SettingsSettings for this calculationUS
The total perimeter of the building at the impact zone.
Measure the full perimeter of the building walls that pass through the high-impact reinforcement zone near grade.
The height of the impact-resistant mesh strip above grade.
EIFS systems commonly require heavier-weight impact-resistant mesh in a strip zone near grade, commonly the first 2 m (6-8 ft), where impact damage is most likely.
Impact-resistant mesh area needed
1,070 sq ft
Zone height and impact-resistance rating requirements vary by local code and EIFS manufacturer system — confirm the specific requirement for your project's traffic/impact exposure level.
They open the calculator with your figures already in it
EIFS Impact-Resistant Mesh Reinforcement Zone Calculator: 1,073 sq ft — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Impact zone area = wall perimeter × the reinforcement zone height, since EIFS systems commonly require heavier-weight impact-resistant mesh in a strip zone near grade (commonly the first 2 m / 6-8 ft above grade) where impact damage is most likely
Inputs used
- Wall Perimeter
- 165 ft
- Reinforcement Zone Height Above Grade
- 6.5 ft
Confidence note: Zone height and impact-resistance rating requirements vary by local code and EIFS manufacturer system — confirm the specific requirement for your project's traffic/impact exposure level.
What this calculation does not cover
- Perimeter times height is a plain band with nothing in it. Doors, windows, vents and louvers falling inside the impact zone are not deducted, and the reveals returning into each of those openings, plus the wrap around every outside corner and down to the base, add mesh back — often more than the openings removed on a facade with many of them. Both adjustments have to be made by hand.
- The impact zone usually takes two meshes, not one. In most manufacturers' details the heavy mesh is embedded first and standard mesh goes over it in a second base coat lift, because the coarse weave will not take the finish cleanly on its own. Within this zone, then, the standard mesh does not stop, and the base coat runs thicker to bury both layers.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of a bigger job
This trade is one line of a job takeoff. Run the whole job and every other trade comes back with it, off the same measurements.
also measures9 other trades
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Impact zone area = wall perimeter × the reinforcement zone height, since EIFS systems commonly require heavier-weight impact-resistant mesh in a strip zone near grade (commonly the first 2 m / 6-8 ft above grade) where impact damage is most likely
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To apply the basecoat and reinforcing mesh. Generic types, no brands, no prices.
Protection this work requires
- Cutting or grinding concrete, masonry, screed, tile or fibre-cement board releases respirable silica: cut wet or extract at the tool, and wear a P2/N95 respirator at minimum — a nuisance dust mask does not filter it.
- Wet cement and lime burn skin and eyes painlessly until the damage is done: waterproof gloves to EN 374, safety glasses whenever the mix can splash, and never kneel in wet mix in permeable trousers.
- Boards, blocks and bagged material cause most lasting back injuries on small sites: two people or a lifter for full sheets, and never a bag on one shoulder up a ladder.
- Most fatal falls on small jobs are from under three metres: use a tower or a ladder tied at the top, and never work off the top two rungs.
- Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Show the 6 tools this job needsHide tools
Essential
Mixing bucket or tub
Paddle mixer
Plastering trowel and hawk
Utility knife
Recommended
Metal snips
Spirit level
Also needed as materials: replacement blades.
what each plastering tool is for, and the spec that decides which to buy where one does.