SettingsSettings for this calculationUS
The total surface area to be waterproofed.
Measure the full surface area receiving the liquid-applied membrane.
The cured (dry) membrane thickness required by the manufacturer's spec.
This is the final, cured thickness the waterproofing system needs to perform — check the product's technical data sheet for the minimum required dry film thickness.
The percentage of the wet product that remains after solvent/water evaporates during cure.
A lower solids content means more wet material must be applied to achieve the same dry film thickness, since more volume is lost to evaporation.
Liquid membrane volume needed
25.2 gal
Solids content and dry film thickness requirements vary by manufacturer and application (horizontal vs. vertical, exposure condition) — confirm your specific product's technical data sheet for exact coverage rates.
- Required wet film thickness
- 75 mils
They open the calculator with your figures already in it
Cold-Applied Liquid Waterproofing Membrane Volume Calculator: 25.25 gal — shown in imperial, US market. The link sets both, so the result they see is the one on your screen.
Show calculation logicHide calculation logic
How this was calculated
Formula source(s)
- Wet film thickness = target dry film thickness ÷ solids content fraction, since liquid-applied membranes lose volume as solvent/water evaporates during cure; material volume = area × wet film thickness
Inputs used
- Area to Waterproof
- 540 sq ft
- Target Dry Film Thickness (mils)
- 60
- Product Solids Content (%)
- 80
Intermediate steps
- Required wet film thickness
- 75 mils
Confidence note: Solids content and dry film thickness requirements vary by manufacturer and application (horizontal vs. vertical, exposure condition) — confirm your specific product's technical data sheet for exact coverage rates.
What this calculation does not cover
- A cold-applied system is resin plus reinforcement, and the reinforcement drinks far more than the field coat does. Polyester fleece has to be wetted out from underneath and above to be properly embedded, and every upstand, internal corner, outlet, penetration and movement joint takes a reinforced detail band laid before the field goes down. Detailing consumes material at a rate that has nothing to do with the flat area, and it is where jobs run short.
- The area entered is a flat surface, and a waterproofed roof is not one. Upstands of 150 mm (6 in) and more right round the perimeter, kerbs to every rooflight and plant base, gutter cheeks and the flange of every outlet are all additional surface, and on a small busy roof that detail area can rival the field it surrounds.
Estimated cost — your price
This site holds no price list for this material — local prices vary too much to publish honestly. Enter your supplier's price and the result is costed with it.
Part of bigger jobs
This trade is one line of several job takeoffs. Run the whole job and every other trade comes back with it, off the same measurements.
also measures10 other trades
also measures24 other trades
Computed in your browser — nothing you enter is uploaded. Presented in US customary units and US trade terminology. Where a formula follows a published standard, that standard and its edition are cited beside it on this page; where none governs, the page says so. Local amendments override model codes — verify against the code in force where you build.
Sources checked 2026-09-06 · in the site-wide review of 2026-09-06 · v1.0.1
Regulatory standards & verification citations1
- Wet film thickness = target dry film thickness ÷ solids content fraction, since liquid-applied membranes lose volume as solvent/water evaporates during cure; material volume = area × wet film thickness
Cite this page
Your workspace
Most jobs need more than one number. Add the calculators you need next and they open right here, underneath this one — your figures stay on screen and nothing is lost to a page change.
Tools and safety for this job
To apply a liquid waterproofing membrane. Generic types, no brands, no prices.
Protection this work requires
- A dust mask does nothing about solvent vapour: ventilate through, and use an organic-vapour (A1) cartridge respirator in an enclosed room.
- Knives cause more site injuries than any power tool: cut away from your body, change blades often, and wear cut-resistant gloves to EN 388 level C for repeated cutting.
Show the 5 tools this job needsHide tools
Essential
Brushes
Roller frame, sleeves and tray
Recommended
Mixing bucket or tub
Paddle mixer
Utility knife
Also needed as materials: replacement blades, roller sleeves.
what each waterproofing tool is for, and the spec that decides which to buy where one does.