New staircase by type takeoff

Count a new staircase by its shape and its material: a straight flight, an L on a quarter landing or a U on a half landing, in timber (treads, risers, stringers and landing framing), cast concrete (concrete, formwork and the drawing's bars) or steel (stringers cut to length, tread plates, brackets and weight), with the handrail up the pitch, from the rise, the going and the width, the structure and the stairwell's trimming listed and never sized.

Measurements in
4
Trades out
2
Calculators
2
Going in
2of 2
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Choose the build-up

Each layer changes the materials below; the dimensions stay the same.

Material
Shape on plan
The rules the flight is read against
Material
Shape on plan
The rules the flight is read against

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 2 rows

2 of 2 going in
ItemQuantityOrderWaste / allowance
Treads, risers, stringers and any landing's framing14 treads14 treadsalready whole10%
Handrail up the pitch, each rail counted16.46 linear ft16.46 linear ftno pack size recorded10%

Every trade's quantity · 2 rows

2 of 2 going in
ItemQuantityOrderWaste / allowance
Treads, risers, stringers and any landing's framing14 treads14 treadsalready whole10%
Handrail up the pitch, each rail counted4.99 m4.99 mno pack size recorded10%

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

2 of 2 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A stair is set out from the rise before anything else: the height from finished floor to finished floor, shared into a whole number of equal risers near the height a comfortable step takes. The going (run) of each tread is chosen next, and the flight's length on plan follows, one tread fewer than the risers on a straight flight and one fewer again for every landing it turns on. The rows here take the rise, the going and the width once and hand them to the stair page that counts the material chosen, each dividing the rise near its own opening riser of 185 mm (7 1/4 in), so the riser count, the readout against the rules and the material all come off the same set-out.

The shape decides how much floor the stair takes. A straight flight needs its whole going in one line; an L turns a right angle on a quarter landing as wide as the stair; a U doubles back on a half landing twice the stair's width, with its two flights side by side. The timber row splits the risers between the flights and frames the landing; the concrete and steel rows count the same risers as one straight run, the concrete landing's slab at its full area, and say so.

The material decides who makes it and what the order is. A timber stair is usually a stair maker's flight, its strings, treads and risers cut from the boards the row counts. A cast stair is formwork, bars and concrete poured on site, and its waist and bars come from the engineer's drawing. A steel stair is a fabricator's, cut from rolled sections to a drawing and bolted in. In every case the stairwell trimmed in the floor above, the props, the landing's supports and the members' sizes are design, listed here and sized by the engineer or the maker; the readout flags a riser or going outside the rules chosen and never approves a stair.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Measure the rise from finished floor to finished floor, with every floor finish still to come, and the room on plan and the headroom available; settle the shape, the material and the riser and going, and tell building control or apply for the permit where the rules ask for one.
  2. Have the stairwell's trimming, the landing's supports and the flight itself designed: the engineer for a cast flight's waist and bars, the fabricator for a steel flight's sections and connections, the stair maker for a timber flight's strings.
  3. Trim the opening in the floor above, propped until the new trimmers carry it, and fix the landing's supports.
  4. For a cast stair: set up and prop the soffit, riser and side forms, fix the bars to the drawing, pour, finish and cure, and strike the forms once the engineer allows. For a timber or steel stair: carry the flight in or crane it in, set it to the floors, fix the strings to the trimmer and the wall, and frame or bolt in any landing.
  5. Fit the treads, nosings and finishes the material takes, then the handrail, the balusters and the guard along any landing's open edge.
  6. Clean up, have the stair inspected where the work was notified, and hand over the maker's or the engineer's drawings.

What this takeoff does not cover

  • The structure: the trimmers and any beam round the stairwell, the props, the landing's posts, hangers or ledgers, a cast flight's waist, bars and cover, and a steel flight's section, plates and connections. Each is listed as work or runs at its page's opening figure, which the structure limits name as a design input; none is sized here.
  • Approval of the stair: the rows read the riser and going against the rules chosen and flag what falls outside them; headroom, width, guarding and the stair's place in a fire escape route are building control's or the building official's.
  • Spiral and helical stairs, loft ladders and stairs that turn on winders: the site's spiral stair pages and the L- and U-shaped stair page's winder option count those.
  • Treads' finishes beyond the material itself: carpet, timber or stone cladding on a concrete flight, paint or galvanising on steel, and the stair's lighting.
  • The balustrade's infill panels or glass, and a balustrade on a landing beyond the rail's length the rail row counts.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter1 carpenter7.5 h (4.0–15)1 day
Rated rows7.5 h (4.0–15)1 day

Imperial opening

Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft and 1 more of the page's opening figures

TradeCrewPerson-hoursWorking days
Carpenter1 carpenter7.5 h (4.0–15)1 day
Rated rows7.5 h (4.0–15)1 day

Quote check

Been given a quote for this job?

Paste it into the new staircase quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the new staircase takeoff give for a typical job?
Opened at Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1, it orders: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 4.99 m. Opened at Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 16.5 linear ft. Every figure follows the dimensions you give it.
Which calculators does the new staircase takeoff run?
2 calculators, one to a line: L-Shaped and U-Shaped Stair Calculator (Landings, Winders, Stringers, Treads and Risers), Handrail Length Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the new staircase takeoff leave out?
5 things, each named on this page: The structure; Approval of the stair; Spiral and helical stairs, loft ladders and stairs that turn on winders; Treads' finishes beyond the material itself; The balustrade's infill panels or glass, and a balustrade on a landing beyond the rail's length the rail row counts.
Can I check a quote for this job against the takeoff?
Yes. The new staircase quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.