Irrigation zone takeoff

Head count by spacing, head count by available flow, and the trench to get water there.

Measurements in
7
Trades out
4
Calculators
3
Going in
4of 4
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Step 1 of 2

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Sprinkler Head Spacing and Count12 heads12 headsalready wholenone
Irrigation Zone5 heads per zone––
Trench Excavation & Backfill Volume1.52 yd³1.52 yd³no pack size recorded15%
Sand bed and cover round the pipe1.1 yd³1.1 yd³no pack size recorded15%

Every trade's quantity · 4 rows

4 of 4 going in
ItemQuantityOrderWaste / allowance
Sprinkler Head Spacing and Count12 heads12 headsalready wholenone
Irrigation Zone5 heads per zone––
Trench Excavation & Backfill Volume1.21 m³ (loose)1.21 m³loose) (no pack size recorded15%
Sand bed and cover round the pipe0.8456 m³ (loose)0.8456 m³loose) (no pack size recorded15%

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

4 of 4 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

An irrigation zone is decided twice and the two answers have to be reconciled. Geometry says how many heads the area needs: sprinklers are laid out head-to-head, each one a radius from its neighbour so that its throw reaches the next head, and the count falls out of the radius and the pattern. Hydraulics says how many heads the supply can actually run at once: a zone is limited by the flow available, and asking eight heads to share the flow for five gives eight heads that all under-perform and none that fails visibly.

When the two disagree — and they usually do — the area is split into more zones rather than the heads being spread thinner. That is the decision this page exists to put in front of you, and it is not one either calculator can make on its own, because one of them has never heard of the other.

Head-to-head is not over-watering. The spray from a sprinkler is far heavier near the head than at its edge, so overlapping the throws is what produces an even application. A layout spaced wider than the radius — out towards the full diameter, where the throws only just touch — leaves dry rings between heads that show up in the first hot week.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure the available flow and pressure at the tap or the point of connection first. Everything else follows from it.
  2. Zone by what the planting needs, not by what is convenient — lawn and beds want different schedules.
  3. Lay the heads out head-to-head, squaring off the corners of the zone.
  4. Check the head count against the zone's flow, and split the zone if it exceeds it.
  5. Trench deep enough to be below anything that will dig, and bed the pipe on sand.
  6. Flush the lines before fitting the nozzles, then run each zone and adjust the arcs.

What this takeoff does not cover

  • The controller, valves, backflow prevention and the point of connection.
  • Pipe sizing, which follows flow and run length rather than the zone's area.
  • Pressure loss along the run, and whether the last head still performs.
  • Winterisation, which in a freezing climate decides how the whole system is laid out.
  • Drip irrigation for beds, which is a different system with a different layout rule.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Zone length 12 m · Zone width 8 m · Trench run 30 m and 4 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer8.1 h (4.5–18)1 day
In all8.1 h (4.5–18)1 day

Imperial opening

Zone length 39 ft · Zone width 26 ft · Trench run 98 ft and 4 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Labourer1 labourer7.9 h (4.4–18)1 day
In all7.9 h (4.4–18)1 day

Quote check

Been given a quote for this job?

Paste it into the irrigation quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the irrigation takeoff give for a typical job?
Opened at Zone length 12 m · Zone width 8 m · Trench run 30 m · Trench depth 300 mm · Trench width 200 mm · Sand bed under the pipe 50 mm · Sand cover over the pipe 50 mm, it orders: Sprinkler Head Spacing and Count, 12 heads; Irrigation Zone, 5 heads per zone; Trench Excavation & Backfill Volume, 1.21 m³ (loose); Sand bed and cover round the pipe, 0.85 m³ (loose). Opened at Zone length 39 ft · Zone width 26 ft · Trench run 98 ft · Trench depth 11.8 in · Trench width 7.75 in · Sand bed under the pipe 2 in · Sand cover over the pipe 2 in: Sprinkler Head Spacing and Count, 12 heads; Irrigation Zone, 5 heads per zone; Trench Excavation & Backfill Volume, 1.52 yd³; Sand bed and cover round the pipe, 1.1 yd³. Every figure follows the dimensions you give it.
Which calculators does the irrigation takeoff run?
3 calculators, for 4 lines: Sprinkler Head Spacing and Count Calculator, Irrigation Zone Calculator, Trench Excavation & Backfill Volume Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the irrigation takeoff leave out?
5 things, each named on this page: The controller, valves, backflow prevention and the point of connection; Pipe sizing, which follows flow and run length rather than the zone's area; Pressure loss along the run, and whether the last head still performs; Winterisation, which in a freezing climate decides how the whole system is laid out; Drip irrigation for beds, which is a different system with a different layout rule.
Can I check a quote for this job against the takeoff?
Yes. The irrigation quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.