SettingsSettings for this calculationUS
The horizontal distance from the roadway's centerline crown to the edge of pavement.
For a symmetric crown, this is half the total paved width.
The target drainage cross-slope from centerline to edge, as a percentage.
2% is a commonly used target cross-slope for roadway drainage design.
Edge elevation drop
2.76 in
They open the calculator with your figures already in it
Roadway Crown Cross-Slope Calculator: 2.76 in — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Edge elevation drop = half-width × target cross-slope percentage, the standard method for establishing a roadway crown's drainage slope from centerline to edge of pavement
Inputs used
- Half Roadway Width (Centerline to Edge)
- 11.5 ft
- Target Cross-Slope (%, Commonly 2%)
- 2
What this calculation does not cover
- The edge drop is worked as one straight gradient from crown to edge, so where a crown is built as a curve rather than two flat planes only the edge point matches — the pavement at intermediate offsets sits higher, with less drop, than a straight interpolation implies.
- A single half-width and a single cross-slope stand in for both sides of the road, so an asymmetric crown, a widened lane, or a different slope left and right has to be run twice and the two drops read separately.
- Longitudinal grade is absent from the arithmetic: where the road also falls along its length, water leaves the surface on a diagonal path and the true surface gradient is the resultant of the two slopes rather than the cross-slope alone.
- The cross-slope field accepts 1% to 4% only, so a superelevated curve banked beyond that band, or a deliberately flatter section, cannot be entered here.
- Half-width is read as a horizontal plan distance, so a width tape-measured along the crowned surface instead of taken off the drawing is fractionally long and inflates the drop by a correspondingly small amount.
- The figure describes the finished pavement surface between centreline and edge of pavement — course thicknesses, subgrade profile, and any gutter pan or shoulder break beyond that edge sit outside it.
Add the equipment this sizes
This result is a specification — 2.76 in — not a quantity. Put the thing it sizes into your project: how many, what you call it, and your supplier’s price.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-05 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Edge elevation drop = half-width × target cross-slope percentage, the standard method for establishing a roadway crown's drainage slope from centerline to edge of pavement