New staircase by type takeoff
Count a new staircase by its shape and its material: a straight flight, an L on a quarter landing or a U on a half landing, in timber (treads, risers, stringers and landing framing), cast concrete (concrete, formwork and the drawing's bars) or steel (stringers cut to length, tread plates, brackets and weight), with the handrail up the pitch, from the rise, the going and the width, the structure and the stairwell's trimming listed and never sized.
- Measurements in
- 4
- Trades out
- 2
- Calculators
- 2
- Going in
- 2of 2
- My Project
- Not in it
No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.
Dimensions
Give the job once
Every figure on the right follows these, in the units you choose.
Choose the build-up
Each layer changes the materials below; the dimensions stay the same.
Calculators behind the other choices:
Calculators behind the other choices:
Every trade, from those dimensions
then change a dimension, and each line shows what moved.
Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.
About this job
A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.
A stair is set out from the rise before anything else: the height from finished floor to finished floor, shared into a whole number of equal risers near the height a comfortable step takes. The going (run) of each tread is chosen next, and the flight's length on plan follows, one tread fewer than the risers on a straight flight and one fewer again for every landing it turns on. The rows here take the rise, the going and the width once and hand them to the stair page that counts the material chosen, each dividing the rise near its own opening riser of 185 mm (7 1/4 in), so the riser count, the readout against the rules and the material all come off the same set-out.
The shape decides how much floor the stair takes. A straight flight needs its whole going in one line; an L turns a right angle on a quarter landing as wide as the stair; a U doubles back on a half landing twice the stair's width, with its two flights side by side. The timber row splits the risers between the flights and frames the landing; the concrete and steel rows count the same risers as one straight run, the concrete landing's slab at its full area, and say so.
The material decides who makes it and what the order is. A timber stair is usually a stair maker's flight, its strings, treads and risers cut from the boards the row counts. A cast stair is formwork, bars and concrete poured on site, and its waist and bars come from the engineer's drawing. A steel stair is a fabricator's, cut from rolled sections to a drawing and bolted in. In every case the stairwell trimmed in the floor above, the props, the landing's supports and the members' sizes are design, listed here and sized by the engineer or the maker; the readout flags a riser or going outside the rules chosen and never approves a stair.
How each line reads
- Base
- What the calculator gives for these dimensions, before anything is added.
- Allowance
- Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
- Adjusted
- The base with its allowance on top.
- Order
- What to buy: the adjusted figure in whole boards, bags, rolls or lengths.
The order this happens in
Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.
- Measure the rise from finished floor to finished floor, with every floor finish still to come, and the room on plan and the headroom available; settle the shape, the material and the riser and going, and tell building control or apply for the permit where the rules ask for one.
- Have the stairwell's trimming, the landing's supports and the flight itself designed: the engineer for a cast flight's waist and bars, the fabricator for a steel flight's sections and connections, the stair maker for a timber flight's strings.
- Trim the opening in the floor above, propped until the new trimmers carry it, and fix the landing's supports.
- For a cast stair: set up and prop the soffit, riser and side forms, fix the bars to the drawing, pour, finish and cure, and strike the forms once the engineer allows. For a timber or steel stair: carry the flight in or crane it in, set it to the floors, fix the strings to the trimmer and the wall, and frame or bolt in any landing.
- Fit the treads, nosings and finishes the material takes, then the handrail, the balusters and the guard along any landing's open edge.
- Clean up, have the stair inspected where the work was notified, and hand over the maker's or the engineer's drawings.
What this takeoff does not cover
- The structure: the trimmers and any beam round the stairwell, the props, the landing's posts, hangers or ledgers, a cast flight's waist, bars and cover, and a steel flight's section, plates and connections. Each is listed as work or runs at its page's opening figure, which the structure limits name as a design input; none is sized here.
- Approval of the stair: the rows read the riser and going against the rules chosen and flag what falls outside them; headroom, width, guarding and the stair's place in a fire escape route are building control's or the building official's.
- Spiral and helical stairs, loft ladders and stairs that turn on winders: the site's spiral stair pages and the L- and U-shaped stair page's winder option count those.
- Treads' finishes beyond the material itself: carpet, timber or stone cladding on a concrete flight, paint or galvanising on steel, and the stair's lighting.
- The balustrade's infill panels or glass, and a balustrade on a landing beyond the rail's length the rail row counts.
Labour by trade
Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.
Metric opening
Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m and 1 more of the page's opening figures
Imperial opening
Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft and 1 more of the page's opening figures
Quote check
Been given a quote for this job?
Paste it into the new staircase quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.
What it leaves out
Every line this takeoff has that nothing on the quote reads as.
What it adds
Labour, removal, hire, fees — each named for what it is.
What to ask
One list of questions, ready to copy. Never a verdict.
More takeoffs
Other job takeoffs
Room fit-out
7 tradesBoard, fill, paint and floor a rectangular room, walls and ceiling, from one set of dimensions.
Run this takeoffStud partition
3 tradesStuds, jointing compound and outlets for a single run of internal partition.
Run this takeoffTile a floor
4 tradesBacker board, the thinset it is bedded in, tile and adhesive for a rectangular floor from one measurement.
Run this takeoff
Frequently asked questions
- What does the new staircase takeoff give for a typical job?
- Opened at Rise, finished floor to finished floor 2.7 m · Going of each tread (its run) 260 mm · Width of the stair 0.9 m · Handrails 1, it orders: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 4.99 m. Opened at Rise, finished floor to finished floor 9 ft · Going of each tread (its run) 10.3 in · Width of the stair 3 ft · Handrails 1: Treads, risers, stringers and any landing's framing, 14 treads; Handrail up the pitch, each rail counted, 16.5 linear ft. Every figure follows the dimensions you give it.
- Which calculators does the new staircase takeoff run?
- 2 calculators, one to a line: L-Shaped and U-Shaped Stair Calculator (Landings, Winders, Stringers, Treads and Risers), Handrail Length Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
- What does the new staircase takeoff leave out?
- 5 things, each named on this page: The structure; Approval of the stair; Spiral and helical stairs, loft ladders and stairs that turn on winders; Treads' finishes beyond the material itself; The balustrade's infill panels or glass, and a balustrade on a landing beyond the rail's length the rail row counts.
- Can I check a quote for this job against the takeoff?
- Yes. The new staircase quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.