Mini-split installation takeoff
Capacity for the room, the plan area the outdoor unit and a margin round it take up, and the fall its condensate needs.
- Measurements in
- 4
- Trades out
- 3
- Calculators
- 3
- Going in
- 3of 3
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
Mini-splits are oversized more often than any other piece of domestic plant, and oversizing one makes the room worse rather than better. A unit with too much capacity satisfies the thermostat quickly, shuts down, and never runs long enough to dehumidify — so a correctly sized unit and an oversized one reach the same temperature and only one of them reaches it comfortably. The capacity row here is a rule-of-thumb estimate from floor area and a few conditions; a real selection is a room-by-room load calculation.
The footprint row is the one people discover late. An outdoor unit needs a level base, clearance for airflow on every side it breathes from, and enough room in front for somebody to service it — and the clearance, not the unit, is what usually decides whether the chosen spot works. Those clearances differ side by side and come from the unit's installation manual; the row adds a uniform 0.15 m (6 in) all round, so it is a first check on the space, not the clearance and not the concrete. The base only has to carry the unit — a technician can stand on gravel.
The condensate row looks trivial and causes a surprising share of callbacks. An indoor head produces litres of water a day in summer and drains it by gravity, so the line needs a continuous fall over its whole run. A drain that sags, or that rises to get over a joist, backs up into the unit and puts the water on the wall below it.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Size on the room's load, not on its floor area alone — and be suspicious of a round number.
- Choose the indoor position for the air throw, and the outdoor position for the clearance and the noise.
- Set the pad level and clear of the ground, where snow and leaves will not bury it.
- Core the wall with a slight fall to the outside, and sleeve it.
- Run the line set with generous bends, pressure-test and evacuate properly — this is what decides the lifespan.
- Confirm the condensate falls continuously along its whole run before commissioning.
What this takeoff does not cover
- A real load calculation. Room-by-room heat gain and loss is what a selection should rest on.
- The line set, its length limit, the additional refrigerant charge a long run needs, and the electrical supply.
- Wall penetration, bracket, trunking and the seal around the core.
- Noise at the boundary, which is what planning conditions and neighbours are concerned with.
- Anything requiring refrigerant handling, which is licensed work nearly everywhere.
- The manufacturer's airflow, discharge and service clearances, and the base's size, thickness and what goes under it.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Room floor area 40 m² · Outdoor unit width 0.9 m · Outdoor unit depth 350 mm and 1 more of the page's opening figures
No row of this job carries a production rate yet, so it has no hours here.
Imperial opening
Room floor area 430 sq ft · Outdoor unit width 3 ft · Outdoor unit depth 14 in and 1 more of the page's opening figures
No row of this job carries a production rate yet, so it has no hours here.
Quote check
Been given a quote for this job?
Paste it into the mini-split installation quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Electrical rough-in
3 tradesA starting outlet count by the North American spacing rule, the lighting load and the conduit run for first-fixing a single room.
Run this takeoffService panel upgrade
3 tradesCalculated service load by the NEC methods, a simplified floor to read it against, and the main breaker for the service being considered.
Run this takeoffRecessed lighting layout
3 tradesWhether the fittings you plan give the room enough light, how many a target level needs and at what spacing, and whether the circuit will carry them.
Run this takeoff
Frequently asked questions
- What does the mini-split installation takeoff give for a typical job?
- Opened at Room floor area 40 m² · Outdoor unit width 0.9 m · Outdoor unit depth 350 mm · Condensate run 5 m, it orders: Air Conditioner Size, 8,611 BTU/h; HVAC Equipment Pad/Curb Footprint, 0.78 m²; HVAC Condensate Drain Pipe Slope, 52.1 mm. Opened at Room floor area 430 sq ft · Outdoor unit width 3 ft · Outdoor unit depth 14 in · Condensate run 16.5 ft: Air Conditioner Size, 8,600 BTU/h; HVAC Equipment Pad/Curb Footprint, 8.67 sq ft; HVAC Condensate Drain Pipe Slope, 2.06 in. Every figure follows the dimensions you give it.
- Which calculators does the mini-split installation takeoff run?
- 3 calculators, one to a line: Air Conditioner Size Calculator, HVAC Equipment Pad/Curb Footprint Calculator, HVAC Condensate Drain Pipe Slope Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the mini-split installation takeoff leave out?
- 6 things, each named on this page: A real load calculation; The line set, its length limit, the additional refrigerant charge a long run needs, and the electrical supply; Wall penetration, bracket, trunking and the seal around the core; Noise at the boundary, which is what planning conditions and neighbours are concerned with; Anything requiring refrigerant handling, which is licensed work nearly everywhere; The manufacturer's airflow, discharge and service clearances, and the base's size, thickness and what goes under it.
- Can I check a quote for this job against the takeoff?