EV charger installation takeoff
Fit a charge point for an electric car (a wallbox; an EVSE or Level 2 charger in North America): dust sheets along the route indoors, the dedicated circuit's run with its bends, in armoured cable or conduit, and a trench where the charger stands away from the house, with the supply check and the network operator's notice, the earthing, the charger, its isolator, the protection, the drive or lawn put back and the tests listed and never certified.
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
- 5Measurements in
- 3Trades out
Choose the build-up
Each layer changes the materials below; the dimensions stay the same.
Compare one layer at these dimensions, with the rest of the build-up held as you have it:
Give the job once
Every figure on the right follows these, in the units you choose.
Been given a quote for this job?
Paste it into the EV charger installation quote check: each line is read against these same calculators — what it leaves out, what it adds, and what to ask.
Check the quoteEvery trade, from those dimensions
then change a dimension, and each line shows what moved.
| Trade | Quantity | |
|---|---|---|
Dust sheets along the route indoorsMasking and Protection Materials CalculatorDust sheets over the floor along the cable's route indoors, at the calculator's opening sheet size: drilling through a wall and clipping along a skirting or a ceiling drops masonry dust on the floor below, and whatever is stored round the board comes out onto it while the circuit is connected. The count is for the floors; none is taped. Shown only where the route crosses a finished room.
Why this quantity?
Resting on
Change any other figure on the Masking and Protection Materials Calculator | 1 item | |
Dedicated circuit: cable run in EMT conduit, in duct (ducting) below ground, bends includedEMT Conduit Bend Length CalculatorThe circuit's route from the panel to the charger, the straight legs you gave with the buried leg added, and a quarter circle for each bend at the page's opening radius: the EMT conduit from the panel to the charger, as the site's worked example of a charger's circuit takes it, in the page's stock lengths. Below ground the conduit changes to PVC or rigid metal, which the same length covers; the wire pulled through it is the route's length plus a tail at each end, and its gauge is the electrician's.
Why this quantity?
Resting on
Change any other figure on the EMT Conduit Bend Length Calculator | 57.21 ft | |
Groundworks: trench excavation and backfill for the buried leg, warning tape laidTrench Excavation & Backfill Volume CalculatorThe trench from the house wall to the post, a spade's width and as deep as you gave, dug by hand once the buried services are traced. The dug volume is the working's excavation line, and that soil goes back over the duct with warning tape laid in it; the headline is the calculator's loose backfill with its opening allowance of 15% for compacting it, a check that the soil will fill the trench again, not a quantity to buy. What it does not take back, and any concrete or paving broken out, is cleared as listed work.
Why this quantity?
Resting on
The loose-volume allowance: the calculator's working figure, a trade convention. Change any other figure on the Trench Excavation & Backfill Volume Calculator | 1.23 yd³ | |
Dust sheets along the route indoorsMasking and Protection Materials CalculatorDust sheets over the floor along the cable's route indoors, at the calculator's opening sheet size: drilling through a wall and clipping along a skirting or a ceiling drops masonry dust on the floor below, and whatever is stored round the board comes out onto it while the circuit is connected. The count is for the floors; none is taped. Shown only where the route crosses a finished room.
Why this quantity? | 1 item | |
Dedicated circuit: armoured cable (SWA) run, clipped or in duct (ducting), bends includedEMT Conduit Bend Length CalculatorThe circuit's route from the consumer unit to the charger, the straight legs you gave with the buried leg added, and a quarter circle for each bend at the page's opening radius: the length of armoured cable (SWA) clipped direct to the walls and drawn through the duct in the trench. The page is written for conduit, and its arithmetic, straight legs plus arcs, is the cable's length as much as a conduit's; its stock-length line is the conduit's and does not apply to a cable bought by the metre. The cable's size is the electrician's, and a short tail at each end for the terminations comes on top.
Why this quantity? | 17.41 m | |
Groundworks: trench excavation and backfill for the buried leg, warning tape laidTrench Excavation & Backfill Volume CalculatorThe trench from the house wall to the post, a spade's width and as deep as you gave, dug by hand once the buried services are traced. The dug volume is the working's excavation line, and that soil goes back over the duct with warning tape laid in it; the headline is the calculator's loose backfill with its opening allowance of 15% for compacting it, a check that the soil will fill the trench again, not a quantity to buy. What it does not take back, and any concrete or paving broken out, is cleared as listed work.
Why this quantity? | 1.03 m³ (loose) |
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance on the row, or open its reasoning to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
Labour and programme
Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.
- Dust sheets along the route indoors0.2 h (0.1–0.5)
- Groundworks: trench excavation and backfill for the buried leg, warning tape laid3.7 h (2.0–8.2)
About 3.9 person-hours in the rows that carry them, between 2.2 and 8.6.
Trade by trade
- Labourer1 labourerhalf a day
About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.
1 row carries no hours of its own
- Dedicated circuit: cable run in EMT conduit, in duct (ducting) below ground, bends included: Electrical work is not rated here: it is work for a registered electrician, and access (open new walls against an occupied house being rewired) changes its time several-fold.
Labour and programme
Person-hours for the rows going in, from trade rules of thumb: a range for each piece of work, never a price.
- Dust sheets along the route indoors0.2 h (0.1–0.5)
- Groundworks: trench excavation and backfill for the buried leg, warning tape laid4.0 h (2.3–9.0)
About 4.3 person-hours in the rows that carry them, between 2.4 and 9.5.
Trade by trade
- Labourer1 labourerhalf a day
About half a day, one trade after another at eight hours a day. Left out: drying and curing, deliveries, inspections, trades overlapping.
1 row carries no hours of its own
- Dedicated circuit: armoured cable (SWA) run, clipped or in duct (ducting), bends included: Electrical work is not rated here: it is work for a registered electrician, and access (open new walls against an occupied house being rewired) changes its time several-fold.
Setups you have saved
The build-up, the dimensions and any allowance you changed — kept on this device, and reusable on any job. Your prices are not copied in: they stay in your price book, so a setup never holds a stale one.
How far does a budget go?
At your own prices, with this build-up unchanged.
About this job
A charge point is a charger fixed to a wall or a post by the drive, fed by a circuit of its own from the consumer unit (the service panel), and the first question is whether the house's supply can carry it at all. A charger draws its full current for hours at a time, so the electrician adds up what the house already takes at its busiest against the main fuse or the service's rating: where there is room, the charger is connected as it is; where there is not, it is set to hold back when the house is busy, through a current clamp on the incoming cable, or the network operator (the utility) upgrades the supply, which is its own work and excluded here. In Great Britain the network operator is told of the charger once it is connected, or asked first where the supply is tight; in the US the circuit is permitted work, inspected under the electrical code's article on EV charging (NEC Article 625), and in Canada under the Canadian Electrical Code's Section 86.
The rows follow the cable. It leaves a new way in the board, runs through the house, where the floors along its route are sheeted, goes out through a wall in a sleeved hole sealed behind it, and then either along the outside wall to a charger beside the drive or down into a trench to a post. In Britain it is usually armoured cable (SWA) clipped direct and laid in a duct where it is buried; in North America it runs in conduit, often EMT, with PVC below ground. The conduit page gives the route's developed length, its straight legs plus the curve of every bend, which is the cable's length either way. Where the route enters an integral or attached garage, the hole through the separating wall or ceiling is fire-stopped round the cable once it is through. A charger on a post needs the post held upright for years of cars pulling in beside it: it is bolted to a small concrete base cast at the trench's end or screwed into the ground, as the maker's instructions say, and that base is part of fitting the charger. Before any digging the ground is scanned for buried services; the trench is dug by hand, the duct laid with warning tape above it, and the trench backfilled with its own soil. Where it crosses a concrete drive, the concrete is saw-cut along both edges, broken out and filled back with new concrete to the surface; block paving is lifted and relaid and turf put back. Cutting and patching a tarmac (asphalt) drive is a surfacer's work, and excluded.
The electrical decisions are the electrician's, and each is listed here and never made. A charger outdoors on a supply whose neutral and earth are combined outside the house (PME, the common arrangement in Britain) needs either a device in the charger that cuts it off if that combined conductor is lost or an earth rod of its own, which is provisional until the supply has been examined. The circuit's protection against an earth fault is the line a charger's quote is worth reading for: in the UK the wiring regulations' section on EV charging asks for a Type B RCD, or a Type A where the charger detects a direct-current fault itself; in North America the electrical codes' EV charging rules ask for ground-fault protection for personnel. A switch that locks the charger off beside it is fitted where the charger has no isolation of its own or the rules ask for one, and the board is replaced where it has no spare way or cannot give the circuit that protection. The circuit is tested and recorded, the charger is set up on the owner's account, and the certificate, the notification and the acknowledgement are handed over.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Survey with the electrician before anything is bought: where the board is and whether it has a spare way and the protection the circuit needs, what the house draws at its busiest against the main fuse or service rating, how the supply is earthed, where the charger goes and the cable's route to it; tell or apply to the network operator (utility), and pull the permit where one is needed.
- Where the cable will be buried, trace the buried services along the trench's line and mark them; sheet the floors along the route indoors.
- Drill and sleeve the hole through the outside wall, and any hole into an integral or attached garage.
- Saw-cut a concrete drive along both edges of the trench's line, lift paving or turf, dig the trench by hand, set the post's base at its end, lay the duct with the cable drawn through it and warning tape above it, backfill with the dug soil, and put the concrete, the paving or the turf back.
- Run and fix the cable along its route above ground, clipped direct or in its conduit, seal the hole into a garage round the cable with its tested fire-stop, fix the charger to its wall or post, and drive and test an earth rod or fit the bonding where the supply's check asked for either.
- Isolate the board, connect the circuit to a new way with the protection the electrician chose, replacing the board where it has no room, fit the isolator beside the charger where one is needed and the current clamp where the supply calls for one.
- Test and record the circuit, switch on and set up the charger on the owner's account, make good the holes, clear the spoil and the broken concrete or paving, and hand over the certificate, the network operator's acknowledgement and the charger's manual and warranty.
What this takeoff does not cover
- A bigger supply to the house: a larger main fuse, a new incoming cable or meter, and whatever else is on the supplier's side of the meter. Checking the supply and the notice are listed.
- The earthing arrangement's design, which the electrician chooses once the supply has been examined: flagged here, and listed as a provisional item.
- The cable's size, the rating of the protective device at the board and the voltage drop along the route, all the electrician's from the wiring regulations; this site's gauge and voltage drop pages answer those, and none is reached here.
- A cable across the public footway (sidewalk) or a neighbour's land, and the permission for it.
- A supply to a detached garage or outbuilding with a board of its own: that is a feeder, the garden room takeoff's work, not a single circuit to one appliance.
- Tarmac (asphalt) over the trench, cut and patched by a surfacer; the drive's other surfaces put back are listed.
- The car's own lead, which comes with the car; a lead the installer supplies with the unit is listed with it.
- The app's paid subscriptions once it is set up, an energy tariff, and a grant with its forms.
- A second unit for another car, and a unit for a business, a workplace or a shared car park.
Quote check
Been given a quote for this job?
Paste it into the EV charger installation quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Electrical rough-in
3 tradesA starting outlet count by the North American spacing rule, the lighting load and the conduit run for first-fixing a single room.
Run this takeoffService panel upgrade
3 tradesCalculated service load by the NEC methods, a simplified floor to read it against, and the main breaker for the service being considered.
Run this takeoffRecessed lighting layout
3 tradesWhether the fittings you plan give the room enough light, how many a target level needs and at what spacing, and whether the circuit will carry them.
Run this takeoff
Frequently asked questions
- What does the EV charger installation takeoff give for a typical job?
- Opened at Floor along the cable's route indoors 6 m² · Cable route above ground, straight legs added 10 m · Bends in the route 6 · Buried run, house wall to the charger's post 6 m · Trench depth 0.5 m, it orders: Dust sheets along the route indoors, 1 item; Dedicated circuit: armoured cable (SWA) run, clipped or in duct (ducting), bends included, 17.4 m; Groundworks: trench excavation and backfill for the buried leg, warning tape laid, 1.03 m³ (loose). Opened at Floor along the cable's route indoors 65 sq ft · Cable route above ground, straight legs added 33 ft · Bends in the route 6 · Buried run, house wall to the charger's post 19.5 ft · Trench depth 1.5 ft: Dust sheets along the route indoors, 1 item; Dedicated circuit: cable run in EMT conduit, in duct (ducting) below ground, bends included, 57.2 ft; Groundworks: trench excavation and backfill for the buried leg, warning tape laid, 1.23 yd³. Every figure follows the dimensions you give it.
- Which calculators does the EV charger installation takeoff run?
- 3 calculators, one to a line: Masking and Protection Materials Calculator, EMT Conduit Bend Length Calculator, Trench Excavation & Backfill Volume Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the EV charger installation takeoff leave out?
- 9 things, each named on this page: A bigger supply to the house; The earthing arrangement's design, which the electrician chooses once the supply has been examined; The cable's size, the rating of the protective device at the board and the voltage drop along the route, all the electrician's from the wiring regulations; this site's gauge and voltage drop pages answer those, and none is reached here; A cable across the public footway (sidewalk) or a neighbour's land, and the permission for it; A supply to a detached garage or outbuilding with a board of its own; Tarmac (asphalt) over the trench, cut and patched by a surfacer; the drive's other surfaces put back are listed; The car's own lead, which comes with the car; a lead the installer supplies with the unit is listed with it; The app's paid subscriptions once it is set up, an energy tariff, and a grant with its forms; A second unit for another car, and a unit for a business, a workplace or a shared car park.
- Can I check a quote for this job against the takeoff?
- Yes. The EV charger installation quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.