Length along the eave, per slope.
Measure each slope separately — a roof with unequal sides needs two runs of this calculation.
Sloped distance from eave to ridge.
The true sloped length, not the horizontal run. Add the eave overhang and any allowance the panel profile needs at the ridge.
Net width after the side lap.
Use the coverage width the manufacturer publishes, not the overall panel width. A 470 mm panel with a 13 mm lap covers 457 mm, and ordering against the wider figure leaves the last panel short.
Panels required
26 panels per slope
Counts full-length panels on a rectangular slope. Ridge caps, eave and gable trims, closures and fixings are separate items.
- Panel length required
- 16.5 ft
- Total linear panel
- 429 ft
- Slope area
- 643.5 sq ft
- Both slopes
- 52 panels
- Coverage of the last panel used
- 0 ft
They open the calculator with your figures already in it
Metal Roof Panel Calculator: 26 panels per slope — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Panel coverage width is the net width after the side lap, and is what manufacturers publish for ordering
- MCA (Metal Construction Association) installation guidance: panels are run full length from eave to ridge wherever possible to avoid an end lap
Inputs used
- Eave length
- 39 ft
- Eave-to-ridge length
- 16.5 ft
- Panel coverage width
- 18 in
Intermediate steps
- Panel length required
- 16.5 ft
- Total linear panel
- 429 ft
- Slope area
- 643.5 sq ft
- Both slopes
- 52 panels
- Coverage of the last panel used
- 0 ft
Confidence note: Counts full-length panels on a rectangular slope. Ridge caps, eave and gable trims, closures and fixings are separate items.
What this calculation does not cover
- Assumes each panel runs the full eave-to-ridge length. Above the manufacturer's maximum length an end lap is required, which adds material and detailing.
- Hips, valleys and dormers are not counted; each generates raking cuts and additional flashing.
Add the equipment this sizes
This result is a specification — 26 panels per slope — not a quantity. Put the thing it sizes into your project: how many, what you call it, and your supplier’s price.
Part of a bigger job
This trade is one line of a job takeoff. Run the whole job and every other trade comes back with it, off the same measurements.
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-02 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations2
- Panel coverage width is the net width after the side lap, and is what manufacturers publish for ordering
- MCA (Metal Construction Association) installation guidance: panels are run full length from eave to ridge wherever possible to avoid an end lap
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To fix roof sheeting and soffit panels. Generic types, no brands, no prices.
Protection this work requires
- Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
- Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Fix roof sheeting and soffit panels: Roof work is the commonest cause of serious fall injury on domestic sites, and profiled sheeting adds a danger of its own: older fibre-cement and plastic sheets, and the rooflights set among them, can give way under a person's weight without warning. Edge protection or a properly erected tower is the equipment that matters most here, and a roof that is fragile, steep, high or wet is a job for a roofer with the right access and staging, not a longer ladder.
Show the 6 tools this job needsHide tools
Essential
Chalk line
Extension ladder
Impact driver
Metal snips
Tape measure
Tower scaffold or trestles
Also needed as materials: chalk refill, impact driver bits.
what each roofing tool is for, and the spec that decides which to buy where one does.