The measured field dry density (from a nuclear density gauge or sand cone test).
The field DRY density from the test, at the depth the specification cares about. A nuclear gauge reads wet density and subtracts a moisture reading — check which figure the printout gives before typing it in, because the wet density is several per cent higher and produces a compaction result that passes when the fill has not. A single test represents the material around it and nothing else: a passing result at one point is not a passing lift.
The maximum dry density from a laboratory Standard or Modified Proctor test.
Modified Proctor (higher compactive effort) gives a higher maximum density than Standard Proctor for the same soil.
The project specification's minimum required compaction percentage.
95% is common for structural fill; pavement subgrade or utility trench backfill specs vary, commonly 90-98%.
Percent compaction achieved
94.9 %
The compaction at this test point is 94.87%, below the 95% the specification calls for. This needs checking by a qualified person before you proceed. This compares what you measured with the figure specified for the work. Acceptance of the earthwork is the specifying engineer's, not this page's.
- Specified minimum
- 95 %
They open the calculator with your figures already in it
Standard/Modified Proctor Compaction Percentage Calculator: 94.87 % — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Standard compaction QC check: percent compaction = (field dry density / laboratory maximum Proctor dry density) x 100; most specifications require 90-98% depending on the application
Inputs used
- Field Dry Density
- 115.49 pcf
- Laboratory Maximum Proctor Density
- 121.73 pcf
- Specified Minimum Compaction (%)
- 95
Intermediate steps
- Specified minimum
- 95 %
Confidence note: The compaction at this test point is 94.87%, below the 95% the specification calls for. This needs checking by a qualified person before you proceed. This compares what you measured with the figure specified for the work. Acceptance of the earthwork is the specifying engineer's, not this page's.
What this calculation does not cover
- There is no moisture input. Both boxes take dry density, and nothing here checks the placement-moisture band that specifications normally pair with the density clause, so a lift can hit the percentage while being placed too dry or too wet of optimum. Enter a wet gauge reading in the field box by mistake and the percentage comes out inflated with no warning.
- The page assumes both densities are on the same basis and does not verify it. It has no way to know whether the laboratory maximum came from a Standard or a Modified Proctor, or whether that curve was run on the material actually in this lift rather than carried over from an earlier borrow face.
- No oversize correction is applied. A Proctor is run on screened material with the large particles taken out, so a gravelly or coarse fill can measure denser in the field than that curve suggests and read at or above 100% while still short of the compaction the specification intends.
- The percentage describes one test at one spot, to the depth that gauge or sand cone reaches. It carries no testing frequency, no lot size, and no view of whether acceptance rests on every individual test or on the average of a set with a floor under any single result.
- Both density boxes are limited to roughly 1,000-2,500 kg/m³ (about 62-156 pcf), and a value outside that is replaced by the nearest bound before the percentage is worked out. Lightweight aggregate and other low-density fills sit below the floor. The comparison shown is the arithmetic on the three numbers you typed, not an acceptance decision and not a check of bearing capacity, settlement or stability; where the fill carries a footing, slab, pavement or retaining structure that call belongs to the geotechnical engineer of record.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.1.1
Regulatory standards & verification citations1
- Standard compaction QC check: percent compaction = (field dry density / laboratory maximum Proctor dry density) x 100; most specifications require 90-98% depending on the application