the same area and change only the cuts.
- Joint width and edge restraint.
- Where the cuts fall, which depends on which corner you start from.
It is a setting-out aid drawn from the figures you entered, not a construction drawing, and nobody has checked it against a design.