Materials & Quantities

Paver Calculator

Estimate how many pavers you need for a patio or walkway, based on paver size and area.

Estimated paver needed: 143 pavers for Patio Length 13 ft, Patio Width 10 ft and Area Left Unpaved 0 sq ft, the page's opening figures; on the metric page, 4 m, 3 m and 0 m² give 143 pavers. Sources are cited below.

  • Answers as you type
  • 1 source cited
  • Calculated in your browser
SettingsSettings for this calculationUS
Market
Imperial · sales tax
Who is doing the work?

The standard allowance most suppliers and estimating guides assume for ordinary work.

The length of the area to be paved.

Measure the overall length of the patio, walkway, or path.

Tools needed: Tape measure, Stakes and string for marking the layout

The width of the area to be paved.

Measure perpendicular to the length.

Tools needed: Tape measure

Any part of the rectangle that is not paved — a pool, a planting bed, a tree pit. Leave it at 0 for a plain rectangle.

Measure the length and width above across the whole outside edge, then enter here what sits inside it unpaved: for a pool surround, the pool's length times its width, plus the coping band if the coping is bought separately. It comes off before the count, so the waste allowance is applied to the paving only.

The length of a single paver.

Common sizes are 12x12 in (30x30 cm), 16x16 in (40x40 cm), and 6x9 in (15x23 cm) — check your specific product.

The width of a single paver.

Measure the actual paver, not the nominal size, for the most accurate count.

Extra pavers for edge cuts, curves, and breakage.

10% is standard for a simple rectangular layout. Use more for curved edges or a herringbone/diagonal pattern.

Estimated paver needed

143 pavers

High confidence

The pavers are the visible tenth of the job. What determines whether they stay flat is the base beneath them and the edge restraint around them, and both are larger quantities than the surface.

Patio area
130 sq ft
Coverage per paver
1 sq ft

Formula with your numbers

  1. Take off what is not paved × − = 130 sq ft
  2. Work out one paver's face × = 1 sq ft
  3. Divide, add waste and round up130 sq ft ÷ 1 sq ft + % waste, rounded up = 143 pavers
Then change the inputs to see how far the answer moves.

Show calculation logic

How this was calculated

Formula source(s)

  • Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves

Inputs used

Patio Length
13 ft
Patio Width
10 ft
Area Left Unpaved
0 sq ft
Paver Length
12 in
Paver Width
12 in
Waste Factor (%)
10

Intermediate steps

Patio area
130 sq ft
Coverage per paver
1 sq ft
Final result143 pavers

Confidence note: The pavers are the visible tenth of the job. What determines whether they stay flat is the base beneath them and the edge restraint around them, and both are larger quantities than the surface.

What this calculation does not cover

  • Excludes the sub-base, bedding layer and jointing sand, each of which has its own depth and its own compaction allowance.
  • Excludes the edge restraint, without which the field spreads laterally under traffic and the joints open.
  • Does not model cutting waste on a curved or angled layout, which is far higher than on a rectangular field.

Estimated cost — your price

This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.

13 ft3.96 m10 ft3.05 m130 sq ft12.08 m²5 ft1 m

Part of bigger jobs

This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.

Or plan the space itself: measure it once, doors and windows included, and this figure comes back worked out on that space, with what goes with it.

Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.

Sources checked 2026-09-25 · 3 test vectors · v1.1.0

Regulatory standards & verification citations1
  1. Paver count = area to cover / (paver length x paver width), rounded up with a waste allowance for cuts along edges and curves
Cite this page

Your workspace

Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.

Tools and safety for this job

To lay paving. Generic types, no brands, no prices.

Protection this work requires

  • Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
  • Saws, grinders and breakers run above 85 dB, where hearing damage accumulates and does not recover: defenders or plugs for every cut, not just the long ones.
  • Breakers and grinders cause permanent nerve damage: limit continuous trigger time, keep hands warm, and stop if fingers tingle or blanch.
  • Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
Show the 8 tools this job needs

Essential

  • Plate compactor

  • Rubber mallet

  • Shovel and spade

  • Spirit level

  • String line and pins

  • Wheelbarrow

Recommended

  • Block splitter

Optional

  • Angle grinder

Also needed as materials: cutting and diamond discs.

what each landscaping tool is for, and the spec that decides which to buy where one does.

Paver setting-out grid — drawn from your figures

A 3.96 x 3.05 m patio set out in 0.3 x 0.3 m pavers, stack bond.

A DXF plan in metres. Opens in AutoCAD, LibreCAD, QCAD and most jobsite viewers.

What this drawing does not show (3)
  • The bond. This is drawn as a stack bond because the calculator counts by AREA and assumes no pattern — running bond, herringbone and basketweave all cover the same area and change only the cuts.
  • Joint width and edge restraint.
  • Where the cuts fall, which depends on which corner you start from.

It is a setting-out aid drawn from the figures you entered, not a construction drawing, and nobody has checked it against a design.

Now that you have the number

These guides cover the work this quantity is for — the first ones run this calculator inside the section that raises the question.

Called something else where you work? Paving flags, slabs and pavers — the term in each market, how close the equivalence really is, and the standard that governs it.

Still deciding? Concrete Slab vs Pavers · Deck vs Paver Patio — the factors that actually differ, with no invented prices.

Already have some? How big a patio will my pavers make?

Worked examples: Gravel driveway — step 7 of 8 · Paver patio — step 7 of 10

The data behind it: Production rates by operation

How to calculate paver in 3 steps

  1. Take off what is not pavedMeasure the length and width across the outside edge, multiply them, and take off any pool, planting bed or tree pit inside that is not paved.
  2. Work out one paver's faceMultiply the actual length and width of one paver for the area it covers.
  3. Divide, add waste and round upDivide the paved area by one paver's area, add the waste percentage for edge cuts, curves and breakage, and round up to whole pavers.

Pavers for common patio sizes

Page defaults, not your figures above.

Patio (length × width)Estimated paver needed
10 × 10 ft (3.05 × 3.05 m)110 pavers
12 × 12 ft (3.66 × 3.66 m)159 pavers
12 × 16 ft (3.66 × 4.88 m)212 pavers
16 × 20 ft (4.88 × 6.1 m)352 pavers
20 × 20 ft (6.1 × 6.1 m)440 pavers
3 × 3 m (9.84 × 9.84 ft)107 pavers
4 × 4 m (13.12 × 13.12 ft)190 pavers
4 × 6 m (13.12 × 19.69 ft)285 pavers
5 × 5 m (16.4 × 16.4 ft)297 pavers

Key facts

  • Paver count is the area to cover divided by one paver's length × width, rounded up with a waste allowance for cuts along edges and curves. (Paver count formula)
  • One square foot is 0.09290304 m² (NIST), so a 12 × 12 in paver covers 0.0929 m² and 100 sq ft (9.29 m²) of patio takes 100 such pavers before waste. (NIST SI Guide, App. B.9)
  • One inch is exactly 2.54 cm (NIST), so a 16 × 16 in paver is 40.64 cm square and covers 1.78 sq ft (0.165 m²). (NIST SI Guide, App. B.9)

Frequently asked questions

What actually holds a paved area flat?
The compacted sub-base, not the pavers. A paved surface is a flexible system in which the base spreads the load and the pavers wear; a thin base under good pavers settles and ruts, while a deep well-compacted base under modest pavers stays flat for decades. The base is also the larger quantity, and it is where the cost sits.
Why does edge restraint matter?
Because the field is only held together by friction in the joints, and that friction depends on the pavers being pressed against each other. Without a restraint at the perimeter the outer course creeps outward under traffic, the joints open, jointing sand washes out, and the failure works inward from the edge. It is a small item guarding the whole area.
Should the bedding layer be thick?
No — and thickening it is a common mistake. The bedding sand is a thin, uniform screed whose only job is to accommodate the small dimensional variation between pavers. Made thick, it behaves as a soft layer that consolidates unevenly under load, and the surface ruts along the wheel tracks. Depth belongs in the sub-base.
How much cutting waste should I allow?
About 10% for a simple rectangular layout, the page's default, and more for curved edges or a herringbone or diagonal pattern: the shape decides it, not the area. A rectangular field with a running bond wastes little because the offcut from one course starts the next. A circular, curved or diagonally laid area cuts every perimeter unit at an angle and reuses almost none of it — and a herringbone pattern cuts every edge unit regardless of the shape.
How many 12 by 12 inch pavers does a 10 ft by 13 ft patio take?
143 pavers with the default 10% waste: the 130 sq ft at 1 sq ft a paver is 130 pavers, and 10% more is 143. The metric opening, 4 m by 3 m (12 m²) in the same 30.48 cm pavers, also comes to 143, since 12 m² is 129.2 pavers before the waste is added and the count is rounded up.
Should I enter the paver's nominal size or its actual size?
The actual size: the paver width field's guidance says to measure the paver itself, not the nominal size, for the most accurate count. The page divides the area by the length times width you enter, so a paver a little smaller than its label adds pavers across a large patio.
How do I count pavers for a pool surround or a patio with a planting bed in it?
Measure the length and width across the whole outside edge, then enter the pool, bed or tree pit in the Area Left Unpaved field. It comes off before the count, so the waste allowance is applied to the paving only; for a pool, add the coping band to it if the coping is bought separately.
Preliminary estimate, not certified engineering. This tool produces an indicative quantity calculation for planning purposes only — it is not a certified structural analysis, a guaranteed material takeoff, or a substitute for building department approval. Always verify measurements on-site and have a licensed contractor or structural engineer review any load-bearing, code-sensitive, or safety-critical work before purchasing materials or starting construction. Spotted an arithmetic or standards error? Report it to contact@craftquantities.com with your inputs — a confirmed fix gets a permanent check of its own, so the same mistake cannot come back.