Electrical rough-in takeoff

A starting outlet count by the North American spacing rule, the lighting load and the conduit run for first-fixing a single room.

Measurements in
5
Trades out
3
Calculators
3
Going in
3of 3
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
Outlet Spacing5 outlets (minimum)5 outlets (minimum)already wholenone
Lighting Circuit Connected Load360 W––
EMT Conduit Bend Length58.14 ft58.14 ftno pack size recordednone

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
Outlet Spacing5 outlets (minimum)5 outlets (minimum)already wholenone
Lighting Circuit Connected Load360 W––
EMT Conduit Bend Length17.74 m17.74 mno pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

3 of 3 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

Rough-in is the stage where the walls are open and every decision is cheap. Two days later the board is on and the same decision costs a chase, a patch and a repaint, which is why the outlet row is worth taking seriously even though it produces a starting count rather than a design. The North American codes let no point along a wall space sit more than 6 ft (1.8 m) from an outlet; UK wiring regulations set no spacing at all. The row runs the room's whole perimeter as one wall space, but a doorway or a fireplace ends one space and starts another, each counted on its own, so with two or more of them the code minimum can be higher than this row. Nobody has ever regretted the extra socket.

The lighting row is about the circuit rather than the fittings. A dozen downlights at fifty watts is six hundred watts, which is nothing; the same dozen on an old circuit already carrying the rest of the floor is what trips the breaker at the worst moment. The figure to watch is the total against the breaker rating, not the fixture count.

The conduit row assumes a run around the room's perimeter with a bend at each corner. A bend cuts its corner, so the straight legs are the perimeter less twice the bend radius at every bend, and the arcs are added back — a radiused corner takes slightly less conduit than a square one. That is a reasonable first pass for a surface or conduit installation and does nothing for a cable-and-clip job, where the length follows the route rather than the room.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Agree the layout with whoever will live in the room, marking positions on the studs.
  2. Check what is already on the circuit before adding to it.
  3. Set the boxes to the finished wall face, not the stud face — the board thickness is the usual error.
  4. Drill the studs at the centre and protect any run within striking distance of a fixing.
  5. Leave generous tails at every box; there is no such thing as too much slack at rough-in.
  6. Test and photograph the whole run before anything is boarded.

What this takeoff does not cover

  • The circuit design: how many circuits, what they carry, and how they land in the panel.
  • Cable, boxes, back-boxes, fixings and everything else bought by the piece.
  • Anything on a dedicated circuit — a cooker, a shower, an EV charger — which is sized on its own load rather than on a room.
  • Inspection, certification and the parts of this work that in most places only a licensed electrician may carry out.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Room length 5 m · Room width 4 m · Light fittings 6 and 2 more of the page's opening figures

No row of this job carries a production rate yet, so it has no hours here.

Imperial opening

Room length 16.5 ft · Room width 13 ft · Light fittings 6 and 2 more of the page's opening figures

No row of this job carries a production rate yet, so it has no hours here.

Quote check

Been given a quote for this job?

Paste it into the electrical rough-in quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the electrical rough-in takeoff give for a typical job?
Opened at Room length 5 m · Room width 4 m · Light fittings 6 · Conduit bends 4 · Conduit bend radius 150 mm, it orders: Outlet Spacing, 5 outlets (minimum); Lighting Circuit Connected Load, 360 W; EMT Conduit Bend Length, 17.7 m. Opened at Room length 16.5 ft · Room width 13 ft · Light fittings 6 · Conduit bends 4 · Conduit bend radius 6 in: Outlet Spacing, 5 outlets (minimum); Lighting Circuit Connected Load, 360 W; EMT Conduit Bend Length, 58.1 ft. Every figure follows the dimensions you give it.
Which calculators does the electrical rough-in takeoff run?
3 calculators, one to a line: Outlet Spacing Calculator, Lighting Circuit Connected Load Calculator, EMT Conduit Bend Length Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the electrical rough-in takeoff leave out?
4 things, each named on this page: The circuit design; Cable, boxes, back-boxes, fixings and everything else bought by the piece; Anything on a dedicated circuit; Inspection, certification and the parts of this work that in most places only a licensed electrician may carry out.
Can I check a quote for this job against the takeoff?
Yes. The electrical rough-in quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.