Drywall ceiling takeoff

Boards, screws, tape, compound and control joints for a flat plasterboard ceiling from the room's two dimensions.

Measurements in
2
Trades out
5
Calculators
5
Going in
5of 5
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Ceiling Plasterboard (Gypsum Board Sheets)18 sheets18 sheetsalready whole10%
Drywall Ceiling Screw Count (Fastening Schedule)529 screws529 screwsalready wholenone
Drywall Joint Compound2 x 4.5 gal boxes2 x 4.5 gal boxesalready whole10%
Drywall Joint Tape326.88 ft326.88 ftno pack size recorded10%
Ceiling control joints across the length1 control joint1 control jointalready wholenone

Every trade's quantity · 5 rows

5 of 5 going in
ItemQuantityOrderWaste / allowance
Ceiling Plasterboard (Gypsum Board Sheets)19 sheets19 sheetsalready whole10%
Drywall Ceiling Screw Count (Fastening Schedule)534 screws534 screwsalready wholenone
Drywall Joint Compound31.81 kg31.81 kgno pack size recorded10%
Drywall Joint Tape101.2 m101.2 mno pack size recorded10%
Ceiling control joints across the length1 control joint1 control jointalready wholenone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

5 of 5 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A ceiling is the same material as a wall and a different job in every other respect. The board goes up over your head, which is why the screw schedule is tighter than a wall's and why the sheet size you can actually handle matters more than the sheet size that covers the area in fewest pieces. Two people can place a 2400 × 1200 (8 × 4 ft) sheet on a ceiling; one person cannot, and the quantity that assumes they can is the quantity that gets cut into halves on site with the waste that implies.

The control joint is the row people are surprised by. A ceiling that runs past about nine metres (30 ft) in either direction needs a break in the board, not because the board fails but because the building moves and the crack goes where nothing stopped it. It is a length of trim and twenty minutes, set against a plasterboard ceiling that has to be skimmed again a year later.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Check the joists are level and packed where they are not — a ceiling telegraphs every high spot.
  2. Mark the joist centres on the walls before the first sheet hides them.
  3. Board perpendicular to the joists, starting from one wall and staggering the ends.
  4. Fix at the schedule spacing, not by eye; a missed screw line shows as a sag in raking light.
  5. Set control joints where the run demands one, before taping rather than after.
  6. Tape and fill, then check with a light held flat to the surface.

What this takeoff does not cover

  • The framing above it. Joist size, spacing and whether the ceiling is carrying a floor are structural questions that a ceiling area cannot answer.
  • Insulation and any acoustic or fire-rated build-up, both of which change the board layers and the fixings.
  • Access hatches, downlight cutouts and anything else that makes a hole — each one takes board away and adds cutting time.
  • Skimming, if you are finishing in plaster rather than tape and joint compound; that is a different material and a different trade.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Ceiling length (longer side) 12 m · Ceiling width (shorter side) 4 m

TradeCrewPerson-hoursWorking days
Drywaller1 drywaller + 1 labourer6.1 h (3.4–11)half a day
Taper1 taper + 1 labourer7.7 h (4.3–15)half a day
In all14 h (7.7–27)1 day

Imperial opening

Ceiling length (longer side) 39 ft · Ceiling width (shorter side) 13 ft

TradeCrewPerson-hoursWorking days
Drywaller1 drywaller + 1 labourer5.8 h (3.2–11)half a day
Taper1 taper + 1 labourer7.5 h (4.2–15)half a day
In all13 h (7.5–26)1 day

Quote check

Been given a quote for this job?

Paste it into the drywall ceiling quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the drywall ceiling takeoff give for a typical job?
Opened at Ceiling length (longer side) 12 m · Ceiling width (shorter side) 4 m, it orders: Ceiling Plasterboard (Gypsum Board Sheets), 19 sheets; Drywall Ceiling Screw Count (Fastening Schedule), 534 screws; Drywall Joint Compound, 31.8 kg; Drywall Joint Tape, 101 m; Ceiling control joints across the length, 1 control joint. Opened at Ceiling length (longer side) 39 ft · Ceiling width (shorter side) 13 ft: Ceiling Plasterboard (Gypsum Board Sheets), 18 sheets; Drywall Ceiling Screw Count (Fastening Schedule), 529 screws; Drywall Joint Compound, 2 x 4.5 gal boxes; Drywall Joint Tape, 327 ft; Ceiling control joints across the length, 1 control joint. Every figure follows the dimensions you give it.
Which calculators does the drywall ceiling takeoff run?
5 calculators, one to a line: Ceiling Plasterboard Calculator (Gypsum Board Sheets), Drywall Ceiling Screw Count Calculator (Fastening Schedule), Drywall Joint Compound Calculator, Drywall Joint Tape Calculator, Drywall Ceiling Control Joint Spacing Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the drywall ceiling takeoff leave out?
4 things, each named on this page: The framing above it; Insulation and any acoustic or fire-rated build-up, both of which change the board layers and the fixings; Access hatches, downlight cutouts and anything else that makes a hole; Skimming, if you are finishing in plaster rather than tape and joint compound; that is a different material and a different trade.
Can I check a quote for this job against the takeoff?
Yes. The drywall ceiling quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.