Flexible Pavement AASHTO Structural Number (SN) Calculator
Calculate a flexible pavement's structural number (SN) from its layer thicknesses and layer coefficients, per the AASHTO 1993 design method.
Materials & Quantities
Road, yard and footway surfaces, and the things set into and beside them.

Asphalt tonnage, prime and tack coats and in-place density against Gmm; pavement design by AASHTO structural number and the edge stress an airfield slab sees; crown and cross-fall; pavers with their base, edging, jointing sand and pedestals; and the concrete elements of a paved surface — kerb and gutter, joint spacing, dowel bars, barriers, bollards.
Flexible or rigid. A flexible pavement is a layer-thickness problem answered in tonnes and structural number; a rigid one is a slab problem answered in volume, joint spacing and load transfer. They share a subgrade and almost nothing else, and a page written for one is not a conservative version of the other.
The base and sub-base under the surfacing, which is earthworks, and the drainage carrying water off it.
31 calculators
Calculate a flexible pavement's structural number (SN) from its layer thicknesses and layer coefficients, per the AASHTO 1993 design method.
Calculate the Westergaard edge stress in a concrete airfield pavement slab under a single wheel load, as a preliminary screening check.
Turn a pavement core's two specific gravities into percent of Gmm and the air void content that goes with it.
Calculate the asphalt emulsion prime coat material needed for a granular base course before paving.
Calculate the asphalt tack coat material needed between paving lifts.
Calculate the tonnage of aggregate base course material needed for a roadway.
Calculate the number of bollards needed to protect a length of frontage at a maximum spacing.
Calculate the number of line posts needed for a chain link fence run.
Calculate the concrete volume needed for a combined curb-and-gutter roadway section.
Estimate the tonnage of crushed stone or gravel base needed for a pavement or slab sub-base layer.
Post count for a W-beam highway guardrail run, at the AASHTO tangent spacing or the tighter spacing a transition calls for.
Calculate how many standard-length precast concrete barrier segments are needed for a run.
Estimate how many rolls of weed barrier landscape fabric you need for a garden bed or path.
Coils or straight lengths of lawn and bed edging for a measured edge, straight or curved, open or a closed bed, with the joints and the stakes along it.
Calculate how many standard riser rings are needed to build a manhole to its required depth.
Loose volume and delivered tonnage of the screeded No. 8 bedding course under permeable pavers, with the allowance for it closing up under compaction.
Calculate how many parking stalls fit along a single row of usable parking lot length.
Size and count load-transfer dowel bars for a concrete pavement joint, using standard ACPA sizing guidance.
Estimate the gravel base and bedding sand volume needed under a paver patio or walkway.
Estimate how many pavers you need for a patio or walkway, based on paver size and area.
Estimate how many sections of paver edging (restraint) you need around a patio or walkway's perimeter.
Estimate how many bags of polymeric sand you need to fill the joints in a paver patio or walkway.
Jointing stone for a permeable pavement: the first fill, the top-up the joints take during compaction, and what each later replenishment round needs.
Estimate how many bags of soil you need to fill a raised garden bed.
Calculate the glass bead material needed for retroreflective drop-on application over roadway striping paint.
Calculate the elevation drop from a roadway's centerline crown to its edge, for a target drainage cross-slope.
Calculate the concrete volume needed for a built-in landscape bench or planter seat wall.
Calculate the number of control joints needed along a concrete sidewalk run.
Calculate the concrete volume needed for a cylindrical traffic sign post foundation.
Calculate the asphalt or rubber material volume needed for a speed bump, accounting for its rounded cross-section.
Calculate the pump flow rate needed to turn over a decorative fountain or water feature basin within a target time.