LVP, laminate or engineered floor takeoff

Packs, underlay and levelling compound for a floating floor over an existing subfloor.

Measurements in
2
Trades out
3
Calculators
3
Going in
3of 3
My Project
Not in it

No figures of yours yet: a takeoff you add to My Project, or a setup you save, fills these boxes in one press.

Dimensions

Give the job once

Every figure on the right follows these, in the units you choose.

Every trade, from those dimensions

then change a dimension, and each line shows what moved.

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
LVP, Laminate & Engineered Floor10 packs10 packsalready whole7%
Laminate/Vinyl Plank Floor Underlayment Roll3 rolls3 rollsalready wholenone
Self-Leveling Underlayment (SLU) Volume33.43 gal33.43 galno pack size recordednone

Every trade's quantity · 3 rows

3 of 3 going in
ItemQuantityOrderWaste / allowance
LVP, Laminate & Engineered Floor10 packs10 packsalready whole7%
Laminate/Vinyl Plank Floor Underlayment Roll3 rolls3 rollsalready wholenone
Self-Leveling Underlayment (SLU) Volume120 L120 Lno pack size recordednone

Estimates, not a quote. Each row gives its base, the allowance on top, the adjusted figure and what to order; change an allowance in its cell, or open the row to see every figure it rests on. A trade's own page carries what it does not cover — open the one you are about to order against.

3 of 3 trades chosenNot pricedNot in project
Kept on this deviceUnitsImperialMetricMy Projectnot in it yetQuantities only · your own rates · not a structural check

About this job

A takeoff is the trade word for the shopping list a job produces — every material, and how much of each, worked out by its own cited calculator.

A floating floor is bought by the pack and laid by the room, and the gap between those two facts is the whole estimate. Packs cover a stated area, boards come in a fixed length, and the offcut at the end of each row only starts the next row if it is long enough to be worth starting one with — which is why a complex room with bays and returns takes materially more than its area, and a plain rectangle takes barely more than the pack rounding.

The levelling row is the one that decides whether the floor is quiet. A floating floor bridges a dip rather than following it, and every bridged dip is a click underfoot for as long as the floor is down. Three millimetres over two metres is the usual tolerance, and a floor that fails it needs compound before it needs boards — which is a bagged product, a drying time and a day, not an afterthought.

How each line reads

Base
What the calculator gives for these dimensions, before anything is added.
Allowance
Cutting waste, a lap or spare stock — named, with where it comes from, and changeable on the row.
Adjusted
The base with its allowance on top.
Order
What to buy: the adjusted figure in whole boards, bags, rolls or lengths.

The order this happens in

Quantities do not tell you the sequence, and on this job the sequence is where the money goes wrong.

  1. Let the boards acclimatise in the room, unopened, for as long as the maker says.
  2. Check the subfloor with a straightedge and level anything outside tolerance.
  3. Lay the underlay, taped at the joints, with the moisture barrier the right way up if it has one.
  4. Set out so the last row is not a sliver — measure the room and split the difference across the first and last.
  5. Keep the expansion gap at every edge, including around pipes and door frames.
  6. Trim last, fixed to the skirting or the wall and never to the floor.

What this takeoff does not cover

  • The expansion gap's cover: beading, thresholds and door bars, all of which are lengths rather than areas.
  • Removing what is there now, and disposing of it.
  • Trimming door bottoms, which almost every floating floor needs and which is a joinery job.
  • Underfloor heating compatibility — board thickness, underlay and the maker's maximum surface temperature all interact, and none of them is derived from an area.

Labour by trade

Person-hours from trade rules of thumb at each opening size, one crew per trade working in turn: a planning aid, never a price. The Labour tab follows your own figures.

Metric opening

Floor length 5 m · Floor width 4 m

TradeCrewPerson-hoursWorking days
Floor layer1 floor layer5.6 h (3.0–11)half a day
Plasterer1 plasterer + 1 labourer4.4 h (2.4–9.0)half a day
In all10 h (5.4–20)1 day

Imperial opening

Floor length 16.5 ft · Floor width 13 ft

TradeCrewPerson-hoursWorking days
Floor layer1 floor layer5.6 h (3.0–11)half a day
Plasterer1 plasterer + 1 labourer4.4 h (2.4–9.0)half a day
In all10.0 h (5.4–20)1 day

Quote check

Been given a quote for this job?

Paste it into the laminate or vinyl plank floor quote check. Every line of it is read against these same calculators and your measurements. Quantities only, never prices.

  • What it leaves out

    Every line this takeoff has that nothing on the quote reads as.

  • What it adds

    Labour, removal, hire, fees — each named for what it is.

  • What to ask

    One list of questions, ready to copy. Never a verdict.

More takeoffs

Other job takeoffs

All job takeoffs

Frequently asked questions

What does the laminate or vinyl plank floor takeoff give for a typical job?
Opened at Floor length 5 m · Floor width 4 m, it orders: LVP, Laminate & Engineered Floor, 10 packs; Laminate/Vinyl Plank Floor Underlayment Roll, 3 rolls; Self-Leveling Underlayment (SLU) Volume, 120 L. Opened at Floor length 16.5 ft · Floor width 13 ft: LVP, Laminate & Engineered Floor, 10 packs; Laminate/Vinyl Plank Floor Underlayment Roll, 3 rolls; Self-Leveling Underlayment (SLU) Volume, 33.4 gal. Every figure follows the dimensions you give it.
Which calculators does the laminate or vinyl plank floor takeoff run?
3 calculators, one to a line: LVP, Laminate & Engineered Floor Calculator, Laminate/Vinyl Plank Floor Underlayment Roll Calculator, Self-Leveling Underlayment (SLU) Volume Calculator. Each has a page of its own with its formula and its sources; the takeoff runs them all on one set of dimensions.
What does the laminate or vinyl plank floor takeoff leave out?
4 things, each named on this page: The expansion gap's cover; Removing what is there now, and disposing of it; Trimming door bottoms, which almost every floating floor needs and which is a joinery job; Underfloor heating compatibility.
Can I check a quote for this job against the takeoff?
Yes. The laminate or vinyl plank floor quote check reads a quote's lines against these same calculators and your measurements, and reports what it leaves out, what it adds and what to ask. It reads quantities, never prices.